Page1 GRAM: TRANSGRID Phone No.(02836) 245784 Fax No.(02836) 241588 CONSTRUCTION DIVISION OFFICE, 220KV COMPOUND S/S ANJAR, ANJAR - KUTCH – 370 110. E - Mail:- eeconstanj@yahoo.co.in TECHNICAL B I D NAME OF WORK: Civil work for Dayapar feeder bay at 66 kV switch yard of KLTPS, Panandhro.
- Page 2 and 3: Page2 GUJARAT ENERGY TRANSMISSION C
- Page 4 and 5: Page4 The Tenderer should have to s
- Page 6 and 7: Page6 14. The bid shall accompany b
- Page 8 and 9: Page8 Gujarat Energy Transmission C
- Page 10 and 11: Page10 20) Tender offer without pay
- Page 12 and 13: Page12 GUJARAT ENERGY TRANSMISSION
- Page 14 and 15: Page14 GUJARAT ENERGY TRANSMISSION
- Page 16 and 17: Page16 GRAM: TRANSGRID Phone No.(02
- Page 18 and 19: Page18 GUJARAT ENERGY TRANSMISSION
- Page 20 and 21: Page20 13 Providing and placing 50
- Page 22 and 23: Page22 GUJARAT ENERGY TRANSMISSION
- Page 24: Page24 GUJARAT ENERGY TRANSMISSION
Page1<br />
GRAM: TRANSGRID Phone No.(02836) 245784<br />
Fax No.(02836) 241588<br />
CONSTRUCTION DIVISION OFFICE,<br />
220KV COMPOUND S/S ANJAR,<br />
ANJAR - KUTCH – 370 110.<br />
E - Mail:- eeconstanj@yahoo.co.in<br />
TECHNICAL B I D<br />
NAME OF WORK:<br />
Civil work for Dayapar feeder bay at<br />
66 kV switch yard of KLTPS, Panandhro.
Page2<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DIVISION<br />
ANJAR (KUTCH)<br />
NAME OF WORK: - Civil work for Dayapar feeder bay at 66<br />
kV switch yard of KLTPS, Panandhro.<br />
SR.<br />
NO.<br />
(TECHNICAL BID)<br />
INDEX<br />
PARTICULARS<br />
1 Tender Notice 3-4<br />
2 General Instruction 5-7<br />
3 Terms & Condition 8-10<br />
4 Section I 11<br />
PAGE NO.<br />
6 Special Condition 12-13<br />
7 Special Condition for use of Cement in work 14-15<br />
Price Bid 16<br />
8 Note for Schedule “B” 17<br />
9 Schedule “B” 18-20<br />
10 Schedule “C” 21<br />
11 Schedule “D” 22<br />
12 Schedule “E” 23<br />
13 Schedule “F” 24<br />
14 Drawing (Bid purpose only) See Note<br />
15 Detailed Specification for Civil Work booklet See Note<br />
(Inclusive 114 Pages)<br />
16 Tender and Contract for works booklet See Note<br />
NOTE:<br />
Booklet for “Tender and Contract for Works” and “General Specification for Civil<br />
works (Effective 01-04-1991)” and detailed drawings, are available in the Office of<br />
Under signed for reference and it is binding upon to Contractor and Presumed that<br />
the same is read and gone through. (If not attached with Tender Copies).
