<strong>Halifax</strong> Water Integrated Resource Plan<br />

Appendices<br />

end of the planning period compared to the age at the beginning of the planning period<br />

and the fraction of the assets at the end of the planning period above design life. These<br />

two metrics in conjunction with the failure impact was used to qualitatively rate failure<br />

severity. Table 2.5 presents the scoring methodology.<br />

Table 2.5<br />

Asset Component Failure Severity Score<br />

Failure Severity Score<br />

Colour Code<br />

0-150<br />

151-350<br />

351-600<br />

Table 2.6 presents the results of the asset risk analysis for the water assets.<br />

Table 2.6<br />

Water Asset Component Risk Analysis<br />

Asset<br />

Design<br />

Asset<br />

Life<br />

(Years)<br />

Failure<br />

Impact<br />

Failure<br />

Severity<br />

Index<br />

Under<br />

Current<br />

Conditions<br />

Failure<br />

Severity<br />

Under A<br />

Level<br />

Renewal<br />

Conditions<br />

Failure<br />

Severity<br />

Under B<br />

Level<br />

Renewal<br />

Conditions<br />

Failure<br />

Severity<br />

Under C<br />

Level<br />

Renewal<br />

Conditions<br />

Preferred<br />

Asset<br />

Renewal<br />

Level<br />

Distribution<br />

Mains<br />

75 low 150 100 125 150 C<br />

Transmission<br />

Mains<br />

75 high 350 250 300 350 A<br />

Meters 20 low 50 50 60 75 C<br />

PRVs<br />

Civil - 50<br />

M&E - 20<br />

low 50 50 60 75 C<br />

Valves 75 low 50 50 60 75 C<br />

Revision: 2012-10-29 Integrated Resource Plan –Appendices F-18<br />

October 31 2012 Page 197 of 272