05.01.2014 Views

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Halifax</strong> Water Integrated Resource Plan<br />

Integrated Resource Plan Development and Evaluation<br />

5.9 INTERMEDIATE PLAN DEVELOPMENT AND ANALYSIS<br />

Based on the initial plan analysis described above, the following modifications were<br />

applied to the initial plans to develop 18 intermediate plans:<br />

• Plans 1-1 to 14-1 corresponding to Bundles 1 and 2 (modified RWWFP Plans) were<br />

eliminated from further consideration as less environmentally sustainable.<br />

• The timing for the HHSP facilities upgrades (Objective 4) was fixed at 20 years<br />

consistent with the most recent risk analysis.<br />

• Four plans (19-1, 20-1, 26-1 and 27-1) were modified to create 4 new Intermediate<br />

Plans. The enhanced WWTF nutrient program (Objective 4) was changed to the<br />

same level (A, B or C) as Objective 1 and Objective 3 to produce a consistent level<br />

for all wastewater programs. These new plans were labelled 31-2, 29-2, 35-2 and<br />

33-2 respectively.<br />

• Four additional plans (30-2, 32-2, 34-2 and 36-2) were added to allow examination<br />

of the full range of asset renewal and wastewater compliance timing for the<br />

Baseline and Enhanced Overflow Control Plan groupings.<br />

The 18 intermediate plans are presented in Table 5.9.<br />

Table 5.9<br />

Plan<br />

No.<br />

Intermediate Alternative Resource Plans<br />

30 Yr. NPV<br />

$million<br />

Current<br />

WWTF<br />

Objective<br />

1<br />

Current<br />

Overflow<br />

Objective 3<br />

Future<br />

WWTF<br />

Nutrient<br />

Objective<br />

4<br />

Future<br />

Overflow<br />

Objective<br />

6 & 13<br />

Asset Renewal<br />

Objective 8<br />

15-2 $2,011 C C C Baseline C<br />

16-2 $2,129 A A A C<br />

17-2 $2,815 C C C A<br />

18-2 $2,932 A A A A<br />

21-2 $2,466 B B B B<br />

29-2 $2,066 B B B C<br />

30-2 $2,411 C C C B<br />

31-2 $2,528 A A A B<br />

32-2 $2,870 B B B A<br />

22-2 $2,083 C C C Enhanced C<br />

23-2 $2,200 A A A C<br />

24-2 $2,886 C C C A<br />

25-2 $3,003 A A A A<br />

28-2 $2,537 B B B B<br />

33-2 $2,137 B B B C<br />

34-2 $2,482 C C C B<br />

35-2 $2,599 A A A B<br />

36-2 $2,941 B B B A<br />

Revision: 2012-10-29 Integrated Resource Plan 70<br />

October 31 2012 Page 103 of 272

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!