Financial Model 40-4<br />

Driver:<br />

Growth \<br />

Objective: 13<br />

Provide regional water, wastewater, and stormwater infrastructure needed to support planned growth<br />

Capital Expenditure profile in $k<br />

Year Zero<br />

Type of<br />

Objective<br />

Allocation<br />

Project Name / Description Asset Group Opex Group<br />

(2012/2013) 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-38 2038-39 2039-40 2040-41 2041-42 2042-43 Program/Project<br />

Objectives<br />

2.043 Overflow Monitoring Program Wastewater - Collection Combined Wastewater Collection $60 $75 $75 $75 HW Capital Budget 50-20-30 3-6-13<br />

4.009 Integrated Resource Plan (split Wastewater - Collection Combined Wastewater Collection $23 $23 HW Capital Budget 40-20-25-15 1-3-8-13<br />

W-WW-SW) $15 $23 $23 $23 $23 $23 $23 $23 $23 $23 $23<br />

2.040 Beechville, Lakeside, Timberlea WWTF Upgrade Wastewater - Treatment Facilities Wastewater Treatment $1,500 $5,250 $3,750 HW Capital Budget 60-10-30 1-12-13<br />

2.097 Eastern Passage WWTF Design Build Upgrade Wastewater - Treatment Facilities Wastewater Treatment $4,000 $6,460 HW Capital Budget 60-10-10-20 1-9-12-13<br />

2.016 Aerotech WWTF Upgrade - Design/Construction Wastewater - Airport Aerotech System Wastewater Treatment $75 $2,925 $3,000 HW Capital Budget 50-20-30 1-8-13<br />

2.016 (O&M) New O&M costs associated with additional treatment at<br />

Aerotech WWTF - energy for aeration, chemical costs for TP<br />

removal, Increase in labour, allowance for sludge handling<br />

(energy), energy and labour costs associated with additonal<br />

EQ <strong>volume</strong>, and filtration costs (energy, media replacement,<br />

chemical costs, replacement parts allowance and addtional<br />

labour)<br />

Wastewater - Airport Aerotech System (O&M) Wastewater Treatment $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 $371 O&M (yearly costs) 25-75 1-13<br />

2.853 Bio-Solids Processing Facility Expansion Wastewater - Airport Aerotech System Wastewater Treatment $1,200 XCG Project 100 13<br />

2.853 (O&M) New Incremental O&M costs associated with Bio-solids<br />

Processing\ Facility Upgrade<br />

Wastewater - Airport Aerotech System (O&M) Wastewater Treatment $0 $63 $127 $190 $253 $317 $380 $443 $507 $570 $633 $697 $760 $823 $887 $950 $1,013 $1,077 $1,140 $1,203 $1,267 $1,330 $1,393 $1,457 $1,520 $1,583 $1,647 $1,710 $1,773 $1,837 $1,900 O&M (yearly costs) 100 13<br />

2.236 Aerotech WW Servicing Options Assessment Wastewater - Airport Aerotech System Wastewater Treatment $75 HW Capital Budget 40-30-30 1-4-13<br />

2.801 Upgrade Aerotech Drive Pumping station to 145 L/s, from 15<br />

L/s (130 L/s upgrade) (AT1)<br />

2.801 (O&M) New O&M costs associated with additional wastewater<br />

pumping at Aerotech<br />

Wastewater - Structures Wastewater Collection $1,248 RWWFP Project 100 13<br />

Wastewater - Airport Aerotech System (O&M) Wastewater Treatment $9 $9 $9 $9 $9 $9 $9 $9 $9 $9 $9 O&M (yearly costs) 100 13<br />

2.802 Upgrade Aerotech WWTF to service employment growth flows Wastewater - Treatment Facilities Wastewater Treatment $21,760 RWWFP Project 100 13<br />

(AT2)<br />

Upgrade 2.803 sewer conveyance to WWTF, from Aerotech Drive PS Wastewater - Collection Sanitary Wastewater Collection $2,363 RWWFP Project 100 13<br />

to WWTF (AT3)<br />

2.804 Re-locate treated effluent discharge location to Soldiers Lake<br />

(AT4)<br />

Wastewater - Collection Sanitary Wastewater Collection $17,264 RWWFP Project 100 13<br />

2.805 Upgrade Aerotech Drive PS forcemain to 145 L/s, from 15 L/s<br />

(130 L/s upgrade) (AT5)<br />

Wastewater - Structures Wastewater Collection $512 RWWFP Project 100 13<br />

2.806 450 mm WWFM from BLT PS to 125 m south of Governors<br />

Lake Dr (BL1)<br />

2.807 New BLT PS WWPS at Timberlea Village Pky (Site to be<br />

confirmed) WWPS (BL2)<br />

2.807 (O&M) New O&M costs associated with additional wastewater<br />

pumping at BLT PS Village Parkway<br />

Wastewater - Forcemains Wastewater Collection $7,968 RWWFP Project 100 13<br />

Wastewater - Structures Wastewater Collection $2,112 RWWFP Project 100 13<br />

Wastewater - Pumping (O&M) Wastewater Treatment $33 $33 $33 $33 $33 $33 $33 $33 $33 $33 $33 $33 $33 $33 $33 $33 $33 $33 O&M (yearly costs) 100 13<br />

