Annual Report 2000 - Halifax Regional Municipality
Annual Report 2000 - Halifax Regional Municipality
Annual Report 2000 - Halifax Regional Municipality
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Public Works & Transportation<br />
Services<br />
F<br />
ormulated under<br />
Alignment <strong>2000</strong>, Public<br />
Works and Transportation<br />
Services was created to<br />
consolidate all critical and<br />
operational services<br />
regarding management of<br />
the municipality’s<br />
infrastructure. The<br />
services provided include<br />
Design and Construction<br />
Services, whose main<br />
function is the<br />
coordination of the<br />
Capital Budget, which<br />
entails the evaluation and<br />
prioritization of<br />
infrastructure<br />
requirements, design,<br />
tender call,<br />
construction inspection<br />
and project management;<br />
Traffic and<br />
Transportation Services<br />
are responsible for the<br />
approvals and installation<br />
of traffic control devices,<br />
as well as the planning of<br />
orderly expansion and the<br />
safe, effective operation of<br />
the municipality’s<br />
transportation<br />
network;<br />
Environmental and<br />
Engineering Approval<br />
Services manage the<br />
wastewater and<br />
stormwater infrastructure<br />
by ensuring system<br />
capacity, investigation and<br />
determining solutions to<br />
specific problems,<br />
administering and<br />
enforcing legislation,<br />
drafting, implementing<br />
and amending by-laws,<br />
policies and<br />
procedures;<br />
Street and Roads Services<br />
provide maintenance<br />
services for municipalowned<br />
streets and<br />
sidewalks; Technical and<br />
Underground Services are<br />
responsible for the<br />
maintenance of collection<br />
and transportation of the<br />
wastewater and storm<br />
drainage systems; and<br />
Wastewater Treatment<br />
Services manage the<br />
treatment<br />
of<br />
wastewater at 14 pollution<br />
control plants providing<br />
environment and public<br />
health protection.<br />
Accomplishments<br />
Bridge Approaches<br />
Major improvements<br />
to both approaches to the<br />
Angus L. Macdonald<br />
bridge to complement<br />
the additional<br />
bridge lane.<br />
Traffic Signals<br />
Design and<br />
construction of five new<br />
traffic signal installations.<br />
Pollution Prevention<br />
Program<br />
Phase 1 of the<br />
Pollution Prevention<br />
Program (source control)<br />
implemented.<br />
Unpaved Streets<br />
Reinstatement of chipsealing<br />
program for stone<br />
& oil on unpaved streets.<br />
Sewer Lateral Maintenance<br />
Implemented increased<br />
service levels for sewer<br />
lateral maintenance.<br />
Wastewater Treatment<br />
Eastern Passage Water<br />
Pollution Control Plant<br />
odour control addition.<br />
30