<strong>Halifax</strong> Water Integrated Resource Plan<br />

Executive Summary<br />

ES 8.3<br />

ES 8.3.1<br />

Recommended IRP Expenditures<br />

30-Year Expenditures<br />

The total 30-year NPV for the recommended plan inclusive of capital and O&M costs is<br />

$2,579 million.<br />

The timing of expenditures (in $2012) is shown in Figure ES-3, which indicates significant<br />

expenditures around years 10, 20 and 30. This corresponds to the following projects:<br />

• Year 10 – WWTF Nutrient Upgrades<br />

• Year 20 – WSER HHSP WWTF Upgrades<br />

• Year 30 – Enhanced Overflow Control Program<br />

Figure ES-3<br />

Recommended IRP Expenditures by Year<br />

Over the 30-year period the average expenditure under the Recommended IRP is $131<br />

million/yr. This can be compared to the Five-Year Capital Plan with an annual average of<br />

$53 million/yr.<br />

The expenditures by driver are shown in Figure ES-4. Approximately 54% of the<br />

expenditures are associated with asset renewal and the remainder split between growth<br />

(23%) and compliance (23%).<br />

Revision: 2012-10-29 Integrated Resource Plan – Executive Summary ES-16<br />

October 31 2012 Page 18 of 272