Financial Model 40-4<br />

<strong>Halifax</strong> Water Integrated Resource Plan - Short List Plan 40-4<br />

LEGEND<br />

Driver:<br />

Regulatory Compliance<br />

HRWC Capital Budget - Water Projects RWWFP Projects HRWC Capital Budget - Airport/Aerotech Projects<br />

HRWC Capital Budget - Wastewater Projects XCG WWTF Projects XCG WWTF - Airport/Aerotech Projects<br />

HRWC Capital Budget - Stormwater Projects GENIVAR - Water Projects RWWFP Projects - Airport/Aerotech<br />

HRWC Programs Halcrow Asset Renewal O&M Yearly Costs<br />

Objective:1<br />

Meet current Nova Scotia Environment (NSE) WWTF permit to operate requirements<br />

Capital Expenditure profile in $k<br />

Year Zero<br />

Type of<br />

Objective<br />

Allocation (%)<br />

Project Name / Description Asset Group Opex Group<br />

(2012/2013) 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-38 2038-39 2039-40 2040-41 2041-42 2042-43 Program/Project<br />

Objectives<br />

2.066 Grit Management Facility Wastewater - Collection Combined Wastewater Collection $12 HW Capital Budget 20-20-60 1-7-8<br />

4.009 Integrated Resource Plan (split W-WW-SW) Wastewater - Collection Combined Wastewater Collection $40 $60 $60 $60 $60 $60 $60 $60 $60 $60 $60 $60 $60 HW Capital Budget 40-20-25-15 1-3-8-13<br />

2.209 Dartmouth WWTF - UV Disinfection System Upgrades Wastewater - Energy Wastewater Treatment $15 HW Capital Budget 20-80 1-12<br />

2.215 <strong>Halifax</strong> WWTF - UV Disinfection System Upgrades Wastewater - Energy Wastewater Treatment $15 HW Capital Budget 20-80 1-12<br />

2.219 Herring Cove WWTF - UV Disinfection System Upgrades Wastewater - Energy Wastewater Treatment $20 HW Capital Budget 20-80 1-12<br />

2.020 Lockview-MacPherson WWTF - Tertiary Upgrade Wastewater - Treatment Facilities Wastewater Treatment $150 $650 HW Capital Budget 100 1<br />

2.020 (O&M) Lockview-MacPherson WWTF Tertiary Upgrade - New O&M Wastewater - Treatment Facilities (O&M) Wastewater Treatment $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 O&M (yearly costs)<br />

costs associated with energy costs, media replacement,<br />

from XCG<br />

chemical costs, replacement parts allowance, additional labour<br />

100 1<br />

2.039 Belmont WWTF Decommissioning Wastewater - Treatment Facilities Wastewater Treatment $240 $900 $600 HW Capital Budget 60-30-10 1-12-14<br />

2.040 Beechville, Lakeside, Timberlea WWTF Upgrade Wastewater - Treatment Facilities Wastewater Treatment $3,000 $10,500 $7,500 HW Capital Budget 60-10-30 1-12-13<br />

2.040 (O&M) Beechville, Lakeside, Timberlea WWTF Upgrade - New O&M Wastewater - Treatment Facilities (O&M) Wastewater Treatment $358 $358 $358 $358 $358 $358 $358 $358 $358 O&M (yearly costs)<br />

costs associated with upgrade to secondary treatment - energy<br />

from XCG<br />

for aeration, chemical costs for TP removal, Increase in labour,<br />

UV upgrade costs (energy, bulb replacement, cleaning<br />

chemicals), and filtration costs (energy, media replacement,<br />

chemical costs, replacement parts allowance and addtional<br />

labour)<br />

2.044 (O&M) Backup Power Program: Increase in labour and inspections at Wastewater - Treatment Facilities (O&M) Wastewater Treatment $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 $50 O&M (yearly costs)<br />

all facilities<br />

from XCG<br />

100 1<br />

100 1<br />

2.095 (O&M) Wellington WWTF - New O&M costs associated with new<br />

mechanical treatment facility - energy for aeration, chemical<br />

costs for TP removal, Increase in labour, and UV upgrade<br />

costs (energy, bulb replacement, cleaning chemicals)<br />

Wastewater - Treatment Facilities (O&M) Wastewater Treatment $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 $4 O&M (yearly costs)<br />

from XCG<br />

100 1<br />

2.097 Eastern Passage WWTF Design Build Upgrade Wastewater - Treatment Facilities Wastewater Treatment $12,000 $19,380 HW Capital Budget 60-10-10-20 1-9-12-13<br />

