<strong>Halifax</strong> Water Integrated Resource Plan<br />

Executive Summary<br />

Figure ES-7<br />

<strong>Halifax</strong> Water IRP Integration<br />

The costs of the new planning related program activities in the Recommended IRP are<br />

presented in Table ES-7. The Recommended IRP includes other existing program costs<br />

that are associated with program implementation such as GIS upgrade and the lead<br />

services replacement program. These costs are not shown in the Table but are<br />

incorporated in the Recommended IRP.<br />

Table ES-7<br />

New Planning Program Expenditures<br />

Program<br />

2013-<br />

2015<br />

2016-<br />

2022<br />

2023-<br />

2032<br />

2033 -<br />

2043<br />

Program Details<br />

IRP Update $0.4 $1.2 $1.7 $1.7<br />

Wet Weather System<br />

Planning<br />

Wastewater System<br />

Master Plan<br />

Stormwater Quality<br />

Assessment<br />

$0.8 $3.5 $5.0 $5.0<br />

- $0.8 $1.5 $1.5<br />

$0.2 $0.1 - (1) -<br />

• Periodic IRP updates assuming initial IRP<br />

update at 3 years and every 5 years<br />

thereafter<br />

• On-going wet weather system planning<br />

including monitoring and model<br />

updates/refinements<br />

• Wastewater Master Plan update every 5<br />

years<br />

• Project to define likely stormwater<br />

quality requirements (additional<br />

expenditures may result from the<br />

assessment outcomes)<br />

Revision: 2012-10-29 Integrated Resource Plan – Executive Summary ES-21<br />

October 31 2012 Page 23 of 272