07.01.2014 Views

Hill PDA Proposal Letter Template - Hastings Council

Hill PDA Proposal Letter Template - Hastings Council

Hill PDA Proposal Letter Template - Hastings Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ABN 52 003 963 755<br />

3 rd Floor 234 George Street Sydney<br />

GPO Box 2748 Sydney NSW 2001<br />

t. +61 2 9252 8777<br />

f. +61 2 9252 6077<br />

e. sydney@hillpda.com<br />

w. www.hillpda.com<br />

4 July, 2012<br />

Peter Cameron<br />

Port Macquarie <strong>Hastings</strong> <strong>Council</strong><br />

By email: Peter.Cameron@pmhc.nsw.gov.au<br />

Dear Peter,<br />

Re: Submission on Draft Structure Plan from Sovereign <strong>Hill</strong>s<br />

As per your instructions I have reviewed the letter of objection from Hopkins Consultants on behalf of Sovereign<br />

<strong>Hill</strong>s. The submission objects to the draft structure plan because it would allow bulky goods retailing on land<br />

between the new and old Oxley Highways near Major Innes Road. I disagree with deferral of the matter for the<br />

reasons discussed hereunder.<br />

The area has been under consideration for some time under the Urban Growth Management Strategy (UGMS).<br />

The background to the retail component of the UGMS was a 2010 report by <strong>Hill</strong> <strong>PDA</strong> being a review of <strong>Council</strong>’s<br />

Retail Strategy. There were a number of conclusions from that study including the following:<br />

Firstly there were a number of requirements for a successful bulky goods cluster being:<br />

Large land area preferably on the fringe of a major or regional shopping centre;<br />

Main road frontage or strong visual exposure from a main road that carries considerable traffic;<br />

Having a large trade area and being located in the middle of, or near the entry of, the trade area;<br />

Preferably having a trade area that is affluent and/or experiencing household growth.<br />

The subject site on the corner of the old and new Oxley Highways is an ideal location that meets the above<br />

requirements.<br />

Secondly there is a shortage of sites for future growth of bulky goods retailing. In the Port Macquarie market the<br />

usual form for bulky goods retailing is low cost single storey construction with outdoor at grade car parking.<br />

Parking under the retail level in a semi-basement car park is possible but the feasibility becomes questionable in<br />

non-metropolitan areas.<br />

Thirdly demand for bulky goods in Port Macquarie will increase at around 1,000sqm to 1,200sqm (GLA) every<br />

year which translates to a required land area of around 1ha every four years. Around 24,000sqm of bulky goods<br />

floor space is required between 2009 and 2031.


Fourthly whilst demand increases gradually, supply often steps up in quantum leaps due to the large formats of<br />

bulky goods retailers. A super centre with one or two anchor tenants and 15 to 20 specialties could be as large<br />

as 20,000sqm.<br />

Fifthly a single retailer such as Masters hardware house requires a significant floor area of 13,500sqm and a site<br />

area of around 3ha. A large proportion of the building is used for storage of home building supplies and a<br />

significant proportion of trade relates to wholesale trade. This is a model which blurs the boundary between<br />

retailing and industrial use. We understand that Masters is keen to have a store in Port Macquarie and the<br />

subject site is ideally suited.<br />

Lastly There are very few, if any, remaining opportunities in Lake Road and <strong>Hastings</strong> River Drive. The best<br />

location for a significant expansion of bulky goods (super centre or cluster) is along Oxley Highway between the<br />

Pacific Highway and Innes Lake. This is the main entry point to Port Macquarie from the highway. The site has<br />

considerable visual exposure from the road and accessibility is excellent.<br />

Under the DCP Sovereign <strong>Hill</strong>s may have up to 5,000sqm of bulky goods retailers – but this is insufficient to meet<br />

long term demand (say 25,000sqm over the next 20 years) nor is it sufficient to accommodate a large format<br />

retailer like a Masters store which requires 13,500sqm.<br />

For all the above reasons, I believe that deferral of the matter, as recommended in the letter of objection, is not<br />

necessary.<br />

Should you have any questions, please do not hesitate to contact us in our Sydney office on 02 9252 8777.<br />

Yours sincerely,<br />

Adrian Hack, (BTP, MLE, MPIA)<br />

Principal<br />

File Name: C11237 Port Macquarie Reponse to Submission by Soverign <strong>Hill</strong>s on Draft Structure Plan<br />

Date Printed: 4/07/2012 1:28:00 PM<br />

Liability limited by a scheme approved under the Professional Standards Legislation<br />

C12237 - Area 13 Town Centre Planning Advice P a g e | 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!