<strong>Halifax</strong> Water Integrated Resource Plan<br />

Executive Summary<br />

HRM planning department provided a range growth projections for use by the IRP<br />

project team. Based on the mid-range of those projections the following growth<br />

estimates were developed and applied to the IRP and the RWWFP:<br />

• Residential growth to 2046 – 159,240 persons.<br />

• Employment area growth to 2046 – 698.1 ha.<br />

The impact of growth was examined for both the water and wastewater systems. Most<br />

of the new growth is planned to occur in the urban core or adjacent areas. Very little of<br />

the growth other than infill is expected in the satellite communities. Hence the impacts<br />

were primarily on the large water and wastewater facilities and associated distribution<br />

or collection systems. New separated stormwater systems would be developed at the<br />

same time as the new growth areas and the impact on existing infrastructure would<br />

likely be small.<br />

Major facilities that will require expansion due to growth include:<br />

• The Lake Major WSP will be well within plant capacity but reaching the water<br />

withdrawal permit at the end of 2046. There will be a need for exploring additional<br />

water supplies beyond the 2046 horizon.<br />

• The potential demand at the Bennery Lake WSP is predicted to surpass the safe<br />

yield and water withdrawal permit by 2016 and the plant’s capacity between 2021-<br />

2026. Therefore, during the timeframe of the IRP there is a need to expand the<br />

Bennery Lake WSP, increase safe yield of the lake (e.g. using a dam or pumping<br />

from Grand Lake), and submit an application to NSE to request an increase in the<br />

Water Withdrawal Permit.<br />

• The RWWFP recommended a plan that provides a regional wastewater strategy<br />

with upgrades required at a number of WWTFs as well as linking conveyance<br />

systems. WWTF expansion will be required as follows:<br />

- Dartmouth – A 16.06 ML/d capacity expansion (2021 - 2026 horizon).<br />

- Herring Cove – A 53.55 ML/d capacity expansion (2031 - 2036 horizon).<br />

- Aerotech – A further 4.65 ML/d capacity expansion (2031 - 2036 horizon), in<br />

addition to the 3.00 ML/d capacity expansion project already underway.<br />

• In addition, there are a number of growth-related water and wastewater projects<br />

expanding transmission mains, pumping facilities and sewers.<br />

ES 5.2.2<br />

Regulatory Compliance<br />

The second IRP driver involved consideration of current and future regulatory<br />

compliance requirements for all three systems.<br />

Revision: 2012-10-29 Integrated Resource Plan – Executive Summary ES-7<br />

October 31 2012 Page 9 of 272