Wastewater Projects<br />
Project<br />
ID<br />
Project Name<br />
Driver<br />
All $ in 000's<br />
Y1 Y2 Y3 Y4 Y5 Y6-10 Y11 - 15 Y16 - 20 Y21 - 25 Y26 - 30<br />
AR G C 2012-2013 2013-2014 2014-2015 2015-2016 2016-17<br />
Sub Total<br />
Y1 to Y5<br />
2017-18 to<br />
2021-22<br />
2022-23 to<br />
2026-27<br />
2027-28 to<br />
2031-32<br />
2032-33 to<br />
2036-37<br />
2037-38 to<br />
2041-42<br />
Sub Total<br />
Y6 to Y30<br />
Total<br />
Y1 to Y30<br />
Comments<br />
Projects >=$1.5M Estimate prepared or<br />
Budget Cost (Estimate not yet prepared)<br />
Comment from<br />
Wastewater - Collection System<br />
2.52 Integrated Wastewater Projects - Program $1,250 $1,000 $1,050 $1,100 $1,500 $5,900 $0 $5,900<br />
This line item is for integrated projects with HRM streets<br />
projects<br />
2.130 Integrated Resource Plan split 50/50 WW/W $165 $200 $200 $565 $0 $565<br />
Springfield Lake Collection Upgrade $150 $250 $250 $650 $0 $650<br />
Outfall Elimination Program $100 $100 $100 $100 $100 $500 $0 $500<br />
Asset Management Implementation Program<br />
(W/WW/SW)<br />
$88 $300 $300 $300 $200 $1,188 $833 $1,000 $1,167 $1,333 $1,500 $5,833 $7,021<br />
Years 1 to 5 based on AMA report. Year 6+ placeholder<br />
costs<br />
VW<br />
2.66 Grit Management Facility $60 $60 $0 $60<br />
2.74 Bedford West Collection System (CCC) $15 $75 $140 $25 $255 $153 $153 $408<br />
2.73 Portland Hills Collection System (CCC) $0 $18 $70 $88 $0 $88<br />
2.43 Overflow Monitoring Program $200 $250 $250 $250 $950 $0 $950<br />
2.117<br />
Alder Crescent Collection System - reverse graded<br />
pipe, 300m plus watermain<br />
Deacon Street, Gateway Avenue, Green Street, Leeds<br />
Street and Pembrooke St- Sewer Lining<br />
$500 $500 $0 $500<br />
$750 $750 $0 $750<br />
2.13 Wanda Lane Sanitary Sewer Replacement $1,000 $1,200 $2,200 $0 $2,200 Cost from detailed design study IG<br />
2.72 Russell Lake West Collection System (CCC) $165 $165 $1,600 $1,600 $1,765 Costs from CBCL study KM<br />
2.76 Kempt Road Sewer Replacement $475 $475 $0 $475<br />
2.09<br />
North Preston Sewershed - Wastewater Collection<br />
System Replacement Program<br />
$0 $3,200 $3,200 $3,200 Cost from detailed design study IG<br />
2.86 Ellenvale Holding Tank Sewershed $0 $7,000 $7,000 $7,000<br />
2.11 Eastern Passage Sewage Collection System Upgrades $0 $54,500 $54,500 $54,500<br />
2.145 Dorothea Drive Sanitary Sewer Upgrade $0 $300 $300 $300<br />
Staff Budget Estimate - note cost for Holding Tank Only -<br />
not sewershed<br />
Estimate based on EP WW management plan report costs<br />
+ 10% $49.6M for coll. system improvements<br />
IG<br />
IG<br />
2.75 Beaver Crescent Collection System Replacement $0 $4,100 $4,100 $4,100 Cost from detailed design study IG<br />
Sewer Lining Program $0 $0 $0<br />
$0 $0 $0<br />
$0 $0 $0<br />
Wastewater - Collection System -- T O T A L S $1,828 $2,193 $3,770 $3,540 $2,915 $14,246 $71,686 $1,000 $1,167 $1,333 $1,500 $76,686 $90,932<br />
October 31 2012 Page 156 of 272<br />