Page3<br />
(Technical & Commercial Bid)<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED<br />
TRANSMISSION CIRCLE, ANJAR.<br />
CONSTRUCTION DIVISION – ANJAR.<br />
FAX : (02836) 245784 PHONE No: (02836) 245784<br />
E-mail: eeconstanj@yahoo.co.in, eeconstanjar@gebmail.com<br />
Sealed percentage rate tenders are invited in two separate sealed covers super scribed technical<br />
bid and price bid for “Civil work for Dayapar feeder bay at 66 kV switch yard of KLTPS,<br />
Panandhro” from Registered Contractors in appropriate class with<br />
GETCO/Central/State Government / Railway/Semi. Govt. and who has executed<br />
similar nature of work and magnitude successfully by Executive Engineer (Const.),<br />
GETCO, 220 kV S/S Compound, Bhuj Road, Anjar (Kutch).<br />
Sr.<br />
No.<br />
Name of Work<br />
1 Civil work for Dayapar feeder<br />
bay at 66 kV switch yard of<br />
KLTPS, Panandhro.<br />
Estimated<br />
Cost Rs.<br />
Time<br />
Limit<br />
1,89,327.50 1<br />
Month<br />
Tender<br />
Fee Rs.<br />
E.M.D.<br />
Rs.<br />
190.00 1900.00<br />
1. Last date of submission of tender: (Technical and Price bids): .11.2010 (Only by RPAD / Speed<br />
post, During working Hrs. up to 15.00 Hrs.)<br />
2. Due date of opening of Technical bid: .11.2010 (at 16.00 Hrs., if possible)<br />
3. Validity of tender: 180 Days from the date of opening of Technical Bid.<br />
No tender shall be accepted / opened in case of receipt after due date and time of tender,<br />
irrespective of delay due to postal services or any other reasons and the GETCO shall not assume<br />
any responsibility for late receipt of tender.<br />
The tenders are to be submitted by the intending bidders in single envelop with two separate sealed<br />
and super scribed envelopes as listed below:<br />
Envelope No.1: Technical bid and pre qualification requirement, bid data, details specification.<br />
Envelope No.2: Price Bid.<br />
Technical and pre qualification requirement bid details specification (envelope No.1) will be opened<br />
first and subject to evaluation based on the qualification criteria contained in the individual bid<br />
document.<br />
Price bids (Envelope No.2) of bidders who are assessed and declared as substantially technically<br />
responsive on evaluation of the technical bid will be opened for further commercial evaluation.<br />
The Earnest Money Deposit and Tender fee will be accepted by Demand Draft on any nationalized<br />
bank only situated at “ANJAR”, drawn in favor of “GUJARAT ENERGY TRANSMISSION<br />
CORPORATION LTD.”. Tender without EMD and tender fee shall be rejected. Two separate<br />
demand drafts for Tender fee and EMD should be submitted with technical bid.<br />
Tender document can be down loaded from our web site WWW.gseb.com<br />
Interested party requested to visit our Web Site as mentioned.
Page4<br />
The Tenderer should have to submit with Tender on latter pad along with attested copies of the<br />
certificate of (1) PAN No. (2) Registration from GETCO (3) Solvency Certificate from Schedule Bank<br />
/ Revenue Bank, (4) Partnership deed, (5) Latest Registration Certificate for provident fund of<br />
Employees / Labors and P.F. Code No. and its latest receipt, (6) Experience Certificate (7) Vat<br />
Registration (8) Service Tax Registration (9) Payment of Tender Fee & EMD in D.D. in favour<br />
GETCO, ANJAR.<br />
The GETCO reserves the rights to reject any or all tenders or accept any tender without assigning<br />
any reason thereof.<br />
Executive Engineer<br />
Construction Division<br />
GETCO, ANJAR.
Page5<br />
GENERAL INSTRUCTION TO BIDDER<br />
1. The tender should be submitted in a sealed envelope on which it should be distinctly<br />
indicated the name of work. Bidder should quote percentage for civil work of<br />
“Construction of Revetment wall for protection of 220 kV tower foundation at Loc. No.<br />
03, 41, 47 & 53 of 220 kV Nanikhakhar – Shivlakha line LILO at 220 kV Kukma s/s.” as<br />
per Schedule “B” of the tender specification.<br />
2. Bidder must be confirming their full acceptance to various terms and conditions of<br />
GETCO’s specification. They should also confirm that offers are based strictly on the<br />
specification data in all respects.<br />
3. An earnest money deposit of Rs. 3550/- shall have to remitted by the bidder by way of<br />
Cash or Demand Draft payable to “<strong>Gujarat</strong> Energy Transmission corporation Ltd.”<br />
drawn on a schedule bank in Anjar with the tender only. Cheques or in any other form<br />
towards payment of earnest money deposit will not be accepted and the bid will be<br />
disqualified. Registered contractors shall deposit the amount in accordance with the<br />
conditions of registration with the GETCO.<br />
4. The bidder is required to quote only firm prices for all items. No variation on price<br />
