11.01.2014 Views

Tip-Off - Hillyard

Tip-Off - Hillyard

Tip-Off - Hillyard

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Scrub & Recoat, Dry Preparation<br />

1<br />

Inspect<br />

<strong>Tip</strong>-<strong>Off</strong>®<br />

1. Inspect the floor for any gum or tape that must be removed.<br />

2. Consult the product labels for more detailed instructions.<br />

3. Note anything that needs addressed or discussed with the customer prior to proceeding.<br />

2<br />

Clean and Abrade*<br />

Equipment & Supplies<br />

• Terry cloth towels<br />

• Push broom<br />

• Mop bucket & wringer<br />

• <strong>Hillyard</strong> Pre-Game®<br />

• 175-rpm floor machine<br />

& driver<br />

• 3M Surface Preparation<br />

Pads (SPP)<br />

Procedures<br />

1. Dilute Pre-Game (1:4) into mop bucket, soak terry cloth towel, wring out.<br />

2. Pre-clean the floor by damp tacking until clean and allow the floor to dry.**<br />

3. Using floor machine, abrade the entire floor thoroughly with the 3M SPPs,<br />

overlapping appropriately.<br />

4. SPPs should be flipped after 250 ft² (or a maximum of 500 ft²) and<br />

changed after each side has been used once.<br />

5. Vacuum and dispose of dust following directions on gym finish label.<br />

* Wood floors must contain sufficient finish build for wet preparation method.<br />

New or sanded floors should be recoated 2-3 times before wet preparation.<br />

Glue-down installations should only be prepared dry.<br />

** A Quick-Pass may also be used for tacking.<br />

3<br />

Damp<br />

Dry<br />

Tack<br />

Equipment & Supplies<br />

• Terry cloth towels<br />

• Push broom<br />

• Mop bucket & wringer<br />

• Chix Brand Stretch ‘N<br />

Dust tool and cloths<br />

• Blue painter’s tape<br />

Procedures<br />

1. Dilute Pre-Game (1:4) into mop bucket, soak terry cloth towel, wring out.<br />

2. Damp tack the floor until clean and allow the floor to dry.*<br />

3. Dry tack the floor with the Chix Stretch ‘N Dust tool and cloths.<br />

4. Tape off any volleyball standards or related objects within the court with<br />

blue painter’s tape to prevent finishing over them.<br />

* A Quick-Pass may also be used for tacking.<br />

®<br />

P.O. Box 909<br />

St. Joseph, MO 64502<br />

1-800-365-1555<br />

www.hillyard.com<br />

Page 1 of 3<br />

Subject to change without notice. 04/11/13


Scrub & Recoat, Wet Preparation<br />

1<br />

Inspect<br />

<strong>Tip</strong>-<strong>Off</strong>®<br />

1. Inspect the floor for any gum or tape that must be removed.<br />

2. Consult the product labels for more detailed instructions.<br />

3. Note anything that needs addressed or discussed with the customer prior to proceeding.<br />

2<br />

Autoscrubber Option<br />

Clean, Scrub and Abrade<br />

Equipment & Supplies<br />

• Automatic scrubber<br />

• 3M Surface Preparation<br />

Pads (SPP)<br />

• <strong>Hillyard</strong> Pre-Game®<br />

Procedures<br />

Wood floors must contain sufficient finish build for wet preparation method.<br />

