Water Projects<br />
Page 3 of 4<br />
Project<br />
ID<br />
Project Name<br />
Driver<br />
All $ in 000's<br />
Y1 Y2 Y3 Y4 Y5 Y6-10 Y11 - 15 Y16 - 20 Y21 - 25 Y26 - 30<br />
AR G C 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017<br />
Sub Total<br />
Y1 to Y5<br />
2017-18 to<br />
2021-22<br />
2022-23 to<br />
2026-27<br />
2027-28 to<br />
2031-32<br />
2032-33 to<br />
2036-37<br />
2037-38 to<br />
2041-42<br />
Sub Total Y6<br />
to Y30<br />
Total<br />
Y1 to Y30<br />
Comments<br />
Projects >=$1.5M Estimate prepared or<br />
Budget Cost (Estimate not yet prepared)<br />
Water - Treatment Facilities<br />
3.30 JD Kline WSP Upgrade Program $0 $0 $0<br />
3.31 Lake Major WSP Upgrade program $0 $0 $0<br />
3.32 Non-Urban Core WSP Upgrade program $0 $0 $0<br />
Miller Lake Small System - Extension of Well Supply<br />
Line<br />
J D Kline - Chemical Feed Pump Replacement<br />
Program<br />
$250 $250 $0 $250<br />
$120 $120 $120 $120 $120 $600 $0 $600<br />
J D Kline - Chlorination System Replacement Design $100 $100 $0 $100<br />
J D Kline - Chlorination System Replacement $2,400 $2,400 $0 $2,400 Internal Staff Estimate prepared *<br />
Lake Major WSP - Control Room Renovations $14 $14 $0 $14<br />
Lake Major WSP - Lime System Upgrade $38 $38 $0 $38<br />
Lake Major WSP - Ventilation in Motor Control Room $20 $20 $0 $20<br />
J D Kline - Replacement program for Filter Valve<br />
Actuators<br />
J D Kline - Replace Valve Actuators at the Pumping<br />
Station<br />
$45 $45 $45 $45 $180 $0 $180<br />
$95 $95 $0 $95<br />
J D Kline - Entrance Road Paving Renewal $85 $85 $0 $85<br />
J D Kline - Mechanical Mixers in the Mixing Tanks $1,550 $1,000 $2,550 $0 $2,550 Internal Staff Estimate prepared *<br />
J D Kline - Parking Lot Resurfacing $120 $120 $0 $120<br />
J D Kline - Removal of Aluminium in the process<br />
wastewater<br />
$2,700 $2,700 $1,150 $1,150 $3,850 Internal Staff Estimate prepared *<br />
J D Kline - Lobby Upgrades $0 $180 $180 $180<br />
J D Kline - Replace Pump Motors #1 and #3 $0 $280 $280 $280<br />
J D Kline - Flow Splitting Improvements in the Pre-Mix $1,300 $1,300 $1,300<br />
Lake Major WSP - New Diesel Generator $225 $225 $225<br />
Bennery Lake WSP - Future Process Improvements<br />
(from 2008 Aerotech Servicing Study)<br />
Bennery Lake WSP - Raw Water Supply from Grand<br />
Lake<br />
$0 $1,850 $1,850 $1,850 Internal Staff Estimate prepared *<br />
$0 $3,800 $3,800 $3,800 Internal Staff Estimate prepared *<br />
Bennery WTP Upgrades $140 $140 $140 $140 $140 $700 $0 $700<br />
$0 $0 $0<br />
$0 $0 $0<br />
Water - Treatment Facilities -- T O T A L S $682 $305 $4,435 $4,125 $305 $9,852 $4,985 $3,800 $0 $0 $0 $8,785 $18,637<br />
Water - Energy<br />
Heat Recovery Study and Upgrade $300 $300 $600 $0 $600<br />
JD Kline - Industrial Process Pumps Upgrade $110 $110 $0 $110<br />
JD Kline - Raw Water Supply Pump Energy Study $50 $50 $0 $50<br />
Various - Chamber HVAC Retro-commissioning $150 $150 $150 $150 $600 $0 $600<br />
JD Kline - Wind Energy Development - 4.6 MW $0 $11,200 $11,200 $11,200 Estimate with Jeff Knapp<br />
Lake Major - Wind Energy Development - 11.5 MW $0 $26,200 $26,200 $26,200 Estimate with Jeff Knapp<br />
Long Lake - Wind Energy Development - 4.6 MW $0 $11,200 $11,200 $11,200 Estimate with Jeff Knapp<br />
PRV Energy Recovery Pilot Project - Orchard Central<br />
Chamber<br />
$100 $410 $510 $0 $510<br />
$0 $0 $0<br />
$0 $0 $0<br />
Water - Energy -- T O T A L S $450 $860 $260 $150 $150 $1,870 $48,600 $0 $0 $0 $0 $48,600 $50,470<br />
October 31 2012 Page 165 of 272<br />
M:\026 (Genivar)\026_42 (<strong>Halifax</strong> Water)\026_42_01 (IRP)\Resource Plan\R_3-0911816 Appendices\B\Copy of Appendix B - Capital Projects IRP Draft v3Water