<strong>Halifax</strong> Water Integrated Resource Plan<br />

Integrated Resource Plan Drivers and Objectives<br />

Table 4.3<br />

Current and Future Compliance Requirements for WWTFs<br />

WWTF<br />

Current Compliance with<br />

NSE Requirements<br />

<strong>Halifax</strong> • Non-compliant<br />

• IRP included projects:<br />

o Process optimization<br />

Dartmouth • Non- compliant<br />

• IRP included projects:<br />

o Process optimization<br />

Compliance with WSER<br />

Requirements<br />

• WSER requires secondary<br />

treatment by 2032<br />

• IRP included projects:<br />

o Add secondary<br />

treatment system<br />

• WSER requires secondary<br />

treatment by 2032<br />

• IRP included projects:<br />

o Assess and<br />

upgrade/expand UV<br />

disinfection system<br />

o Add secondary<br />

treatment system<br />

Herring Cove • Compliant • WSER requires secondary<br />

treatment by 2032<br />

• IRP included projects:<br />

o Add secondary<br />

treatment system<br />

Eastern<br />

Passage<br />

Lockview/<br />

MacPherson<br />

(Fall River)<br />

Middle<br />

Musquodoboit<br />

• Non-compliant<br />

• IRP included projects:<br />

o Upgrade to secondary<br />

treatment and expand<br />

WWTF<br />

• Non-compliant<br />

• IRP included projects:<br />

o Modifications to<br />

equalization tank<br />

o Modifications to<br />

secondary clarifiers<br />

o Additional filtration<br />

capacity<br />

o UV system upgrade<br />

• No additional upgrades<br />

required<br />

• No additional upgrades<br />

required<br />

• Compliant • No additional upgrades<br />

required<br />

North Preston • Non-compliant<br />

• IRP included projects:<br />

o Supplemental alkalinity<br />

addition required<br />

o Complete a biological<br />

treatment capacity<br />

assessment<br />

o Establish benefit of<br />

wetland to effluent<br />

quality through<br />

monitoring<br />

• No additional upgrades<br />

required<br />

Future Nutrient<br />

Requirements for Limited<br />

Receiving Waters<br />

• None<br />

• None<br />

• None<br />

• None<br />

• Possible LOT facility<br />

• Site specific Environmental<br />

Risk Assessment (ERA)<br />

should determine effluent<br />

limits<br />

• Possible LOT facility<br />

• Site specific Environmental<br />

Risk Assessment (ERA)<br />

should determine effluent<br />

limits<br />

• Possible LOT facility<br />

• Site specific Environmental<br />

Risk Assessment (ERA)<br />

should determine effluent<br />

limits<br />

Revision: 2012-10-29 Integrated Resource Plan 37<br />

October 31 2012 Page 70 of 272