05.01.2014 Views

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Halifax</strong> Water Integrated Resource Plan<br />

Executive Summary<br />

Table ES-8<br />

Recommended LOS Updates or Additions<br />

Driver Objective Proposed LOS Update or Addition<br />

Asset<br />

Renewal<br />

Growth<br />

7. Meet Future Stormwater Quality<br />

Compliance<br />

8. Implement Optimal Level of Asset<br />

Renewal<br />

9. Enhance the Reliability of Critical Water<br />

and Wastewater Assets<br />

10. Ensure Existing Stormwater System<br />

Adequately Sized for Minor Storm<br />

Conveyance<br />

11. Adapt to Future Climate Change<br />

12. Reduce Energy Consumption, Operating<br />

Costs and Greenhouse Gas Contributions<br />

13. Provide <strong>Regional</strong> Water, Wastewater and<br />

Stormwater Infrastructure Needed to<br />

Support Planned Growth<br />

14. Manage Flow Capacity Allocations<br />

• Consider preliminary stormwater quality<br />

monitoring LOS, e.g. number samples/sites.<br />

• Develop specific asset renewal targets and LOS.<br />

This will require a new monitoring system to<br />

provide reporting on progress.<br />

• No changes suggested.<br />

• Develop specific pipe and culvert capacity LOS.<br />

• At a minimum apply customer satisfaction LOS.<br />

• Incorporate future climate change impacts into<br />

existing LOS where appropriate.<br />

• Consider specific energy reduction targets and<br />

incorporate into more detailed LOS.<br />

• No changes suggested.<br />

• Develop specific targets for I/I reduction at<br />

WWTFs and in major pumping stations and other<br />

locations, e.g. overflows.<br />

• Consider water demand targets.<br />

The updated/expanded LOS once developed will require support for LOS monitoring,<br />

data analysis and reporting. <strong>Halifax</strong> Water will need to consider the impact on staff for<br />

this additional data collection, analysis, and reporting.<br />

In a number of cases, no change or addition to the LOS have been recommended.<br />

ES 9.<br />

IRP RECOMMENDATIONS<br />

Based on the analysis carried out through the course of the IRP preparation the<br />

following 17 recommendations are presented:<br />

IRP Next Steps<br />

1. Implement the IRP as per Table ES-4 components and timing.<br />

2. Finalize the overall integrated planning approach and future schedule (i.e. HRM<br />

<strong>Regional</strong> Plan updates, master plans and Asset Management Assessment, and<br />

financial planning) within the IRP framework.<br />

3. Evaluate the adequacy of <strong>Halifax</strong> Water's existing institutional capacity and staffing<br />

to implement the programs and projects identified in the IRP.<br />

4. Continue public outreach with stakeholders and the public at large for<br />

incorporation into the next IRP review.<br />

5. Update the IRP periodically, as needed.<br />

Revision: 2012-10-29 Integrated Resource Plan – Executive Summary ES-23<br />

October 31 2012 Page 25 of 272

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!