2.097 (O&M) Eastern Passage WWTF Design Build Upgrade - New O&M Wastewater - Treatment Facilities (O&M) Wastewater Treatment $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 $788 O&M (yearly costs)<br />

costs associated with upgrade to secondary treatment - energy<br />

from XCG<br />

for aeration, chemical costs for TP removal, Increase in labour,<br />

and UV upgrade costs (energy, bulb replacement, cleaning<br />

chemicals)<br />

100 1<br />

2.124 Mill Cove WWTF UV Upgrade Wastewater - Treatment Facilities Wastewater Treatment $968 HW Capital Budget 90-10 1-12<br />

2.126 Bio-Solids Facility - Upgrade Program Wastewater - Treatment Facilities Wastewater Treatment $359 $63 $77 $29 HW Capital Budget 100 1<br />

2.222 HHSP Deficiency Management Wastewater - Treatment Facilities Wastewater Treatment $250 HW Capital Budget 50-25-25 1-9-12<br />

2.500 <strong>Halifax</strong> WWTF - Conduct treatability study, optimize coagulant Wastewater - Treatment Facilities Wastewater Treatment XCG WWTF Project 100 1<br />

$98<br />

dosages, polymer dosages, and sludge pumping to improve<br />

performance of DensaDeg during high flows.<br />

2.503 Dartmouth WWTF - Conduct treatability study, optimize Wastewater - Treatment Facilities Wastewater Treatment $98 XCG WWTF Project 100 1<br />

coagulant dosages, polymer dosages, and sludge pumping to<br />

improve performance of DensaDeg during high flows.<br />

2.504 Dartmouth WWTF - Characterize effluent UVT and assess<br />

capacity of the existing disinfection system. Upgrade UV<br />

disinfection system.<br />

Wastewater - Treatment Facilities Wastewater Treatment $4,480 XCG WWTF Project 100 1<br />

2.504 (O&M) Dartmouth WWTF - New O&M costs due to bulb replacement, Wastewater - Treatment Facilities (O&M) Wastewater Treatment $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 $66 O&M (yearly costs)<br />

cleaning chemicals, annual electricity costs increase<br />

from XCG<br />

100 1<br />

2.507 Herring Cove WWTF - Optimize coagulant dosages, polymer<br />

dosages, and sludge pumping to improve performance of<br />

DensaDeg process during high flows.<br />

2.509 Lockview-MacPherson WWTF - Modifications to equalization<br />

tank pumping and/or increase equalization tank <strong>volume</strong> to<br />

reduce magnitude of peak flows to downstream treatment<br />

processes.<br />

2.510 Lockview-MacPherson WWTF - Modifications to secondary<br />

clarifiers, such as installing baffles and replacing the sludge /<br />

scum collection equipment, to improve performance.<br />

Wastewater - Treatment Facilities Wastewater Treatment $46 XCG WWTF Project 100 1<br />

Wastewater - Treatment Facilities Wastewater Treatment $102 XCG WWTF Project 100 1<br />

Wastewater - Treatment Facilities Wastewater Treatment $240 XCG WWTF Project 100 1<br />

2.511 Lockview-MacPherson WWTF - UV system upgrade. Wastewater - Treatment Facilities Wastewater Treatment $112 XCG WWTF Project 100 1<br />

