Halifax Water Integrated Resource Plan Appendices • The current annual expenditure as a percentage of the asset value was based on the asset renewal expenditures provided in the Five-Year Capital for 2012 to 2017. It was assumed that the budgeted amounts are indicative of current asset renewal expenditures. • Some special assets with significant site-specific conditions affecting renewal costs such as reservoirs or dams were not modelled but rather subjected to individual analysis to estimate required renewal over the 30-year period. These were high-level estimates. Specific detailed evaluations should be made for each of these structures to establish current condition and replacement requirements. Based on the below, Table 2.1 shows the following: • The range of total water asset renewal 30-year NPV costs is from approximately $581 million for A level water system renewal to $312 million for C level renewal. This corresponds to near doubling (1.9 x) of costs in moving from C level to A level • Approximately 25% -30% of costs are associated with WSP renewal activity depending on the level of renewal. • Approximately 42% -53 % of costs are associated with linear assets (i.e. distribution and transmission mains) depending on level of renewal. • The modelled renewal rates significantly exceed the current renewal rates shown in the Five-Year Capital Plan for complex facilities such as WSPs, pumping stations, valves and pressure reducing valves (PRVs). • Current renewal rates for distribution mains are less than C level while current rates for transmission mains fall between B level and A level. • Current renewal for metering significantly exceeds modelled rates at all levels. As noted below, the asset renewal modeling used some simple rules based on asset age. For purposes of evaluating asset renewal effectiveness, two metrics were employed – average asset life at the end-of-period and the fraction of assets above design life. Revision: 2012-10-29 Integrated Resource Plan –Appendices F-9 October 31 2012 Page 188 of 272
Halifax Water Integrated Resource Plan Appendices Table 2.1 Water System Asset Renewal Analysis Asset Group Water Design Asset Life (Years) Current Annual Expenditure as % of Total Replacement Value 75 0.23% 75 0.50% 20 3.98% Civil - 50 M&E - 20 0.26% 75 0.07% Civil - 50 M&E - 20 ICA - 10 0.54% Variation Annual Asset Renewal Rate % of Replacement Value Asset Renewal Model 30 year NPV (Discount Rate 3%) ($m) A 0.82% $250.9 B 0.62% $188.2 C 0.35% $108.0 A 0.56% $58.8 B 0.44% $43.0 C 0.22% $21.5 A 0.40% $19.2 B 0.30% $14.8 C 0.19% $8.9 A 6.07% $30.3 B 5.10% $24.6 C 3.73% $18.3 A 0.16% $2.3 B 0.11% $1.5 C 0.07% $1.0 A 7.33% $44.0 B 6.19% $36.0 C 6.30% $34.0 varies 0.18% Reservoirs were assessed on a project-by-project basis $17.0 20 Reservoirs were assessed on a project-by-project basis $7.1 20 0.00% Dams were assessed on a projectby-project basis $6.3 Civil - 50 M&E - 30 ICA - 10 Civil - 50 M&E - 30 ICA - 10 0.63% Water System Totals A 3.91% $139.3 B 2.63% $98.6 C 2.57% $87.0 A 3.98% $6.0 B 3.95% $5.3 C 2.12% $3.0 A $580.7 B $442.2 C $312.0 Revision: 2012-10-29 Integrated Resource Plan –Appendices F-10 October 31 2012 Page 189 of 272
- Page 137 and 138: Halifax Water Integrated Resource P
- Page 139 and 140: Halifax Water - Integrated Resource
- Page 141 and 142: Halifax Water - Integrated Resource
- Page 143 and 144: Halifax Water - Integrated Resource
- Page 145 and 146: Halifax Water - Integrated Resource
- Page 147 and 148: Halifax Water Integrated Resource P
- Page 149 and 150: Capital Expenditure Program All $ i
- Page 151 and 152: Page 1 of 3 Stormwater Projects Pro
- Page 153 and 154: Page 3 of 3 Stormwater Projects Pro
- Page 155 and 156: Page 1 of 7 Wastewater Projects Pro
- Page 157 and 158: Page 3 of 7 Wastewater Projects Pro
- Page 159 and 160: Page 5 of 7 Wastewater Projects Pro
- Page 161 and 162: Page 7 of 7 Wastewater Projects Pro
- Page 163 and 164: Water Projects Page 1 of 4 Project
- Page 165 and 166: Water Projects Page 3 of 4 Project
- Page 167 and 168: Halifax Water Integrated Resource P
