Financial Model 40-4<br />
<strong>Halifax</strong> Water Integrated Resource Plan - Short List Plan 40-4<br />
LEGEND<br />
Driver:<br />
Regulatory Compliance<br />
HRWC Capital Budget - Water Projects RWWFP Projects HRWC Capital Budget - Airport/Aerotech Projects<br />
HRWC Capital Budget - Wastewater Projects XCG WWTF Projects XCG WWTF - Airport/Aerotech Projects<br />
HRWC Capital Budget - Stormwater Projects GENIVAR - Water Projects RWWFP Projects - Airport/Aerotech<br />
HRWC Programs Halcrow Asset Renewal O&M Yearly Costs<br />
Objective:1<br />
Meet current Nova Scotia Environment (NSE) WWTF permit to operate requirements<br />
Capital Expenditure profile in $k<br />
Year Zero<br />
Type of<br />
Objective<br />
Allocation (%)<br />
Project Name / Description Asset Group Opex Group<br />
(2012/2013) 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-38 2038-39 2039-40 2040-41 2041-42 2042-43 Program/Project<br />
Objectives<br />
2.066 Grit Management Facility Wastewater - Collection Combined Wastewater Collection $12 HW Capital Budget 20-20-60 1-7-8<br />
4.009 Integrated Resource Plan (split W-WW-SW) Wastewater - Collection Combined Wastewater Collection $40 $60 $60 $60 $60 $60 $60 $60 $60 $60 $60 $60 $60 HW Capital Budget 40-20-25-15 1-3-8-13<br />
2.209 Dartmouth WWTF - UV Disinfection System Upgrades Wastewater - Energy Wastewater Treatment $15 HW Capital Budget 20-80 1-12<br />
2.215 <strong>Halifax</strong> WWTF - UV Disinfection System Upgrades Wastewater - Energy Wastewater Treatment $15 HW Capital Budget 20-80 1-12<br />
2.219 Herring Cove WWTF - UV Disinfection System Upgrades Wastewater - Energy Wastewater Treatment $20 HW Capital Budget 20-80 1-12<br />
2.020 Lockview-MacPherson WWTF - Tertiary Upgrade Wastewater - Treatment Facilities Wastewater Treatment $150 $650 HW Capital Budget 100 1<br />
2.020 (O&M) Lockview-MacPherson WWTF Tertiary Upgrade - New O&M Wastewater - Treatment Facilities (O&M) Wastewater Treatment $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 O&M (yearly costs)<br />
costs associated with energy costs, media replacement,<br />
from XCG<br />
chemical costs, replacement parts allowance, additional labour<br />
100 1<br />
2.039 Belmont WWTF Decommissioning Wastewater - Treatment Facilities Wastewater Treatment $240 $900 $600 HW Capital Budget 60-30-10 1-12-14<br />
2.040 Beechville, Lakeside, Timberlea WWTF Upgrade Wastewater - Treatment Facilities Wastewater Treatment $3,000 $10,500 $7,500 HW Capital Budget 60-10-30 1-12-13<br />
2.040 (O&M) Beechville, Lakeside, Timberlea WWTF Upgrade - New O&M Wastewater - Treatment Facilities (O&M) Wastewater Treatment $358 $358 $358 $358 $358 $358 $358 $358 $358 O&M (yearly costs)<br />
costs associated with upgrade to secondary treatment - energy<br />
from XCG<br />
for aeration, chemical costs for TP removal, Increase in labour,<br />
UV upgrade costs (energy, bulb replacement, cleaning<br />
chemicals), and filtration costs (energy, media replacement,<br />
chemical costs, replacement parts allowance and addtional<br />
labour)<br />
2.044 (O&M) Backup Power Program: Increase in labour and inspections at Wastewater - Treatment Facilities (O&M) Wastewater Treatment $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 O&M (yearly costs)<br />
all facilities<br />
from XCG<br />
100 1<br />
100 1<br />
2.095 (O&M) Wellington WWTF - New O&M costs associated with new<br />
mechanical treatment facility - energy for aeration, chemical<br />
costs for TP removal, Increase in labour, and UV upgrade<br />
costs (energy, bulb replacement, cleaning chemicals)<br />
