Tip-Off - Hillyard
Tip-Off - Hillyard
Tip-Off - Hillyard
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Scrub & Recoat, Dry Preparation<br />
1<br />
Inspect<br />
<strong>Tip</strong>-<strong>Off</strong>®<br />
1. Inspect the floor for any gum or tape that must be removed.<br />
2. Consult the product labels for more detailed instructions.<br />
3. Note anything that needs addressed or discussed with the customer prior to proceeding.<br />
2<br />
Clean and Abrade*<br />
Equipment & Supplies<br />
• Terry cloth towels<br />
• Push broom<br />
• Mop bucket & wringer<br />
• <strong>Hillyard</strong> Pre-Game®<br />
• 175-rpm floor machine<br />
& driver<br />
• 3M Surface Preparation<br />
Pads (SPP)<br />
Procedures<br />
1. Dilute Pre-Game (1:4) into mop bucket, soak terry cloth towel, wring out.<br />
2. Pre-clean the floor by damp tacking until clean and allow the floor to dry.**<br />
3. Using floor machine, abrade the entire floor thoroughly with the 3M SPPs,<br />
overlapping appropriately.<br />
4. SPPs should be flipped after 250 ft² (or a maximum of 500 ft²) and<br />
changed after each side has been used once.<br />
5. Vacuum and dispose of dust following directions on gym finish label.<br />
* Wood floors must contain sufficient finish build for wet preparation method.<br />
New or sanded floors should be recoated 2-3 times before wet preparation.<br />
Glue-down installations should only be prepared dry.<br />
** A Quick-Pass may also be used for tacking.<br />
3<br />
Damp<br />
Dry<br />
Tack<br />
Equipment & Supplies<br />
• Terry cloth towels<br />
• Push broom<br />
• Mop bucket & wringer<br />
• Chix Brand Stretch ‘N<br />
Dust tool and cloths<br />
• Blue painter’s tape<br />
Procedures<br />
1. Dilute Pre-Game (1:4) into mop bucket, soak terry cloth towel, wring out.<br />
2. Damp tack the floor until clean and allow the floor to dry.*<br />
3. Dry tack the floor with the Chix Stretch ‘N Dust tool and cloths.<br />
4. Tape off any volleyball standards or related objects within the court with<br />
blue painter’s tape to prevent finishing over them.<br />
* A Quick-Pass may also be used for tacking.<br />
®<br />
P.O. Box 909<br />
St. Joseph, MO 64502<br />
1-800-365-1555<br />
www.hillyard.com<br />
Page 1 of 3<br />
Subject to change without notice. 04/11/13
Scrub & Recoat, Wet Preparation<br />
1<br />
Inspect<br />
<strong>Tip</strong>-<strong>Off</strong>®<br />
1. Inspect the floor for any gum or tape that must be removed.<br />
2. Consult the product labels for more detailed instructions.<br />
3. Note anything that needs addressed or discussed with the customer prior to proceeding.<br />
2<br />
Autoscrubber Option<br />
Clean, Scrub and Abrade<br />
Equipment & Supplies<br />
• Automatic scrubber<br />
• 3M Surface Preparation<br />
Pads (SPP)<br />
• <strong>Hillyard</strong> Pre-Game®<br />
Procedures<br />
Wood floors must contain sufficient finish build for wet preparation method.<br />
New or sanded floors should be recoated 2-3 times before wet preparation.<br />
Glue-down installations should only be prepared dry.<br />
1. Dilute Pre-Game (1:4) into solution tank and place 3M SPPs on<br />
automatic scrubber. Apply solution, scrub, and vacuum in one operation.<br />
2. Scrub the floor thoroughly, overlapping appropriately.<br />
3. SPPs should be flipped after 250 ft² (or a maximum of 500 ft²) and<br />
changed after each side has been used once.<br />
4. The floor should also be rinsed with clean water to remove any squeegee<br />
marks or residue left behind.<br />
Floor Machine Option<br />
Equipment & Supplies<br />
• 175-rpm floor machine<br />
& driver<br />
• <strong>Hillyard</strong> Pre-Game<br />
• 3M Surface Preparation<br />
Pads (SPP)<br />
• Mop buckets, clean mops<br />
& handles<br />
• Wet vacuum<br />
Procedures<br />
1. Dilute Pre-Game (1:4) into mop bucket.<br />
2. Apply the Pre-Game solution over a 10’ x 10’ area and scrub the floor<br />
thoroughly with the 3M SPPs, overlapping appropriately.<br />
3. SPPs should be flipped after 250 ft² (or a maximum of 500 ft²) and<br />
changed after each side has been used once.<br />
4. Vacuum the slurry with a wet vacuum.<br />
5. Rinse the same area with clean water and pick up with a wet vacuum.<br />
6. Repeat these steps until entire floor has been properly cleaned and abraded.<br />
3<br />
Damp<br />
Dry<br />
Tack<br />
Equipment & Supplies<br />
