12.01.2014 Views

HP Bitumen Handbook - Hindustan Petroleum Corporation Limited

HP Bitumen Handbook - Hindustan Petroleum Corporation Limited

HP Bitumen Handbook - Hindustan Petroleum Corporation Limited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

11. bitumen requirements for<br />

various road applications<br />

Quantity of <strong>Bitumen</strong><br />

(Kg per 10sqm)<br />

11.1 Prime coat over granular base:<br />

a) Low porosity (WMM or WBM) 6 to 9<br />

b) Medium porosity (Cement stablized) 9 to 12<br />

c) High porosity (Gravel base) 12 to 15<br />

11.2 Tack coat:<br />

a) Normal bituminous surface 2.0 to 2.5<br />

b) Dry hungry bituminous surface 2.5 to 3.0<br />

c) Granular surface treated with primer 2.5 to 3.0<br />

d) Non-bituminous surface<br />

(i) Granular base (not primed) 3.5 to 4.0<br />

(ii) Cement concrete pavement 3.0 to 3.5<br />

11.3 Bituminous penetration macadam:<br />

a) Compacted thickness 50 mm 50<br />

b) Compacted thickness 75 mm 68<br />

11.4 Bituminous macadam:<br />

Total bitumen content - 3 to 3.5 % by weight of total mix.<br />

11.5 Built up spray grout: 15<br />

11.6 Dense bituminous macadam:<br />

Total bitumen content - 4 % by weight of total mix.<br />

11.7 Surface dressing:<br />

a) Single coat or first coat of 2 coats 18<br />

b) Second coat 10<br />

11.8 Open grade premix carpet:<br />

a) 13.2 mm stone chipping 9.5<br />

b) 11.2 mm stone chipping 5.1<br />

22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!