IRP Implementation Plan<br />

The costs of the new planning related program activities in the IRP are presented in<br />

Table 7.6 The IRP includes other existing program costs that are associated with<br />

program implementation such as GIS upgrade and the lead services replacement<br />

program. These costs are not shown in the Table but are incorporated into the IRP<br />

through the Five-Year Capital Plan<br />

Table 7.6<br />

New Planning Program Expenditures<br />

Program<br />

2013-<br />

2015<br />

2016-<br />

2022<br />

2023-<br />

2032<br />

2033 -<br />

2043<br />

Program Details<br />

IRP Update $0.4 $1.2 $1.7 $1.7<br />

Wet Weather System<br />

Planning<br />

Wastewater System<br />

Master Plan<br />

Stormwater Quality<br />

Assessment<br />

Climate Change<br />

Impact Assessment<br />

Asset Management<br />

Program<br />

I/I Reduction Pilot<br />

Program<br />

$0.8 $3.5 $5.0 $5.0<br />

- $0.8 $1.5 $1.5<br />

$0.2 $0.1 - (1) -<br />

$0.7 - (1) - -<br />

$2.7 $3.6 $5.0 $5.0<br />

$1.2 $0.5 - (1) -<br />

• Periodic updates assuming initial IRP<br />

update at 3 years and every 5 years<br />

thereafter<br />

• On-going wet weather system planning<br />

including monitoring and model<br />

updates/refinements<br />

• Wastewater Master Plan update every 5<br />

years<br />

• Project to define likely stormwater<br />

quality requirements (additional<br />

expenditures may result from the<br />

assessment outcomes)<br />

• Project to define impacts of future<br />

climate change and resulting<br />

vulnerabilities on water, wastewater and<br />

stormwater systems (additional<br />

expenditures may result from the<br />

assessment outcomes)<br />

• Implementation of the asset<br />

management roadmap and on-going<br />

program updates and refinements<br />

• I/I pilot program aimed at developing I/I<br />

source contribution and remediation cost<br />

data specific to the <strong>Halifax</strong> area<br />

Water Master Plan - $0.8 $1.5 $1.5 • Water Master Plan update every 5 years<br />

Total $6.0 $10.5 $14.7 $14.7<br />

Notes:<br />

1. Expenditures are for program development only. Additional expenditures will be required for program<br />

implementation.<br />

7.7 LEVELS OF SERVICE<br />

One of the IRP outcomes was the presentation of the 14 IRP planning objectives. Some<br />

of these objectives are linked to current <strong>Halifax</strong> Water LOS. Table 7.7 presents a series<br />

of recommendations for updating/expanding the current LOS to allow a full evaluation<br />

of program implementation.<br />

Revision: 2012-10-29 Integrated Resource Plan 100<br />