• Terry cloth towels<br />
• Push broom<br />
• Mop bucket & wringer<br />
• Chix Brand Stretch ‘N<br />
Dust tool and cloths<br />
• Blue painter’s tape<br />
Procedures<br />
1. Dilute Pre-Game (1:4) into mop bucket, soak terry cloth towel, wring out.<br />
2. Damp tack the floor until clean and allow the floor to dry.*<br />
3. Dry tack the floor with the Chix Stretch ‘N Dust tool and cloths.<br />
4. Tape off any volleyball standards or related objects within the court with<br />
blue painter’s tape to prevent finishing over them.<br />
* A Quick-Pass may also be used for tacking.<br />
®<br />
P.O. Box 909<br />
St. Joseph, MO 64502<br />
1-800-365-1555<br />
www.hillyard.com<br />
Page 2 of 3<br />
Subject to change without notice. 04/11/13
Scrub & Recoat, Application<br />
4<br />
Apply <strong>Tip</strong>-<strong>Off</strong>, T-Bar Method<br />
<strong>Tip</strong>-<strong>Off</strong>®<br />
Equipment & Supplies<br />
• Lightweight T-Bar<br />
• Synthetic T-Bar pad<br />
• Watering can<br />
• <strong>Hillyard</strong> Maroon pads<br />
• <strong>Tip</strong>-<strong>Off</strong><br />
Procedures<br />
1. Run a bead of <strong>Tip</strong>-<strong>Off</strong> the length of the gym using the watering can.<br />
2. Saturate the T-Bar pad and pull the applicator at a 30° angle the length of<br />
the floor, always keeping the <strong>Tip</strong>-<strong>Off</strong> flowing towards the unfinished<br />
side of the floor.<br />
3. When reaching the end of the run, turn the T-Bar 180° and pull in the<br />
opposite direction. Always feather with the grain of the wood.<br />
4. Continue until the entire floor is coated. <strong>Tip</strong>-<strong>Off</strong> should be applied<br />
at a rate of 500-700 ft²/gallon.<br />
5. Turn on the exhaust system 1-2 hours after application.<br />
6. Allow the floor to dry at least 4 hours before proceeding.*<br />
7. Abrade the floor with <strong>Hillyard</strong> maroon pads at a rate of 250 ft²/side and<br />
tack as stated in Step 3.<br />
8. Apply a second and final coat of <strong>Tip</strong>-<strong>Off</strong> in the same manner.<br />
9. Turn on the exhaust system 1-2 hours after application.<br />
Apply <strong>Tip</strong>-<strong>Off</strong>, <strong>Hillyard</strong> Multi-Flo XP® Method<br />
* Temperature and humidity will affect the drying and curing properties.<br />
5<br />
Allow <strong>Tip</strong>-<strong>Off</strong> to Cure<br />
Equipment & Supplies<br />
• Multi-Flo XP w/pads<br />
• Lightweight T-Bar<br />
• T-Bar pad<br />
• Watering can<br />
• <strong>Hillyard</strong> Maroon pads<br />
• <strong>Tip</strong>-<strong>Off</strong><br />
Procedures<br />
1. Place <strong>Tip</strong>-<strong>Off</strong> container on Multi-Flo XP and set up Multi-Flo XP as described in<br />
manual.<br />
2. We suggest using the long bar only and zero weights, however one weight may be<br />
needed to keep the long bar in contact with the floor.<br />
3. Run a bead of finish the length of the gym using the Multi-Flo XP.<br />
4. Saturate the Multi-Flo XP pads and pull the applicator at a 30° angle the length of<br />
the floor, always keeping the <strong>Tip</strong>-<strong>Off</strong> flowing towards the unfinished side of the<br />
floor.<br />
5. When reaching the end of the run, turn the applicator 180° and pull the Multi-Flo<br />
XP in the opposite direction. A lightweight T-Bar may be used to feather the ends.<br />
6. Continue until the entire floor is coated. <strong>Tip</strong>-<strong>Off</strong> should be applied at a rate of 500-<br />
700 ft²/gallon.<br />
7. Turn on the exhaust system 1-2 hours after application.<br />
8. Allow the floor to dry at least 4 hours before proceeding.*<br />
9. Abrade the floor with <strong>Hillyard</strong> maroon pads at a rate of 250 ft²/side and tack as<br />
stated in Step 3.<br />
10. Apply a second and final coat of <strong>Tip</strong>-<strong>Off</strong> in the same manner.<br />
11. Turn on the exhaust system 1-2 hours after application.<br />
* Temperature and humidity will affect the drying and curing properties.<br />
• Allow <strong>Tip</strong>-<strong>Off</strong> to cure at least 72 hours before opening up to light traffic and one week before<br />
opening up to athletic use.<br />
®<br />
P.O. Box 909<br />
St. Joseph, MO 64502<br />
1-800-365-1555<br />
www.hillyard.com<br />
Page 3 of 3<br />
Subject to change without notice. 04/11/13