- Page 169 and 170: Halifax Water Integrated Resource P
- Page 171 and 172: October 31 2012 Page 171 of 272
- Page 173 and 174: October 31 2012 Page 173 of 272
- Page 175 and 176: Halifax Water Integrated Resource P
- Page 177 and 178: FINAL 1 2 3 4 5 6 7 10 13 16 17 18
- Page 179 and 180: Halifax Water Integrated Resource P
- Page 181 and 182: Halifax Water Integrated Resource P
- Page 183 and 184: Halifax Water Integrated Resource P
- Page 185 and 186: Halifax Water Integrated Resource P
- Page 187: Halifax Water Integrated Resource P
- Page 191 and 192: Halifax Water Integrated Resource P
- Page 193 and 194: Halifax Water Integrated Resource P
- Page 195 and 196: Halifax Water Integrated Resource P
- Page 197 and 198: Halifax Water Integrated Resource P
- Page 199 and 200: Halifax Water Integrated Resource P
- Page 201 and 202: Halifax Water Integrated Resource P
- Page 203 and 204: Halifax Water Integrated Resource P
- Page 205 and 206: Halifax Water Integrated Resource P
- Page 207 and 208: Halifax Water Integrated Resource P
- Page 209 and 210: Halifax Water Integrated Resource P
- Page 211 and 212: Halifax Water Integrated Resource P
- Page 213 and 214: Halifax Water Integrated Resource P
- Page 215 and 216: Halifax Water Integrated Resource P
- Page 217 and 218: Halifax Water Integrated Resource P
- Page 219 and 220: Halifax Water Integrated Resource P
- Page 221 and 222: Halifax Water Integrated Resource P
- Page 223 and 224: Halifax Water Integrated Resource P
- Page 225 and 226: Halifax Water Integrated Resource P
- Page 227 and 228: Halifax Water Integrated Resource P
- Page 229 and 230: Halifax Water Integrated Resource P
- Page 231 and 232: Halifax Water Integrated Resource P
- Page 233 and 234: Halifax Water Integrated Resource P
- Page 235 and 236: Halifax Water Integrated Resource P
- Page 237 and 238: Halifax Water Integrated Resource P
<strong>Halifax</strong> Water Integrated Resource Plan<br />
Appendices<br />
• The current annual expenditure as a percentage of the asset value was based on the<br />
asset renewal expenditures provided in the Five-Year Capital for 2012 to 2017. It was<br />
assumed that the budgeted amounts are indicative of current asset renewal<br />
expenditures.<br />
• Some special assets with significant site-specific conditions affecting renewal costs<br />
such as reservoirs or dams were not modelled but rather subjected to individual<br />
analysis to estimate required renewal over the 30-year period. These were high-level<br />
estimates. Specific detailed evaluations should be made for each of these structures<br />
to establish current condition and replacement requirements.<br />
Based on the below, Table 2.1 shows the following:<br />
• The range of total water asset renewal 30-year NPV costs is from approximately<br />
$581 million for A level water system renewal to $312 million for C level renewal.<br />
This corresponds to near doubling (1.9 x) of costs in moving from C level to A level<br />
• Approximately 25% -30% of costs are associated with WSP renewal activity<br />
depending on the level of renewal.<br />
• Approximately 42% -53 % of costs are associated with linear assets (i.e. distribution<br />
and transmission mains) depending on level of renewal.<br />
• The modelled renewal rates significantly exceed the current renewal rates shown in<br />
the Five-Year Capital Plan for complex facilities such as WSPs, pumping stations,<br />
valves and pressure reducing valves (PRVs).<br />
• Current renewal rates for distribution mains are less than C level while current rates<br />
for transmission mains fall between B level and A level.<br />
• Current renewal for metering significantly exceeds modelled rates at all levels.<br />
As noted below, the asset renewal modeling used some simple rules based on asset age.<br />
For purposes of evaluating asset renewal effectiveness, two metrics were employed –<br />
average asset life at the end-of-period and the fraction of assets above design life.<br />
Revision: 2012-10-29 Integrated Resource Plan –Appendices F-9<br />
October 31 2012 Page 188 of 272