2.808 New wastewater pumping station at Church St WWPS (Exact<br />

site to be determined) (BL3)<br />

Wastewater - Structures Wastewater Collection $2,112 RWWFP Project 100 13<br />

2.808 (O&M) New O&M costs associated with additional wastewater<br />

pumping at Church St PS<br />

2.809 600 mm WWM from Governor Lake Drive to Church St PS<br />

(BL4)<br />

2.810 450 mm WWFM from Church St PS to upstream of Bayers<br />

Lake PS (BL5)<br />

Wastewater - Pumping (O&M) Wastewater Treatment $37 $37 $37 $37 $37 $37 $37 $37 $37 $37 $37 $37 $37 $37 $37 $37 $37 $37 O&M (yearly costs) 100 13<br />

Wastewater - Trunk Sewers Wastewater Collection $1,906 RWWFP Project 100 13<br />

Wastewater - Forcemains Wastewater Collection $8,200 RWWFP Project 100 13<br />

2.811 600 mm Hwy 3 WWM from RAMP SSH-4 to Bicentennial Hwy Wastewater - Trunk Sewers Wastewater Collection $1,327 RWWFP Project 100 13<br />

and North West Arm Dr (BL6)<br />

2.812 Upgrade Bayers lake PS (BL7) Wastewater - Structures Wastewater Collection $2,112 RWWFP Project 100 13<br />

2.812 (O&M) New O&M costs associated with additional wastewater<br />

pumping at Bayers Lake PS<br />

Wastewater - Pumping (O&M) Wastewater Treatment $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 O&M (yearly costs) 100 13<br />

2.813 450mm WWFM from Bayers Lake PS (BL8) Wastewater - Forcemains Wastewater Collection $2,110 RWWFP Project 100 13<br />

2.814 600mm WWM to Bayers lake PS (BL9) Wastewater - Trunk Sewers Wastewater Collection $870 RWWFP Project 100 13<br />

2.817 Sewer twinning along existing roads - Albro Lake/Slayter St to Wastewater - Collection Combined Wastewater Collection RWWFP Project 100 13<br />

$9,481<br />

Ferry St PS (DA3)<br />

2.818 Storage at Shannon Park vicinity (DA4) Wastewater - Structures Wastewater Collection $23,040 RWWFP Project 100 13<br />

2.819 Storage at Anderson Lake vicinity (DA5) Wastewater - Structures Wastewater Collection $18,880 RWWFP Project 100 13<br />

2.820 Upgrade of Ferry Rd PS by 807 L/s to provide total capacity of Wastewater - Structures Wastewater Collection RWWFP Project 100 13<br />

$9,684<br />

900 L/s (existing PS has 93 L/s) (DA6)<br />

2.820 (O&M) New O&M costs associated with additional wastewater<br />

pumping at Ferry Road<br />

Wastewater - Pumping (O&M) Wastewater Treatment $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 $59 O&M (yearly costs) 100 13<br />

2.821 825mm Ø Ferry Rd forcemain for 900l/s (DA7) Wastewater - Forcemains Wastewater Collection $2,835 RWWFP Project 100 13<br />

2.822 Upgrade of Dartmouth WWTF (DA8) Wastewater - Treatment Facilities Wastewater Treatment $39,200 RWWFP Project 100 13<br />

2.822 (O&M) Dartmouth WWTF - Construct a secondary treatment system - Wastewater - Treatment Facilities (O&M) Wastewater Treatment $263 $263 $263 $263 $263 $263 $263 $263 $263 $263 O&M (yearly costs) 100 13<br />

CCME component: to produce a secondary effluent that meets<br />

CCME requirements - Increased O&M cost for energy,<br />

chemicals, labour and equipment<br />

2.825 Upgrade of Eastern Passage WWTF - NOT REQUIRED (EP2) Wastewater - Treatment Facilities Wastewater Treatment RWWFP Project 100 13<br />

2.826 Storage Tank at Bissett Lake-Attwood PS (EP3) Wastewater - Structures Wastewater Collection $3,680 RWWFP Project 100 13<br />

2.827 Upgrade Quigley's Corner Pumping Station (EP4) Wastewater - Structures Wastewater Collection $96 RWWFP Project 100 13<br />

