1 2 3 4 5 6 7 10 13 16 17 18 21 22 23 24<br />

Wastewater Capital Program - Preferred <strong>Regional</strong> Servicing Strategy<br />

Region<br />

Capital Plan<br />

Project No.<br />

Area Project<br />

ID<br />

Combined<br />

Project<br />

Delivery<br />

Implementation<br />

Order<br />

Project Description<br />

System<br />

HW<br />

Project<br />

Type<br />

Project<br />

Type<br />

Diameter<br />

(mm)<br />

Length (m), Flow<br />

(L/s), Volume<br />

(m 3 )<br />

Unit Rate<br />

$/m, $/Lps, $/m 3<br />

Base Cost<br />

$M (2012)<br />

Other Costs<br />

(Crossings<br />

etc.)<br />

$M (2012)<br />

Total Cost<br />

$M (2012)<br />

Year<br />

Req'd<br />

Period Req'd<br />

Growth Areas<br />

Serviced<br />

Comment<br />

West 32 HC1 2 Gravity sewer from Herring Cove diversion (top end) to Roaches Pond PS Herring Cove WW - TS WWM 1050 mm 3,531 $2,941 $10.38 $4.28 $23.46 2021 2021-2026<br />

West 33 HC2 3<br />

Gravity sewer from Princeton Rd (70m north of Roaches Pond PS) to Herring Cove<br />

PS<br />

Herring Cove WW - TS WWM 1050 mm 5,686 $2,941 $16.72 $2.47 $30.71 2026 2026-2031<br />

West 34 HC3 HC4 4 Upgrade of Herring Cove SPS Herring Cove WW - Str WWPS-U N/A 1,800 $9,000 $16.20 $0.00 $25.92 2026 2026-2031<br />

West 35 HC4 HC3 5 Forcemain from Herring Cove PS to Herring Cove WWTF Herring Cove WW - FM WWFM 1050 mm 632 $3,379 $2.13 $0.42 $4.09 2026 2026-2031<br />

West 36 HC5 6 Upgrade of Herring Cove WWTF Herring Cove WW - TF WWTF-U N/A 53.55 MLD N/A $84.90 $0.00 $135.84 2031 2031-2036<br />

23, 24, 25, 27, 28, 29, 30, 31,<br />

32, 34, 37, 46, 51, 52<br />

23, 24, 25, 27, 28, 29, 30, 31,<br />

32, 34, 37, 46, 51, 52<br />

23, 24, 25, 27, 28, 29, 30, 31,<br />

32, 34, 37, 46, 51, 52<br />

23, 24, 25, 27, 28, 29, 30, 31,<br />

32, 34, 37, 46, 51, 52<br />

23, 24, 25, 27, 28, 29, 30, 31,<br />

32, 34, 37, 46, 51, 52<br />

4 minor creek crossings, 1 road crossing (TBC)<br />

3 minor creek crossings, 2 road crossings (opencut TBC)<br />

Lump sum cost estimate - to be verified<br />

1 minor creek crossing<br />

West 37 HC6 1 I/I Reduction Program Herring Cove I/I $2.00 $0.00 $3.20 2013 2012-2016 allowance for study and implementation of recommendations<br />

Central 11 MC1 1 I/I Reduction Program - manhole sealing Mill Cove MH N/A N/A N/A $0.03 $0.00 $0.05 2015 2012-2016 N/A<br />

Based on the Sackville Area 5 I/I Study (CBCL, 2006) that<br />

indicates that sealing of manholes could remove approx. 232 L/s,<br />

which could result in a 61% reduction of the peak I/I component<br />

Central 12 MC2 2<br />

Storage Facility #1 at Glendale/Old Beaver Bank Road (upstream of Bedford<br />

Sackville Trunk Sewer)<br />

Mill Cove WW - Str SF-N N/A 6,000 $2,000 $12.00 $0.00 $19.20 2013 2012-2016 40, 42, 43, 44<br />

Required to alleviate conveyance capacity in the upper 2/3 of the<br />

Bedford Sackville trunk sewer<br />

Central 13 MC3 8<br />

Storage Facility #2 at Bedford Range Park (downstream of Bedford Sackville Trunk<br />

