<strong>Halifax</strong> Water Integrated Resource Plan<br />

Recommended IRP and Analysis<br />

Table 6.1<br />

Recommended IRP Components and Timing<br />

IRP<br />

Driver<br />

IRP Objective<br />

Recommended IRP Strategy<br />

Asset<br />

Renewal<br />

Growth<br />

8. Implement Optimal Level of Asset<br />

Renewal.<br />

9. Enhance the Reliability of Critical<br />

Water and Wastewater Assets.<br />

10. Evaluate Existing Stormwater System<br />

Adequately Sized for Minor Storm<br />

Conveyance.<br />

11. Adapt to Future Climate Change.<br />

12. Reduce Energy Consumption,<br />

Operating Costs and Greenhouse Gas<br />

Contributions.<br />

13. Provide <strong>Regional</strong> Water, Wastewater<br />

and Stormwater Infrastructure<br />

Needed to Support Planned Growth.<br />

14. Manage Flow Capacity Allocations.<br />

• Enhanced asset renewal based on risk-based<br />

composite asset renewal program balancing failure<br />

consequences and renewal expenditures. The<br />

composite specifies an individual level of renewal for<br />

each asset category (See Volume 3, Appendix E).<br />

• Implement water system security program based on<br />

Five-Year Capital Plan modified through the IRP.<br />

• Ten years for stormwater capacity evaluation<br />

program.<br />

• Three years for climate change program<br />

development.<br />

• Implement energy reduction projects based on the<br />

Energy Management Plan as per the Five-Year<br />

Capital Plan.<br />

• Timing for wastewater projects/programs as per<br />

RWWFP; timing for water projects/programs as per<br />

IRP.<br />

• I/I, water efficiency and other demand reduction<br />

projects.<br />

• Timing as per RWWFP or as previously programmed<br />

in Five-Year Capital Plan.<br />

The total 30-year NPV for the recommended plan inclusive of capital and O&M costs is<br />

$2,579 million.<br />

The timing of expenditures (in $2012) is shown in Figure 6.1, which indicates significant<br />

expenditures around years 10, 20 and 30. This corresponds to the following projects:<br />

• Year 10 – WWTF Nutrient Upgrades.<br />

• Year 20 – WSER HHSP WWTF Upgrades.<br />

• Year 30 – Enhanced Overflow Control Program.<br />