05.01.2014 Views

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 6 of 7<br />

Wastewater Projects<br />

Project<br />

ID<br />

Project Name<br />

Driver<br />

All $ in 000's<br />

Y1 Y2 Y3 Y4 Y5 Y6-10 Y11 - 15 Y16 - 20 Y21 - 25 Y26 - 30<br />

AR G C 2012-2013 2013-2014 2014-2015 2015-2016 2016-17<br />

Sub Total<br />

Y1 to Y5<br />

2017-18 to<br />

2021-22<br />

2022-23 to<br />

2026-27<br />

2027-28 to<br />

2031-32<br />

2032-33 to<br />

2036-37<br />

2037-38 to<br />

2041-42<br />

Sub Total<br />

Y6 to Y30<br />

Total<br />

Y1 to Y30<br />

Comments<br />

Projects >=$1.5M Estimate prepared or<br />

Budget Cost (Estimate not yet prepared)<br />

Comment from<br />

Wastewater - Energy<br />

2.136 Roach's Pond PS HVAC Study/Upgrade $250 $250 $0 $250<br />

DWWTF Heat Recovery System Study $50 $50 $0 $50<br />

HCWWTF Heat Recovery System Study $50 $50 $0 $50<br />

Dartmouth WWTF - Ventilation Air Heat Recovery $750 $750 $0 $750<br />

<strong>Halifax</strong> WWTF - Waste Heat Recovery $750 $750 $0 $750<br />

Herring Cove WWTF - Ventilation Air Heat Recovery $600 $600 $0 $600<br />

Herring Cove WWTF - UV Disinfection System<br />

Upgrades<br />

$100 $100 $0 $100<br />

Mill Cove WWTF - Reactive Power Correction $50 $50 $0 $50<br />

Mill Cove WWTF - Lighting Upgrades $100 $100 $0 $100<br />

Mill Cove WWTF - Bio-Gas CHP - Study $100 $100 $0 $100<br />

Various PS - HVAC Retro-commissioning $0 $150 $150 $150 $150 $600 $850 $850 $1,450<br />

Various PS - Reactive Power Correction $0 $150 $150 $150 $150 $600 $450 $450 $1,050<br />

Dartmouth WWTF - Waste Heat Recovery $0 $750 $750 $750<br />

Dartmouth WWTF - UV Disinfection System Upgrades $0 $75 $75 $75<br />

<strong>Halifax</strong> WWTF - Ventilation Air Heat Recovery $0 $1,000 $1,000 $1,000<br />

<strong>Halifax</strong> WWTF - UV Disinfection System Upgrades $0 $75 $75 $75<br />

Herring Cove WWTF - Waste Heat Recovery $0 $500 $500 $500<br />

Mill Cove WWTF - Bio-Gas CHP - Installation $0 $650 $650 $650<br />

$0 $0 $0<br />

$0 $0 $0<br />

Wastewater - Energy -- T O T A L S $1,100 $400 $300 $1,050 $1,150 $4,000 $4,350 $0 $0 $0 $0 $4,350 $8,350<br />

Wastewater - Fleet<br />

2.98 Fleet Upgrade Program $1,000 $1,250 $1,000 $1,200 $1,100 $5,550 $0 $5,550<br />

$0 $0 $0<br />

$0 $0 $0<br />

Wastewater - Fleet -- T O T A L S $1,000 $1,250 $1,000 $1,200 $1,100 $5,550 $0 $0 $0 $0 $0 $0 $5,550<br />

October 31 2012 Page 160 of 272<br />

M:\026 (Genivar)\026_42 (<strong>Halifax</strong> Water)\026_42_01 (IRP)\Resource Plan\R_3-0911816 Appendices\B\Copy of Appendix B - Capital Projects IRP Draft v3Wastewater

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!