New or sanded floors should be recoated 2-3 times before wet preparation.<br />

Glue-down installations should only be prepared dry.<br />

1. Dilute Pre-Game (1:4) into solution tank and place 3M SPPs on<br />

automatic scrubber. Apply solution, scrub, and vacuum in one operation.<br />

2. Scrub the floor thoroughly, overlapping appropriately.<br />

3. SPPs should be flipped after 250 ft² (or a maximum of 500 ft²) and<br />

changed after each side has been used once.<br />

4. The floor should also be rinsed with clean water to remove any squeegee<br />

marks or residue left behind.<br />

Floor Machine Option<br />

Equipment & Supplies<br />

• 175-rpm floor machine<br />

& driver<br />

• <strong>Hillyard</strong> Pre-Game<br />

• 3M Surface Preparation<br />

Pads (SPP)<br />

• Mop buckets, clean mops<br />

& handles<br />

• Wet vacuum<br />

Procedures<br />

1. Dilute Pre-Game (1:4) into mop bucket.<br />

2. Apply the Pre-Game solution over a 10’ x 10’ area and scrub the floor<br />

thoroughly with the 3M SPPs, overlapping appropriately.<br />

3. SPPs should be flipped after 250 ft² (or a maximum of 500 ft²) and<br />

changed after each side has been used once.<br />

4. Vacuum the slurry with a wet vacuum.<br />

5. Rinse the same area with clean water and pick up with a wet vacuum.<br />

6. Repeat these steps until entire floor has been properly cleaned and abraded.<br />

3<br />

Damp<br />

Dry<br />

Tack<br />

Equipment & Supplies<br />

• Terry cloth towels<br />

• Push broom<br />

• Mop bucket & wringer<br />

• Chix Brand Stretch ‘N<br />

Dust tool and cloths<br />

• Blue painter’s tape<br />

Procedures<br />

1. Dilute Pre-Game (1:4) into mop bucket, soak terry cloth towel, wring out.<br />

2. Damp tack the floor until clean and allow the floor to dry.*<br />

3. Dry tack the floor with the Chix Stretch ‘N Dust tool and cloths.<br />

4. Tape off any volleyball standards or related objects within the court with<br />

blue painter’s tape to prevent finishing over them.<br />

* A Quick-Pass may also be used for tacking.<br />

®<br />

P.O. Box 909<br />

St. Joseph, MO 64502<br />

1-800-365-1555<br />

www.hillyard.com<br />

Page 2 of 3<br />

Subject to change without notice. 04/11/13


Scrub & Recoat, Application<br />

4<br />

Apply <strong>Tip</strong>-<strong>Off</strong>, T-Bar Method<br />

<strong>Tip</strong>-<strong>Off</strong>®<br />

Equipment & Supplies<br />

• Lightweight T-Bar<br />

• Synthetic T-Bar pad<br />

• Watering can<br />

• <strong>Hillyard</strong> Maroon pads<br />

• <strong>Tip</strong>-<strong>Off</strong><br />

Procedures<br />

1. Run a bead of <strong>Tip</strong>-<strong>Off</strong> the length of the gym using the watering can.<br />

2. Saturate the T-Bar pad and pull the applicator at a 30° angle the length of<br />

the floor, always keeping the <strong>Tip</strong>-<strong>Off</strong> flowing towards the unfinished<br />

side of the floor.<br />

3. When reaching the end of the run, turn the T-Bar 180° and pull in the<br />

opposite direction. Always feather with the grain of the wood.<br />

4. Continue until the entire floor is coated. <strong>Tip</strong>-<strong>Off</strong> should be applied<br />

at a rate of 500-700 ft²/gallon.<br />

5. Turn on the exhaust system 1-2 hours after application.<br />

6. Allow the floor to dry at least 4 hours before proceeding.*<br />

7. Abrade the floor with <strong>Hillyard</strong> maroon pads at a rate of 250 ft²/side and<br />

tack as stated in Step 3.<br />

8. Apply a second and final coat of <strong>Tip</strong>-<strong>Off</strong> in the same manner.<br />

9. Turn on the exhaust system 1-2 hours after application.<br />

Apply <strong>Tip</strong>-<strong>Off</strong>, <strong>Hillyard</strong> Multi-Flo XP® Method<br />

* Temperature and humidity will affect the drying and curing properties.<br />

5<br />

Allow <strong>Tip</strong>-<strong>Off</strong> to Cure<br />

Equipment & Supplies<br />

• Multi-Flo XP w/pads<br />

• Lightweight T-Bar<br />

• T-Bar pad<br />

• Watering can<br />

• <strong>Hillyard</strong> Maroon pads<br />

• <strong>Tip</strong>-<strong>Off</strong><br />

Procedures<br />

1. Place <strong>Tip</strong>-<strong>Off</strong> container on Multi-Flo XP and set up Multi-Flo XP as described in<br />

manual.<br />

2. We suggest using the long bar only and zero weights, however one weight may be<br />

needed to keep the long bar in contact with the floor.<br />

3. Run a bead of finish the length of the gym using the Multi-Flo XP.<br />

4. Saturate the Multi-Flo XP pads and pull the applicator at a 30° angle the length of<br />

the floor, always keeping the <strong>Tip</strong>-<strong>Off</strong> flowing towards the unfinished side of the<br />

floor.<br />

5. When reaching the end of the run, turn the applicator 180° and pull the Multi-Flo<br />

XP in the opposite direction. A lightweight T-Bar may be used to feather the ends.<br />

6. Continue until the entire floor is coated. <strong>Tip</strong>-<strong>Off</strong> should be applied at a rate of 500-<br />

700 ft²/gallon.<br />

7. Turn on the exhaust system 1-2 hours after application.<br />

8. Allow the floor to dry at least 4 hours before proceeding.*<br />

9. Abrade the floor with <strong>Hillyard</strong> maroon pads at a rate of 250 ft²/side and tack as<br />

stated in Step 3.<br />

10. Apply a second and final coat of <strong>Tip</strong>-<strong>Off</strong> in the same manner.<br />

11. Turn on the exhaust system 1-2 hours after application.<br />

* Temperature and humidity will affect the drying and curing properties.<br />

• Allow <strong>Tip</strong>-<strong>Off</strong> to cure at least 72 hours before opening up to light traffic and one week before<br />

opening up to athletic use.<br />

®<br />

P.O. Box 909<br />

St. Joseph, MO 64502<br />

1-800-365-1555<br />

www.hillyard.com<br />

Page 3 of 3<br />

Subject to change without notice. 04/11/13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!