volume 1 - Halifax Regional Municipality
volume 1 - Halifax Regional Municipality
volume 1 - Halifax Regional Municipality
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Halifax</strong> Water Integrated Resource Plan<br />
Integrated Resource Plan Development and Evaluation<br />
procedures are presented in Volume 3 Appendix C. All capital costs presented for<br />
the RWWFP have been harmonized with regard to costing procedure used by the<br />
IRP. All capital costs are presented in $2012 using an ENRCC Index value of 9200.<br />
• Additional (change in) O&M costs were developed using the procedures described<br />
in Volume 3 Appendices B and C. The costs account for labour, energy, and<br />
chemicals as well as such consumables as UV bulbs and membrane filter cartridges.<br />
Additional O&M costs for upgrade/expansion projects were started the year after<br />
the project was implemented.<br />
• All programs/projects and O&M costs were allocated to one or more IRP objectives.<br />
The cost split among objectives was based on best professional judgment. The splits<br />
are recorded in the financial models presented in Volume 3 Appendix F.<br />
• The Enhanced Overflow Control Program was allocated in total to Objective 6. The<br />
asset renewal costs arising from the asset renewal modeling were allocated to<br />
Objective 8. These program costs incorporated the <strong>Halifax</strong> Water Five-Year Capital<br />
Plan specific asset renewal projects. The RWWFP costs were allocated primarily to<br />
Objective 13 reflecting the need to offset the impacts of growth on the existing<br />
wastewater system. Some RWWFP costs were however allocated to Objectives 6<br />
and 14.<br />
5.7 PLAN FORMULATION AND EVALAUTION OVERVIEW<br />
Considering the key drivers - regulatory compliance, asset renewal and growth - an<br />
initial set of 28 alternative resource plans were developed to meet the water,<br />
wastewater, and stormwater service needs of <strong>Halifax</strong> Water's service areas through to<br />
the year 2043. The initial plans reflected variations on the timing and nature of<br />
wastewater system compliance; levels of asset renewal investment, and the degree of<br />
overflow control.<br />
The initial plans were evaluated in terms of their 30-year net present value (NPV) cost,<br />
their compliance timing, and their potential environmental and public health impacts.<br />
Based on this analysis, 18 intermediate plans worthy of further consideration were<br />
identified. Using a single composite asset renewal strategy, redundant intermediate<br />
plans were eliminated and 10 refined plans were developed. The 30-year NPV at this<br />
stage in the alternative resource plan development and analysis was similar for all<br />
resource plans. Based on environmental and public health impacts the 10 refined plans<br />
were further reduced to 4 short-list plans. A recommended plan was selected from the 4<br />
short-list plans based on the benefits of nutrient control and the enhanced overflow<br />
control program.<br />
Revision: 2012-10-29 Integrated Resource Plan 57<br />
October 31 2012 Page 90 of 272