05.01.2014 Views

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Halifax</strong> Water Integrated Resource Plan<br />

Integrated Resource Planning<br />

• Section 7 – Recommended IRP Implementation Plan presenting the schedule and<br />

details of plan implementation<br />

• Section 8 – Recommended IRP compliance with the NSUARB order<br />

• Volume 1 Appendices including:<br />

- Appendix A – IRP Terms of Reference<br />

- Appendix B – <strong>Halifax</strong> Water Five-Year Business Plan<br />

- Appendix C – <strong>Halifax</strong> Water Corporate Balanced Scorecard<br />

- Appendix D – Maps<br />

- Appendix E – <strong>Regional</strong> Wastewater Functional Plan – Cost Tables<br />

- Appendix F – Current and New Programs<br />

- Appendix G – NSUARB Terms of Reference Compliance Tables<br />

- Appendix H – Recommended IRP Financial Model<br />

- Appendix I - Tellus Statement<br />

Volume 2 provides the IRP consultation record including key issues identified through<br />

the one-on-one interactions and Technical Conference resource materials and<br />

commentary.<br />

Volume 3 presents a series of Technical Appendices providing details of the water and<br />

wastewater systems, presenting details of the cost estimation procedures, a review of<br />

available data and the details of the asset renewal methodology.<br />

Revision: 2012-10-29 Integrated Resource Plan 4<br />

October 31 2012 Page 37 of 272

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!