<strong>Halifax</strong> Water Integrated Resource Plan<br />
Integrated Resource Plan Development and Evaluation<br />
5.9 INTERMEDIATE PLAN DEVELOPMENT AND ANALYSIS<br />
Based on the initial plan analysis described above, the following modifications were<br />
applied to the initial plans to develop 18 intermediate plans:<br />
• Plans 1-1 to 14-1 corresponding to Bundles 1 and 2 (modified RWWFP Plans) were<br />
eliminated from further consideration as less environmentally sustainable.<br />
• The timing for the HHSP facilities upgrades (Objective 4) was fixed at 20 years<br />
consistent with the most recent risk analysis.<br />
• Four plans (19-1, 20-1, 26-1 and 27-1) were modified to create 4 new Intermediate<br />
Plans. The enhanced WWTF nutrient program (Objective 4) was changed to the<br />
same level (A, B or C) as Objective 1 and Objective 3 to produce a consistent level<br />
for all wastewater programs. These new plans were labelled 31-2, 29-2, 35-2 and<br />
33-2 respectively.<br />
• Four additional plans (30-2, 32-2, 34-2 and 36-2) were added to allow examination<br />
of the full range of asset renewal and wastewater compliance timing for the<br />
Baseline and Enhanced Overflow Control Plan groupings.<br />
The 18 intermediate plans are presented in Table 5.9.<br />
Table 5.9<br />
Plan<br />
No.<br />
Intermediate Alternative Resource Plans<br />
30 Yr. NPV<br />
$million<br />
Current<br />
WWTF<br />
Objective<br />
1<br />
Current<br />
Overflow<br />
Objective 3<br />
Future<br />
WWTF<br />
Nutrient<br />
Objective<br />
4<br />
Future<br />
Overflow<br />
Objective<br />
6 & 13<br />
Asset Renewal<br />
Objective 8<br />
15-2 $2,011 C C C Baseline C<br />
16-2 $2,129 A A A C<br />
17-2 $2,815 C C C A<br />
18-2 $2,932 A A A A<br />
21-2 $2,466 B B B B<br />
29-2 $2,066 B B B C<br />
30-2 $2,411 C C C B<br />
31-2 $2,528 A A A B<br />
32-2 $2,870 B B B A<br />
22-2 $2,083 C C C Enhanced C<br />
23-2 $2,200 A A A C<br />
24-2 $2,886 C C C A<br />
25-2 $3,003 A A A A<br />
28-2 $2,537 B B B B<br />
33-2 $2,137 B B B C<br />
34-2 $2,482 C C C B<br />
35-2 $2,599 A A A B<br />
36-2 $2,941 B B B A<br />
Revision: 2012-10-29 Integrated Resource Plan 70<br />
October 31 2012 Page 103 of 272