<strong>Halifax</strong> Water Integrated Resource Plan<br />

Recommended IRP and Analysis<br />

Figure 6.6<br />

King County I/I Reduction Costs<br />

The capital and operating cost reduction with both water demand and I/I reduction is<br />

about a NPV of $21.2 million to 2043. Using I/I reduction alone corresponds to about<br />

$10 million NPV in cost reduction by 2043.<br />

The flow reduction of 30% in the existing I/I flow would cost about $8.4 million using<br />

King County data. This would provide a potential savings in NPV of $1.6 million ($10<br />

million in savings - $8.4 million I/I program cost) for a future I/I reduction program. This<br />

of course must be tempered with the recognition that local conditions and costs may<br />

prove to be very different than King County and highlights the need for a comprehensive<br />

<strong>Halifax</strong> I/I program.<br />

The case study findings support the importance of including a robust treatment of<br />

demand reduction strategies in regional wastewater planning, including the proposed<br />

Wet Weather System Plan and Wastewater Master Plan. The results of such analysis<br />

may significantly impact the Recommended IRP and should be incorporated when the<br />

IRP is updated.<br />

Through a more comprehensive demand reduction analysis, <strong>Halifax</strong> Water will be able<br />

to assess the effectiveness and affordability of a range of demand reduction solutions<br />

for the wastewater system that may include additional system storage, sewer<br />

separation, sewer twinning, installation of deep storm sewers, and a range of solutions<br />

on the private portion of the network. The formal wet weather planning and I/I<br />

reduction pilot programs proposed in the current IRP will build on the preliminary<br />

Revision: 2012-10-29 Integrated Resource Plan 84<br />

October 31 2012 Page 117 of 272