2.827 (O&M) New O&M costs associated with additional wastewater<br />

pumping at Quigley's Corner<br />

Wastewater - Pumping (O&M) Wastewater Collection $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 O&M (yearly costs) 100 13<br />

2.828 Twinning of existing Pressure Sewer from Caldwell to terminus Wastewater - Forcemains Wastewater Collection $16,979 RWWFP Project 100 13<br />

(EP5)<br />

2.829 Local pipe upgrades throughout system - 300mm (EP6) Wastewater - Collection Sanitary Wastewater Collection $1,946 RWWFP Project 100 13<br />

2.830 Local pipe upgrades throughout system - 450mm (EP7) Wastewater - Collection Sanitary Wastewater Collection $7,844 RWWFP Project 100 13<br />

2.831 Local pipe upgrades throughout system - 600mm (EP8) Wastewater - Collection Sanitary Wastewater Collection $1,519 RWWFP Project 100 13<br />

2.832 Upgrade of Kearney Rd PS (HA1) Wastewater - Structures Wastewater Collection $11,040 RWWFP Project 100 13<br />

2.833 900 mm WWFM from Kearney Rd PS to Bicentennial Hwy (Hill Wastewater - Forcemains Wastewater Collection $19,634 RWWFP Project 100 13<br />

top) (HA2)<br />

2.834 900 mm WWM from Bicentennial Hwy (Hill top) to St<br />

Margarets Bay Rd (HA3)<br />

2.835 Gravity sewer from St Margarets Bay Rd to Armdale Rd PS<br />

(HA4)<br />

Wastewater - Trunk Sewers Wastewater Collection $15,811 RWWFP Project 100 13<br />

Wastewater - Collection Sanitary Wastewater Collection $6,108 RWWFP Project 100 13<br />

2.836 Upgrade of Armdale (Rotary) Rd PS (HA5) Wastewater - Structures Wastewater Collection $20,448 RWWFP Project 100 13<br />

2.836 (O&M) New O&M costs associated with additional wastewater<br />

pumping at Armdale PS<br />

Wastewater - Pumping (O&M) Wastewater Treatment $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 $394 O&M (yearly costs) 100 13<br />

2.837 Forcemain from Armdale PS to Punch Bowl Dr (Hill Top) (HA6) Wastewater - Forcemains Wastewater Collection $23,023 RWWFP Project 100 13<br />

2.837 (O&M) New O&M costs associated with additional wastewater<br />

pumping at Punch Bowl PS<br />

Wastewater - Pumping (O&M) Wastewater Treatment $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 $242 O&M (yearly costs) 100 13<br />

2.838 Gravity sewer from hill top to Herring Cove diversion (HA7) Wastewater - Collection Sanitary Wastewater Collection $9,375 RWWFP Project 100 13<br />

2.840 Gravity sewer from Herring Cove diversion (top end) to<br />

Roaches Pond PS (HC1)<br />

Wastewater - Collection Sanitary Wastewater Collection $23,464 RWWFP Project 100 13<br />

2.841 Gravity sewer from Princeton Rd (70m north of Roaches Pond Wastewater - Collection Sanitary Wastewater Collection $30,706 RWWFP Project 100 13<br />

PS) to Herring Cove PS (HC2)<br />

2.842 Upgrade of Herring Cove SPS (HC3) Wastewater - Structures Wastewater Collection $25,920 RWWFP Project 100 13<br />

2.842 (O&M) New O&M costs associated with additional wastewater<br />

pumping at Village Road<br />

Wastewater - Pumping (O&M) Wastewater Treatment $237 $237 $237 $237 $237 $237 $237 $237 $237 $237 $237 $237 $237 $237 $237 $237 O&M (yearly costs) 100 13<br />

2.843 Forcemain from Herring Cove PS (Village Road PS) to Herring Wastewater - Forcemains Wastewater Collection $4,086 RWWFP Project 100 13<br />

Cove WWTF (HC4)<br />

2.844 Upgrade of Herring Cove WWTF (HC5) Wastewater - Treatment Facilities Wastewater Treatment $135,840 RWWFP Project 100 13<br />

2.844 (O&M) Herring Cove WWTF - Construct a secondary treatment<br />

system -CCME component: to produce a secondary effluent<br />

that meets CCME requirements - Increased O&M cost for<br />

energy, chemicals, labour and equipment<br />

2.847 Storage Facility #1 at Glendale/Old Beaver Bank Road<br />

(upstream of Bedford Sackville Trunk Sewer) (MC2)<br />

Wastewater - Treatment Facilities (O&M) Wastewater Treatment $899 $899 $899 $899 $899 $899 $899 $899 $899 $899 O&M (yearly costs) 100 13<br />

Wastewater - Structures Wastewater Collection $19,200 RWWFP Project 100 13<br />

October 31 2012 Page 250 of Page 272 10 of 11