Wastewater - Treatment Facilities (O&M) Wastewater Treatment $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 O&M (yearly costs)<br />
from XCG<br />
100 1<br />
2.097 Eastern Passage WWTF Design Build Upgrade Wastewater - Treatment Facilities Wastewater Treatment $12,000 $19,380 HW Capital Budget 60-10-10-20 1-9-12-13<br />
2.097 (O&M) Eastern Passage WWTF Design Build Upgrade - New O&M Wastewater - Treatment Facilities (O&M) Wastewater Treatment $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 O&M (yearly costs)<br />
costs associated with upgrade to secondary treatment - energy<br />
from XCG<br />
for aeration, chemical costs for TP removal, Increase in labour,<br />
and UV upgrade costs (energy, bulb replacement, cleaning<br />
chemicals)<br />
100 1<br />
2.124 Mill Cove WWTF UV Upgrade Wastewater - Treatment Facilities Wastewater Treatment $968 HW Capital Budget 90-10 1-12<br />
2.126 Bio-Solids Facility - Upgrade Program Wastewater - Treatment Facilities Wastewater Treatment $359 $63 $77 $29 HW Capital Budget 100 1<br />
2.222 HHSP Deficiency Management Wastewater - Treatment Facilities Wastewater Treatment $250 HW Capital Budget 50-25-25 1-9-12<br />
2.500 <strong>Halifax</strong> WWTF - Conduct treatability study, optimize coagulant Wastewater - Treatment Facilities Wastewater Treatment XCG WWTF Project 100 1<br />
$98<br />
dosages, polymer dosages, and sludge pumping to improve<br />
performance of DensaDeg during high flows.<br />
2.503 Dartmouth WWTF - Conduct treatability study, optimize Wastewater - Treatment Facilities Wastewater Treatment $98 XCG WWTF Project 100 1<br />
coagulant dosages, polymer dosages, and sludge pumping to<br />
improve performance of DensaDeg during high flows.<br />
2.504 Dartmouth WWTF - Characterize effluent UVT and assess<br />
capacity of the existing disinfection system. Upgrade UV<br />
disinfection system.<br />
Wastewater - Treatment Facilities Wastewater Treatment $4,480 XCG WWTF Project 100 1<br />
2.504 (O&M) Dartmouth WWTF - New O&M costs due to bulb replacement, Wastewater - Treatment Facilities (O&M) Wastewater Treatment $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 O&M (yearly costs)<br />
cleaning chemicals, annual electricity costs increase<br />
from XCG<br />
100 1<br />
2.507 Herring Cove WWTF - Optimize coagulant dosages, polymer<br />
dosages, and sludge pumping to improve performance of<br />
DensaDeg process during high flows.<br />
2.509 Lockview-MacPherson WWTF - Modifications to equalization<br />
tank pumping and/or increase equalization tank <strong>volume</strong> to<br />
reduce magnitude of peak flows to downstream treatment<br />
processes.<br />
2.510 Lockview-MacPherson WWTF - Modifications to secondary<br />
clarifiers, such as installing baffles and replacing the sludge /<br />
scum collection equipment, to improve performance.<br />
Wastewater - Treatment Facilities Wastewater Treatment $46 XCG WWTF Project 100 1<br />
Wastewater - Treatment Facilities Wastewater Treatment $102 XCG WWTF Project 100 1<br />
Wastewater - Treatment Facilities Wastewater Treatment $240 XCG WWTF Project 100 1<br />
2.511 Lockview-MacPherson WWTF - UV system upgrade. Wastewater - Treatment Facilities Wastewater Treatment $112 XCG WWTF Project 100 1<br />
2.511 (O&M) Lockview-MacPherson WWTF - New O&M costs for bulb<br />
replacement, cleaning chemicals, and annual electricity costs<br />
for additional UV capacity<br />
Wastewater - Treatment Facilities (O&M) Wastewater Treatment $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M (yearly costs)<br />
from XCG<br />
100 1<br />
