<strong>Halifax</strong> Water Integrated Resource Plan<br />
Appendices<br />
4.1.9 Final Integrated Resource Plan Report<br />
TOR Requirement<br />
1. IRP final report will include background information<br />
and an overview of the IRP process.<br />
IRP Reference<br />
Sections<br />
1, 2, and 3<br />
Volume 1 Appendix<br />
D<br />
Volume 3<br />
Appendices A and B<br />
RWWFP<br />
Figure 1.1 presents an overview of the IRP development process linked to the contents of the<br />
Section 2 presents an overview of the stakeholder consultation during development of the IRP.<br />
Section 3 presents the IRP Planning Context, including an overview of all three infrastructure<br />
systems, existing projects and programs.<br />
Volume 1 Appendix D provides maps for the study area.<br />
Volume 3 Appendices A and B provide details of the water system and WWTFs respectively.<br />
The RWWFP provides details of the wastewater collection systems.<br />
2. IRP final report will include forecast summaries. Volume 3<br />
Appendices A and B<br />
RWWFP<br />
Volume 3 Appendices A and B provide details of growth impacts upon the water system and<br />
WWTFs respectively.<br />
The RWWFP provides details of growth impacts upon the collection system.<br />
3. IRP final report will include a description of the<br />
supply-side and demand side options evaluated in<br />
the IRP.<br />
4. IRP final report will include a description of the<br />
screening analysis employed to determine which<br />
options would precede to more detailed analysis.<br />
5. IRP final report will include identification of the plan<br />
assumptions.<br />
6. IRP final report will include a description of the<br />
resource plans and the associated components.<br />
Section 5.0<br />
Volume 1<br />
Appendices B, E and<br />
F<br />
Sections<br />
5.7 to 5.10<br />
Detailed throughout<br />
Volumes 1 and 3 of<br />
the IRP report<br />
Sections<br />
5 and 6<br />
Section 5 presents an overview of the components of each of the alternative resource plans.<br />
Volume Appendices B, E and F provides of the Five-Year Capital Plan, RWWFP and the existing<br />
and new programs/projects.<br />
This section presents a summary of the IRP Plan development including Initial Plan Analysis and<br />
development of the Intermediate Plans, Refined Plans, and Short List Plans.<br />
Assumptions are detailed throughout the IRP report including those for asset service life<br />
estimates which were based on best industry practice, enhanced overflow control, demand<br />
reduction, end-of-period analysis, and financial modelling.<br />
Asset life data and fractional values are contained in the costing procedures technical<br />
memorandum, which is presented in Volume 3 Appendix C.<br />
Figure 5.1 presents an overview of the IRP alternative resource plan development and evaluation<br />
process. A flow chart is provided as Figure 5.6 illustrating the initial, intermediate, refined, and<br />
short-list alternative resource plans selection process. Through the synthesis of key inputs,<br />
twenty-eight initial resource plans were developed. These were evolved through into 18<br />
intermediate plans and then 10 refined plans. A short list of four plans was selected from the 10<br />
refined plans. The final recommended plan was selected from the short list, which is presented in<br />
Section 6, Recommended Resource Plan.<br />
Revision: 2012-10-29 Integrated Resource Plan –Appendices G-22<br />
October 31 2012 Page 234 of 272