Plug Setting Aid System<br />

The plug setting aid system combines the field proven BHKA<br />

disconnect assembly and sacrificial tubing plug cementing<br />

operations with two new products: the drillable tail pipe<br />

centralizer and the centralizer diverter shoe. These items,<br />

when used together, help with setting a competent cement<br />

plug in vertical, inclined, and horizontal wellbore conditions.<br />

The drillable centralizer and centralizer diverter shoe help<br />

centralize the sacrificial tubing by incorporating multiple<br />

layers of flexible fabric belt diffusers that also direct the flow<br />

of cement into the sacrificial tubing and wellbore annulus.<br />

The diffusers are fully adjustable in size and flow pattern to<br />

allow the “trapping” of a cement plug between the top of the<br />

diverter shoe through the centralizers and up to the BHKA<br />

disconnect tool. All of these items can be used together as a<br />

system or separately to enhance cement plug setting<br />

operations.<br />

Drillable Tailpipe<br />

Diverter<br />

Drillable Tailpipe<br />

Centralizer<br />

Basic Operation of the PSA Concept<br />

• Install centralized diverter shoe on end of tubing.<br />

• Run the plug-setting tubing string to bottom.<br />

• Sacrificial tubing string installed from bottom of where<br />

cement plug is to be placed, up to desired top of cement<br />

(TOC) and the tubing release point.<br />

• TOC point to include another drillable centralizer.<br />

– Note: Additional drillable tubing centralizers can be<br />

used if required.<br />

• BHKA-disconnect tool installed on top of upper most<br />

drillable centralizer.<br />

• Run in hole with standard retrievable work string tubing<br />

to surface.<br />

• Use <strong>Halliburton</strong> dart/ball-drop cementing head.<br />

• While circulating, drop the diverter ball to activate the<br />

drillable diverter and circulate clean the interval where<br />

the cement plug will be set.<br />

• Set the cement plug with the option of using a more<br />

aggressive cement design because the tubing string will<br />

not be removed.<br />

– Higher viscosity/density.<br />

– Faster set/gelling time.<br />

– Higher lost circulation material (LCM) concentrations.<br />

• Release displacement dart from surface and displace to<br />

balance plug as calculated and until dart lands.<br />

• Pressure up on tubing string and activate the disconnect,<br />

then pull tubing up above top of plug for reverse out<br />

option, or pull out of hole as pre-determined.<br />

Top View of Drillable Tailpipe Diverter and Centralizer<br />

Plug Setting Aids <strong>13</strong>-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!