statutory or otherwise on raw materials or finished products on any clause will be<br />
accepted.<br />
5. The bidders should note that the completion of above works in all respect in accordance<br />
with the time limit given below is very important and should be strictly adhered to<br />
“Completion in 1 (ONE) Month from the date of issue of letter for commencement of<br />
the work. Failing to complete the work within the period stipulated the contractor will<br />
have to pay compensation as per terms of the agreement; penalty will be levied as per<br />
rules.<br />
6. The bidders should furnish a list of similar works executed by them and clearly mention<br />
the name of the party for whom the works have been completed. The reference of order<br />
number and date performance report of such works is furnished in attached bidding at<br />
Schedule “C”.<br />
7. The bids should be valid for a minimum period of 6 months from the date of opening.<br />
8. The prospective bidder shall have executed satisfactorily similar works of large<br />
magnitude in time and have full fledge Engineering Organization to handle this highly<br />
specialized skilled work and such experience will be one of the major consideration in<br />
evaluating and finalizing this tender.<br />
9. The works covered under these specification shall be carried out and governed by<br />
“Tender and contractor for works” booklet appended herewith except where condition<br />
specified in this specifications.<br />
10. COORDINATION WITH OTHERS:<br />
11. The contractor shall have to execute the above works with the concern agencies that<br />
required. The Contractor shall co-operate in all aspects and exchange the necessary<br />
technical data/drawings with the consultants/Architects/Structural Engineers/ Contractors<br />
with permission from Engineer-In-Charge to ensure proper co-ordination and satisfactory<br />
completion of the work in time.<br />
12. Any more information of the proposed work may be referred from the office of the<br />
Superintending Engineer (TR)/ Executive Engineer (Const.) GETCO Transmission<br />
Circle/ Construction Division Anjar: Kutch during the office hours.<br />
13. The successful contractor shall have to sign an agreement as per <strong>Gujarat</strong> Energy<br />
Transmission Corporation Ltd. rules on a stamp paper and necessary stamp duty charge<br />
shall be borne by the contractor.
Page6<br />
14. The bid shall accompany by a covering letter in which the bidder shall give all<br />
information as called for in the specification and any other points which he would like to<br />
consider along with the tender. If such covering letter if not received along with the bid,<br />
it will be presumed that the bidder agreed entirely with the specifications and general<br />
terms and conditions of the contract booklet.<br />
15. Following certified copy of documents are required to be Attached with tender submitted<br />
by you:<br />
a. Solvency certificate latest issued by schedule Bank.<br />
b. Work experience i.e. similar work done, order placed by GEB/GETCO or other<br />
department.<br />
c. Labour License<br />
d. Registration of appropriate class certificate.<br />
e. Provident Fund No.<br />
f. Company Registration copy.<br />
g. Partnership deed copy (if any).<br />
h. Power of Attorney if given.<br />
i. Service Tax Registration<br />
j. Pan Card No.<br />
k. VAT No.<br />
Above documents are required to be attached with tender submitted. Failing which<br />
tender/offer will be rejected/ ignored and no correspondence will entertain in this matter<br />
of future.<br />
16. The work shall commence immediately after the order for commencement is issued.<br />
17. Bidder shall indicate in Schedule-“F” the equipment in his possession and propose to<br />
bring to the site, in case the work is awarded.<br />
18. The complete specification comprises of the following:<br />
General Instruction to Bidders<br />
General Conditions of Contract<br />
Safety Code<br />
Technical Specifications<br />
Bidding Schedule<br />
All these sections are supplementary to each other and the particulars and requirements<br />
contained have in shall covering the execution “Civil work for Dayapar feeder bay at 66 kV<br />
switch yard of KLTPS, Panandhro.”<br />
19. The testing of materials, concrete cube tests shall be done by the contractor. The alltesting<br />
charges shall be borne by the contractor.<br />
20. No collection of materials shall be made before it is got approved from the Engineer-In-<br />
Charge.<br />
21. Materials, if and when rejected by the Engineer-In-Charge shall be immediately removed<br />
from the Site.<br />
22. All installations pertaining to water supply and fixtures thereof as well as drainage lines<br />
and sanitary fitting shall be deemed to be completed only after giving satisfactory tests<br />
by the contractor.
