<strong>Halifax</strong> Water Integrated Resource Plan<br />
Executive Summary<br />
Table ES-8<br />
Recommended LOS Updates or Additions<br />
Driver Objective Proposed LOS Update or Addition<br />
Asset<br />
Renewal<br />
Growth<br />
7. Meet Future Stormwater Quality<br />
Compliance<br />
8. Implement Optimal Level of Asset<br />
Renewal<br />
9. Enhance the Reliability of Critical Water<br />
and Wastewater Assets<br />
10. Ensure Existing Stormwater System<br />
Adequately Sized for Minor Storm<br />
Conveyance<br />
11. Adapt to Future Climate Change<br />
12. Reduce Energy Consumption, Operating<br />
Costs and Greenhouse Gas Contributions<br />
13. Provide <strong>Regional</strong> Water, Wastewater and<br />
Stormwater Infrastructure Needed to<br />
Support Planned Growth<br />
14. Manage Flow Capacity Allocations<br />
• Consider preliminary stormwater quality<br />
monitoring LOS, e.g. number samples/sites.<br />
• Develop specific asset renewal targets and LOS.<br />
This will require a new monitoring system to<br />
provide reporting on progress.<br />
• No changes suggested.<br />
• Develop specific pipe and culvert capacity LOS.<br />
• At a minimum apply customer satisfaction LOS.<br />
• Incorporate future climate change impacts into<br />
existing LOS where appropriate.<br />
• Consider specific energy reduction targets and<br />
incorporate into more detailed LOS.<br />
• No changes suggested.<br />
• Develop specific targets for I/I reduction at<br />
WWTFs and in major pumping stations and other<br />
locations, e.g. overflows.<br />
• Consider water demand targets.<br />
The updated/expanded LOS once developed will require support for LOS monitoring,<br />
data analysis and reporting. <strong>Halifax</strong> Water will need to consider the impact on staff for<br />
this additional data collection, analysis, and reporting.<br />
In a number of cases, no change or addition to the LOS have been recommended.<br />
ES 9.<br />
IRP RECOMMENDATIONS<br />
Based on the analysis carried out through the course of the IRP preparation the<br />
following 17 recommendations are presented:<br />
IRP Next Steps<br />
1. Implement the IRP as per Table ES-4 components and timing.<br />
2. Finalize the overall integrated planning approach and future schedule (i.e. HRM<br />
<strong>Regional</strong> Plan updates, master plans and Asset Management Assessment, and<br />
financial planning) within the IRP framework.<br />
3. Evaluate the adequacy of <strong>Halifax</strong> Water's existing institutional capacity and staffing<br />
to implement the programs and projects identified in the IRP.<br />
4. Continue public outreach with stakeholders and the public at large for<br />
incorporation into the next IRP review.<br />
5. Update the IRP periodically, as needed.<br />
Revision: 2012-10-29 Integrated Resource Plan – Executive Summary ES-23<br />