Halifax Water Integrated Resource Plan Stakeholder Outreach Table 2.2 Purpose of Stakeholder Technical Conferences Technical Conference (TC) Date Purpose TC1 March 24, 2011 TC2 October 4, 2011 TC3 December 14, 2011 TC4 March 21, 2012 TC5 June 28, 2012 Overview of the purpose and background of the overall IRP process and the review of the IRP Terms of Reference. Outline of the IRP drivers and constraints, review the demand and supply options, and review the assumptions being used for development of the IRP resource plans. Details of Halifax Water’s mandate with respect to water, wastewater, and stormwater services. Overview of the methodology used for formulating the alternative resource plans, outline of the resource plan components, and presentation of the preliminary alternative resource plans. Review of the alternative resource plans and the preliminary financial modeling results, outline of the proposed programs, and discussion of the qualitative benefits of the plans. Overview of the plan evaluation results and selection of the Recommended IRP, the IRP Implementation Plan, and the IRP recommendations. Briefing packages were prepared for each of the technical conferences and made available to stakeholders. The packages contained necessary information on the particular technical conference including maps, graphs, tables, and resource plans. During the technical conferences the IRP team presented the information noted in Table 2.2 and documented the discussion from the stakeholders. Documentation included questions and comments given by stakeholders and Halifax Water. Meeting summaries of the technical conferences, presentation materials, and conference agendas were posted on the Halifax Water IRP website, available publically at: http://www.halifax.ca/hrwc/IntegratedResourcePlan.html. Other specific stakeholder consultations included: • Access to the IRP study SharePoint site for viewing IRP related documents. • Replies to questions issued by stakeholders throughout the process. • Stakeholder’s input on the IRP’s Recommended IRP. • Direct engagement by stakeholders with NSUARB’s representatives (Tellus). Written submissions received from stakeholders also form part of the consultation record and were considered in the IRP. Revision: 2012-10-29 Integrated Resource Plan 7 October 31 2012 Page 40 of 272
Halifax Water Integrated Resource Plan Stakeholder Outreach 2.5 STAKEHOLDER COMMENTS Volume 2 of the IRP provides a summary record of comments received from stakeholders (meeting summaries) during the one-on-one sessions and the five Technical Conferences. Halifax Water and its consultants addressed the stakeholder comments, where appropriate, throughout the preparation of the IRP. Stakeholder comments also raised future issues that will be addressed upon specific IRP reviews and subsequent applications being filed with the NSUARB. The IRP can serve as a helpful guide and reference plan for all stakeholders, Halifax Water, and the NSUARB as future applications are considered. Revision: 2012-10-29 Integrated Resource Plan 8 October 31 2012 Page 41 of 272
- Page 1 and 2: VOLUME 1: INTEGRATED RESOURCE PLAN
- Page 3 and 4: Halifax Water Integrated Resource P
- Page 5 and 6: Halifax Water Integrated Resource P
- Page 7 and 8: Halifax Water Integrated Resource P
- Page 9 and 10: Halifax Water Integrated Resource P
- Page 11 and 12: Halifax Water Integrated Resource P
- Page 13 and 14: Halifax Water Integrated Resource P
- Page 15 and 16: Halifax Water Integrated Resource P
- Page 17 and 18: Halifax Water Integrated Resource P
- Page 19 and 20: Halifax Water Integrated Resource P
- Page 21 and 22: Halifax Water Integrated Resource P
- Page 23 and 24: Halifax Water Integrated Resource P
- Page 25 and 26: Halifax Water Integrated Resource P
- Page 27 and 28: Halifax Water Integrated Resource P
- Page 29 and 30: Halifax Water Integrated Resource P
- Page 31 and 32: Halifax Water Integrated Resource P
- Page 33 and 34: Halifax Water Integrated Resource P
- Page 35 and 36: Halifax Water Integrated Resource P