2.511 (O&M) Lockview-MacPherson WWTF - New O&M costs for bulb<br />

replacement, cleaning chemicals, and annual electricity costs<br />

for additional UV capacity<br />

Wastewater - Treatment Facilities (O&M) Wastewater Treatment $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M (yearly costs)<br />

from XCG<br />

100 1<br />

2.513 Middle Musquodoboit WWTF - Provide additional equalization Wastewater - Treatment Facilities Wastewater Treatment $120 XCG WWTF Project 100 1<br />

storage <strong>volume</strong> to attenuate peak flows to the downstream<br />

treatment process and/or provide a bypass line around the<br />

mechanical plant discharging to the polishing pond to protect<br />

the treatment process and ensure continued compliance with<br />

treatment requirements.<br />

North Preston WWTF - Provide additional alkalinity addition to<br />

2.515 Wastewater - Treatment Facilities Wastewater Treatment $29 XCG WWTF Project 100 1<br />

supplement the existing caustic soda addition system and/or<br />

utilize a different chemical for alkalinity addition (Project<br />

underway).<br />

North Preston WWTF - Conduct a detailed biological treatment<br />

2.516 Wastewater - Treatment Facilities Wastewater Treatment $33 XCG WWTF Project 100 1<br />

capacity assessment to evaluate the ability of the current<br />

process to provide consistent nitrification (to be completed after<br />

upgrades to the alkalinity addition system).<br />

2.517 North Preston WWTF - Install an autosampler to collect<br />

samples of engineered wetland effluent to determine actual<br />

effluent loadings applied to the receiver, Whynder Lake.<br />

Wastewater - Treatment Facilities Wastewater Treatment $37 XCG WWTF Project 100 1<br />

2.519 Uplands Park WWTF - To ensure continued compliance with<br />

treatment requirements:<br />

- Construct flow splitter boxes and reconfigure trickling filter<br />

and clarifier influent piping to improve flow splits; and<br />

- Replace mechanical equipment associated with the existing<br />

trickling filters (distribution arms, effluent collection system).<br />

Wastewater - Treatment Facilities Wastewater Treatment $293 XCG WWTF Project 100 1<br />

2.016 Aerotech WWTF Upgrade - Design/Construction Wastewater - Airport Aerotech System Wastewater Treatment $125 $4,875 $5,000 HW Capital Budget 50-20-30 1-8-13<br />

2.016 (O&M) New O&M costs associated with additional treatment at<br />

Aerotech WWTF - energy for aeration, chemical costs for TP<br />

removal, Increase in labour, allowance for sludge handling<br />

(energy), energy and labour costs associated with additonal<br />

EQ <strong>volume</strong>, and filtration costs (energy, media replacement,<br />

chemical costs, replacement parts allowance and addtional<br />

labour)<br />

Wastewater - Airport Aerotech System (O&M) Wastewater Treatment $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 $162 O&M (yearly costs)<br />

from XCG<br />

25-75 1-13<br />

2.236 Aerotech WW Servicing Options Assessment Wastewater - Airport Aerotech System Wastewater Treatment $100 HW Capital Budget 40-30-30 1-4-13<br />

2.528 Implement an operational control strategy to slowly add the<br />

Aerotech lagoon effluent to the mechanical treatment plant to<br />

avoid slug loads of high TKN/TAN influent during wet weather<br />

events.<br />

Wastewater - Airport Aerotech System Wastewater Treatment $152 XCG WWTF Project 100 1<br />

2.538 Aerotech WWTF Upgrade Program Wastewater - Airport Aerotech System Wastewater Treatment $12 $245 $7 $13 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 $245 HW Capital Budget 35-35-30 1-4-8<br />

Sub-Total Objective 1 (Capital Projects and Programs) $15,948 $35,833 $12,584 $342 $2,173 $6,713 $0 $245 $60 $305 $0 $245 $0 $305 $60 $245 $0 $245 $60 $305 $0 $245 $0 $305 $60 $245 $0 $245 $60 $305 $0<br />

Sub-Total Objective 1 (O&M) $4 $4 $802 $1,323 $1,323 $1,323 $1,389 $1,389 $1,438 $1,438 $1,438 $1,438 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081 $1,081<br />

October 31 2012 Page 241 of Page 272 1 of 11