Sewer)<br />

Mill Cove WW - Str SF-N N/A 7,000 $2,000 $14.00 $0.00 $22.40 2021 2021-2026 39, 38<br />

Required to reduce frequency of overflows at Fish Hatchery PS<br />

and alleviate conveyance capacity in the lower Bedford Sackville<br />

trunk sewer; limiting the pass forward flow to 900 L/s<br />

Central 14 MC4 5<br />

Localized improvments to Bedford Sackville Trunk Sewer sections - diameters range<br />

between 525 mm and 1200 mm over 4.44 km.<br />

Mill Cove WW - TS WWM Ranges 4,436 $2,428 $10.77 $0.00 $17.23 2019 2016-2021<br />

Central 15 MC5 MC6 6 New wastewater pumping station at Mill Cove WWTF for diversion to <strong>Halifax</strong> Mill Cove WW - Str WWPS-N N/A 330 $6,000 $1.98 $0.00 $3.17 2019 2016-2021<br />

Central 16 MC6 MC5 7 500mm Wastewater forcemain from Mill Cove WWTF to Mill Cove Diversion Sewer Mill Cove WW - FM WWFM 500 mm 1,139 $1,857 $2.11 $0.00 $3.38 2019 2016-2021<br />

Central 17 MC7 4<br />

Diversion Sewer from Mill Cove WWTF to <strong>Halifax</strong>, along Bedford waterfront to<br />

Bedford Hwy tunnel<br />

Mill Cove WW - CS WWM 600 mm 3,147 $1,060 $3.34 $0.45 $6.05 2016 2016-2021<br />

Central 18 MC8 3 General I/I reduction program allowance Mill Cove I/I $1.00 $0.00 $1.60 2016 2016-2021<br />

42, 40, 43, 44, 39, 38, 41 Assume twinning of existing trunk sewer to address existing<br />

conveyance capacity limitations<br />

42, 38, 39, 40, 41, 43, 44, 35 Sized to convey 330 L/s from existing service area from<br />

Springfield, existing "peel off" area from Mill Cove, and future flows<br />

from said growth areas<br />

42, 38, 39, 40, 41, 43, 44, 35,<br />

36, 37<br />

42, 38, 39, 40, 41, 43, 44, 35,<br />

36, 37<br />

42, 38, 39, 40, 41, 43, 44, 35,<br />

36, 37<br />

Sized to convey 330 L/s from existing service area from<br />

Springfield, existing "peel off" area from Mill Cove, and future flows<br />

from said growth areas<br />

Monitoring should be implemented now with prgrame for works<br />

scheduled in 2016-2021 5yr period<br />

Central 6 SP1 SP2 4 Springfield Lake forcemain pumping south Springfield WW - FM WWFM 200 mm 1,941 $788 $1.53 $0.00 $2.45 2026 2026-2031 42<br />

Central 7 SP2 SP1 3<br />

New wastewater pumping station at Springfield Lake WWTF to pump flows back to<br />

Sackville Dr for diversion to Bedford Sackville Trunk Sewer<br />

Springfield WW - Str WWPS-N N/A 53 $6,000 $0.32 $0.00 $0.51 2026 2026-2031 42<br />

Central 8 SP3 2 Diversion Sewer from Springfield to Bedford Sackville Trunk Sewer Springfield WW - CS WWM 300 mm 896 $783 $0.70 $0.00 $1.12 2016 2016-2021 42<br />

Central 9 SP4 5 Decommission Springfield WWTF Springfield WWTF-D N/A N/A N/A $2.00 $0.00 $3.20 2031 2026-2031 N/A Lump sum cost estimate - to be verified<br />

Central 10 SP5 1<br />

Separation/resewerage - New storm sewers for Springfield Lake Stormwater<br />

Collection System<br />

Springfield SW - Pipe SWM Ranges 6,714 $1,000 $6.71 $0.00 $10.74 2016 2012-2016 42 Revised unit cost of $1M / km provided by HW<br />

GRAND TOTAL $365.92 $37.37 $645.26<br />

*Sizing and capacities based on 2011 calibrated hydraulic model. More accurate flow monitoring and observed data required for detailed design purposes may produce differing sizing and capacity needs.<br />

October 31 2012 Page 177 of 272<br />

2012-09-25-RWWFP Preliminary Capital Program - FINALv3.xlsxCapital Program