- Page 37 and 38: Halifax Water Integrated Resource P
- Page 39: Halifax Water Integrated Resource P
- Page 43 and 44: Halifax Water Integrated Resource P
- Page 45 and 46: Halifax Water Integrated Resource P
- Page 47 and 48: Halifax Water Integrated Resource P
- Page 49 and 50: Halifax Water Integrated Resource P
- Page 51 and 52: Halifax Water Integrated Resource P
- Page 53 and 54: Halifax Water Integrated Resource P
- Page 55 and 56: Halifax Water Integrated Resource P
- Page 57 and 58: Halifax Water Integrated Resource P
- Page 59 and 60: Halifax Water Integrated Resource P
- Page 61 and 62: Halifax Water Integrated Resource P
- Page 63 and 64: Halifax Water Integrated Resource P
- Page 65 and 66: Halifax Water Integrated Resource P
- Page 67 and 68: Halifax Water Integrated Resource P
- Page 69 and 70: Halifax Water Integrated Resource P
- Page 71 and 72: Halifax Water Integrated Resource P
- Page 73 and 74: Halifax Water Integrated Resource P
- Page 75 and 76: Halifax Water Integrated Resource P
- Page 77 and 78: Halifax Water Integrated Resource P
- Page 79 and 80: Halifax Water Integrated Resource P
- Page 81 and 82: Halifax Water Integrated Resource P
- Page 83 and 84: Halifax Water Integrated Resource P
- Page 85 and 86: Halifax Water Integrated Resource P
- Page 87 and 88: Halifax Water Integrated Resource P
- Page 89 and 90: Halifax Water Integrated Resource P
<strong>Halifax</strong> Water Integrated Resource Plan<br />
Stakeholder Outreach<br />
Table 2.2<br />
Purpose of Stakeholder Technical Conferences<br />
Technical<br />
Conference<br />
(TC)<br />
Date<br />
Purpose<br />
TC1 March 24, 2011<br />
TC2 October 4, 2011<br />
TC3 December 14, 2011<br />
TC4 March 21, 2012<br />
TC5 June 28, 2012<br />
Overview of the purpose and background of the overall IRP process and<br />
the review of the IRP Terms of Reference.<br />
Outline of the IRP drivers and constraints, review the demand and supply<br />
options, and review the assumptions being used for development of the<br />
IRP resource plans. Details of <strong>Halifax</strong> Water’s mandate with respect to<br />
water, wastewater, and stormwater services.<br />
Overview of the methodology used for formulating the alternative<br />
resource plans, outline of the resource plan components, and<br />
presentation of the preliminary alternative resource plans.<br />
Review of the alternative resource plans and the preliminary financial<br />
modeling results, outline of the proposed programs, and discussion of<br />
the qualitative benefits of the plans.<br />
Overview of the plan evaluation results and selection of the<br />
Recommended IRP, the IRP Implementation Plan, and the IRP<br />
recommendations.<br />
Briefing packages were prepared for each of the technical conferences and made<br />
available to stakeholders. The packages contained necessary information on the<br />
particular technical conference including maps, graphs, tables, and resource plans.<br />
During the technical conferences the IRP team presented the information noted in Table<br />
2.2 and documented the discussion from the stakeholders. Documentation included<br />
questions and comments given by stakeholders and <strong>Halifax</strong> Water. Meeting summaries<br />
of the technical conferences, presentation materials, and conference agendas were<br />
posted on the <strong>Halifax</strong> Water IRP website, available publically at:<br />
http://www.halifax.ca/hrwc/IntegratedResourcePlan.html.<br />
Other specific stakeholder consultations included:<br />
• Access to the IRP study SharePoint site for viewing IRP related documents.<br />
• Replies to questions issued by stakeholders throughout the process.<br />
• Stakeholder’s input on the IRP’s Recommended IRP.<br />
• Direct engagement by stakeholders with NSUARB’s representatives (Tellus).<br />
Written submissions received from stakeholders also form part of the consultation<br />
record and were considered in the IRP.<br />
Revision: 2012-10-29 Integrated Resource Plan 7<br />