<strong>Halifax</strong> Water Integrated Resource Plan<br />
IRP Implementation Plan<br />
require at least 2 to 3 years to have adequate data and systems in place to obtain strong<br />
returns from scaled-up asset renewal expenditures.<br />
The three-year outlook will be in large measure determined by funding availability. It<br />
expected that the <strong>Halifax</strong> Water capital planning process would determine the<br />
project/program priorities once funding levels have been established.<br />
Other considerations with the first three years of the Recommended IRP include:<br />
• Total program (i.e. planning, business systems improvements and improvements to<br />
administrative facilities) related expenditures correspond to about 8% of the overall<br />
three-year Recommended IRP expenditures. A significant fraction of this program<br />
cost is associated with improvements to the Cowie Hill Operations Facility.<br />
• Additional O&M costs associated with treatment facility or pumping upgrades or<br />
expansions are relatively small in this period corresponding to about 1% of<br />
expenditures.<br />
Details of all expenditures are presented in the Recommended IRP Financial Model in<br />
Volume 1 Appendix H.<br />
7.3 RECOMMENDED IRP EXPENDITURES 2016 -2022<br />
The expenditures for the period 2016 to 2022 are presented in Table 7.3<br />
Table 7.3<br />
Recommended IRP Expenditures 2016 -2022 ($2012 million)<br />
Category<br />
FY<br />
2016<br />
FY 2017<br />
FY<br />
2018<br />
FY<br />
2019<br />
FY<br />
2020<br />
FY 2021<br />
FY<br />
2022<br />
Total<br />
Water $27.9 $47.8 $72.2 $12.6 $14.3 $13.5 $54.0 $242.3<br />
Wastewater $61.9 $54.6 $30.9 $70.5 $30.2 $226.6 $220.5 $695.2<br />
Stormwater $14.9 $3.5 $1.6 $1.6 $1.6 $1.7 $3.2 $28.1<br />
Enterprise Programs (1) $4.7 $3.2 $3.2 $3.2 $3.0 $3.2 $2.6 $23.1<br />
Total Expenditure $109.4 $109.1 $107.9 $87.9 $49.1 $245.0 $280.3 $988.7<br />
Notes:<br />
1. Enterprise Programs refers to <strong>Halifax</strong> Water wide programs such as the SCADA Master Plan, the AMA Program<br />
and the IRP among others.<br />
Under the Recommended IRP, proposed expenditures would be over $989 million in the<br />
7-year period. Approximately $628 million of the total in the Recommended IRP budget<br />
is associated with major wastewater facility upgrades including the $183 million LOT<br />
upgrades at the 8 WWTFs plus BLT ($18.9 million) and implementation of a number of<br />
RWWFP projects. The 7-year water infrastructure budget is $242 million. Major projects<br />
include water transmission upgrades for capacity and system security enhancement,<br />
Revision: 2012-10-29 Integrated Resource Plan 92<br />