<strong>Halifax</strong> Water Integrated Resource Plan<br />
IRP Implementation Plan<br />
The costs of the new planning related program activities in the IRP are presented in<br />
Table 7.6 The IRP includes other existing program costs that are associated with<br />
program implementation such as GIS upgrade and the lead services replacement<br />
program. These costs are not shown in the Table but are incorporated into the IRP<br />
through the Five-Year Capital Plan<br />
Table 7.6<br />
New Planning Program Expenditures<br />
Program<br />
2013-<br />
2015<br />
2016-<br />
2022<br />
2023-<br />
2032<br />
2033 -<br />
2043<br />
Program Details<br />
IRP Update $0.4 $1.2 $1.7 $1.7<br />
Wet Weather System<br />
Planning<br />
Wastewater System<br />
Master Plan<br />
Stormwater Quality<br />
Assessment<br />
Climate Change<br />
Impact Assessment<br />
Asset Management<br />
Program<br />
I/I Reduction Pilot<br />
Program<br />
$0.8 $3.5 $5.0 $5.0<br />
- $0.8 $1.5 $1.5<br />
$0.2 $0.1 - (1) -<br />
$0.7 - (1) - -<br />
$2.7 $3.6 $5.0 $5.0<br />
$1.2 $0.5 - (1) -<br />
• Periodic updates assuming initial IRP<br />
update at 3 years and every 5 years<br />
thereafter<br />
• On-going wet weather system planning<br />
including monitoring and model<br />
updates/refinements<br />
• Wastewater Master Plan update every 5<br />
years<br />
• Project to define likely stormwater<br />
quality requirements (additional<br />
expenditures may result from the<br />
assessment outcomes)<br />
• Project to define impacts of future<br />
climate change and resulting<br />
vulnerabilities on water, wastewater and<br />
stormwater systems (additional<br />
expenditures may result from the<br />
assessment outcomes)<br />
• Implementation of the asset<br />
management roadmap and on-going<br />
program updates and refinements<br />
• I/I pilot program aimed at developing I/I<br />
source contribution and remediation cost<br />
data specific to the <strong>Halifax</strong> area<br />
Water Master Plan - $0.8 $1.5 $1.5 • Water Master Plan update every 5 years<br />
Total $6.0 $10.5 $14.7 $14.7<br />
Notes:<br />
1. Expenditures are for program development only. Additional expenditures will be required for program<br />
implementation.<br />
7.7 LEVELS OF SERVICE<br />
One of the IRP outcomes was the presentation of the 14 IRP planning objectives. Some<br />
of these objectives are linked to current <strong>Halifax</strong> Water LOS. Table 7.7 presents a series<br />
of recommendations for updating/expanding the current LOS to allow a full evaluation<br />
of program implementation.<br />
Revision: 2012-10-29 Integrated Resource Plan 100<br />
October 31 2012 Page 133 of 272