05.01.2014 Views

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Halifax</strong> Water Integrated Resource Plan<br />

Appendices<br />

Figure 2.2<br />

Cumulative Capital Cost for 10 Overflows per Average Year<br />

For purpose of the IRP, the B plus C level projects were used for the Enhanced Overflow<br />

Control Program.<br />

Figure 2.3 shows the further reduction of total overflow <strong>volume</strong> (growth plus nongrowth)<br />

to 665,000 m 3 through the application of the Enhanced Program.<br />

Annual Overflow Volume (m 3 )<br />

18,000,000<br />

16,000,000<br />

14,000,000<br />

12,000,000<br />

10,000,000<br />

8,000,000<br />

6,000,000<br />

4,000,000<br />

2,000,000<br />

0<br />

Baseline<br />

Growth No<br />

Control<br />

RWWFP Baseline<br />

Enhanced<br />

Overflow Control<br />

+ RWWFP<br />

Figure 2.3<br />

Enhanced Overflow Control Program Annual Volume<br />

Revision: 2012-10-29 Integrated Resource Plan –Appendices F-26<br />

October 31 2012 Page 205 of 272

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!