2.513 Middle Musquodoboit WWTF - Provide additional equalization Wastewater - Treatment Facilities Wastewater Treatment $120 XCG WWTF Project 100 1<br />
storage <strong>volume</strong> to attenuate peak flows to the downstream<br />
treatment process and/or provide a bypass line around the<br />
mechanical plant discharging to the polishing pond to protect<br />
the treatment process and ensure continued compliance with<br />
treatment requirements.<br />
North Preston WWTF - Provide additional alkalinity addition to<br />
2.515 Wastewater - Treatment Facilities Wastewater Treatment $29 XCG WWTF Project 100 1<br />
supplement the existing caustic soda addition system and/or<br />
utilize a different chemical for alkalinity addition (Project<br />
underway).<br />
North Preston WWTF - Conduct a detailed biological treatment<br />
2.516 Wastewater - Treatment Facilities Wastewater Treatment $33 XCG WWTF Project 100 1<br />
capacity assessment to evaluate the ability of the current<br />
process to provide consistent nitrification (to be completed after<br />
upgrades to the alkalinity addition system).<br />
2.517 North Preston WWTF - Install an autosampler to collect<br />
samples of engineered wetland effluent to determine actual<br />
effluent loadings applied to the receiver, Whynder Lake.<br />
Wastewater - Treatment Facilities Wastewater Treatment $37 XCG WWTF Project 100 1<br />
2.519 Uplands Park WWTF - To ensure continued compliance with<br />
treatment requirements:<br />
- Construct flow splitter boxes and reconfigure trickling filter<br />
and clarifier influent piping to improve flow splits; and<br />
- Replace mechanical equipment associated with the existing<br />
trickling filters (distribution arms, effluent collection system).<br />
Wastewater - Treatment Facilities Wastewater Treatment $293 XCG WWTF Project 100 1<br />
2.016 Aerotech WWTF Upgrade - Design/Construction Wastewater - Airport Aerotech System Wastewater Treatment $125 $4,875 $5,000 HW Capital Budget 50-20-30 1-8-13<br />
2.016 (O&M) New O&M costs associated with additional treatment at<br />
Aerotech WWTF - energy for aeration, chemical costs for TP<br />
removal, Increase in labour, allowance for sludge handling<br />
(energy), energy and labour costs associated with additonal<br />
EQ <strong>volume</strong>, and filtration costs (energy, media replacement,<br />
chemical costs, replacement parts allowance and addtional<br />
labour)<br />
Wastewater - Airport Aerotech System (O&M) Wastewater Treatment $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 O&M (yearly costs)<br />
from XCG<br />
25-75 1-13<br />
2.236 Aerotech WW Servicing Options Assessment Wastewater - Airport Aerotech System Wastewater Treatment $100 HW Capital Budget 40-30-30 1-4-13<br />
2.528 Implement an operational control strategy to slowly add the<br />
Aerotech lagoon effluent to the mechanical treatment plant to<br />
avoid slug loads of high TKN/TAN influent during wet weather<br />
events.<br />
Wastewater - Airport Aerotech System Wastewater Treatment $152 XCG WWTF Project 100 1<br />
2.538 Aerotech WWTF Upgrade Program Wastewater - Airport Aerotech System Wastewater Treatment $12 $245 $7 $13 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 HW Capital Budget 35-35-30 1-4-8<br />
Sub-Total Objective 1 (Capital Projects and Programs) $15,948 $35,833 $12,584 $342 $2,173 $6,713 $0 $245 $60 $305 $0 $245 $0 $305 $60 $245 $0 $245 $60 $305 $0 $245 $0 $305 $60 $245 $0 $245 $60 $305 $0<br />
Sub-Total Objective 1 (O&M) $4 $4 $802 $1,323 $1,323 $1,323 $1,389 $1,389 $1,438 $1,438 $1,438 $1,438 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081<br />
October 31 2012 Page 241 of Page 272 1 of 11