<strong>Halifax</strong> Water Integrated Resource Plan<br />

Integrated Resource Plan Development and Evaluation<br />

procedures are presented in Volume 3 Appendix C. All capital costs presented for<br />

the RWWFP have been harmonized with regard to costing procedure used by the<br />

IRP. All capital costs are presented in $2012 using an ENRCC Index value of 9200.<br />

• Additional (change in) O&M costs were developed using the procedures described<br />

in Volume 3 Appendices B and C. The costs account for labour, energy, and<br />

chemicals as well as such consumables as UV bulbs and membrane filter cartridges.<br />

Additional O&M costs for upgrade/expansion projects were started the year after<br />

the project was implemented.<br />

• All programs/projects and O&M costs were allocated to one or more IRP objectives.<br />

The cost split among objectives was based on best professional judgment. The splits<br />

are recorded in the financial models presented in Volume 3 Appendix F.<br />

• The Enhanced Overflow Control Program was allocated in total to Objective 6. The<br />

asset renewal costs arising from the asset renewal modeling were allocated to<br />

Objective 8. These program costs incorporated the <strong>Halifax</strong> Water Five-Year Capital<br />

Plan specific asset renewal projects. The RWWFP costs were allocated primarily to<br />

Objective 13 reflecting the need to offset the impacts of growth on the existing<br />

wastewater system. Some RWWFP costs were however allocated to Objectives 6<br />

and 14.<br />

5.7 PLAN FORMULATION AND EVALAUTION OVERVIEW<br />

Considering the key drivers - regulatory compliance, asset renewal and growth - an<br />

initial set of 28 alternative resource plans were developed to meet the water,<br />

wastewater, and stormwater service needs of <strong>Halifax</strong> Water's service areas through to<br />

the year 2043. The initial plans reflected variations on the timing and nature of<br />

wastewater system compliance; levels of asset renewal investment, and the degree of<br />

overflow control.<br />

The initial plans were evaluated in terms of their 30-year net present value (NPV) cost,<br />

their compliance timing, and their potential environmental and public health impacts.<br />

Based on this analysis, 18 intermediate plans worthy of further consideration were<br />

identified. Using a single composite asset renewal strategy, redundant intermediate<br />

plans were eliminated and 10 refined plans were developed. The 30-year NPV at this<br />

stage in the alternative resource plan development and analysis was similar for all<br />

resource plans. Based on environmental and public health impacts the 10 refined plans<br />

were further reduced to 4 short-list plans. A recommended plan was selected from the 4<br />

short-list plans based on the benefits of nutrient control and the enhanced overflow<br />

control program.<br />

Revision: 2012-10-29 Integrated Resource Plan 57<br />