Page7<br />
23. Approval to the samples of various materials, given by the E.I.C. shall not absolve the<br />
Contractor from the responsibility of replacing defective material brought on site or<br />
materials used in the work found defective at a latter date. The contractor shall have no<br />
claim to any payment of compensation whatsoever on account of any such material being<br />
rejected by E.I.C.<br />
24. Approval to any of the executed item for the work does not in any way relieve the<br />
contractor of his responsibility for the correctness, soundness and strength of the<br />
structure as per the drawing and specification.<br />
25. High yield strength steel deformed bars be either cold twisted or hot rolled shall confirm<br />
No. IS 1739-1966 and IS 1139-1966 respectively. It shall also comply with relevant part<br />
of IS 456-1978.<br />
26. Contractor has to utilize the mechanical vibrator for proper compaction for all concreting<br />
work as per the directions of Engineer-In-Charge.<br />
27. The drawings if any attached with the tender for bid purpose. However contractor shall<br />
have to carryout the work as per the construction drawing issued from time to time.<br />
28. The contractor shall have a separate Provident Fund code of RPFC and the contractor<br />
who not posses separate P.F. code shall not be considered for acceptance of tender.<br />
Contractor has to submit such Certificate showing separate P.F.Code along with tender.<br />
EXECUTIVE ENGINEER (CONST.)<br />
CONSTRUCTION DIVISION<br />
ANJAR.
Page8<br />
<strong>Gujarat</strong> Energy Transmission Corporation Ltd.,<br />
Construction Division, Anjar.<br />
TERMS & CONDITIONS<br />
1. Terms & Condition :<br />
General terms and conditions, commercial terms and conditions for Construction of Revetment wall for<br />
protection of 220 kV tower foundation at Loc. No. 03, 41, 47 & 53 of 220 kV Nanikhakhar – Shivlakha<br />
line LILO at 220 kV Kukma s/s including service deposit, payment terms, warranty, income tax, handing over<br />
and documents of Transmission line, schedules and other formats applicable to this order shall be as per the<br />
tender specification of GETCO as you have to agree to all the terms and condition of our tender specification<br />
in total except to the extent specifically indicated hereunder.<br />
2. Prices & Scope of the work:<br />
The prices and scope of the work quoted for Construction of Revetment wall for protection of 220 kV tower<br />
foundation at Loc. No. 03, 41, 47 & 53 of 220 kV Nanikhakhar – Shivlakha line LILO at 220 kV Kukma s/s<br />
are indicated in the Price Bid + Service Tax as applicable.<br />
3. Security Deposit cum Performance Bank Gaurantee :<br />
Security Deposit is for satisfactory execution of the contract and as Performance Guarantee. Security<br />
Deposit should be in the form of Bank Guarantee. The bank guarantee furnished should have clear one time<br />
validity till the completion of the order in all respect & up to expiry of the guarantee period of 2 (two) years<br />
from the date of commissioning of transmission line. The contractor will have to pay the Security Deposit at<br />
5% of the order value. On placing the order, 2.5% will have to paid in demand draft in favor of „GUJARAT<br />
ENERGY TRANSMISSION CORPORATION LTD‟ within 7 days from the date of the issue of LOI, and the<br />
remaining 2.5% will be recovered from the first two R.A. Bills and higher percentage of security deposit may<br />
be fixed at the direction of The Executive Engineer.<br />
4. Completion Period :<br />
You have to commence the survey activity from the commencement date and shall have to complete survey<br />
and route alignment of transmission lines within 01 Month completing all the activities including preparing<br />
BOQ consisting of quantity of towers and extensions & type of foundations for transmission lines listed in the<br />
Price Bid.<br />
5. Penalty for Delay :<br />
The completion time allowed shall be strictly observed. In case of failure to complete contract work within the<br />
stipulated completion period, you shall be liable to pay penalty at the rate of ½ % value of delayed work per<br />
week or part thereof the contract value subject to ceiling of 10% of the total contract value.<br />
This will deducted from the bills payable either against this contract or any bank guarantee or any other<br />
amount payable under any other contract with the <strong>Board</strong>.<br />
6. Force Majeure :<br />
6.1 Force Majeure is herein defined as any cause which is beyond the control of the contractor or the<br />
owner as the case may be, which they could not foresee or with a reasonable amount of diligence<br />
could not have foreseen and which substantially affects the performance of the contract such as:<br />
a. Natural phenomena including but not limited to floods, droughts, earthquakes and epidemics;<br />
b. Acts of any Government, domestic or foreign including but not limited to war, declared or<br />
undeclared, priorities, guarantees and embargoes.<br />
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the<br />
other in writing of such causes.<br />
6.2 The contractor or the owner shall not be liable for delays in performing his obligations resulting from<br />
any force majeure cause as referred to and/or defined above.<br />
The date of completion will subject to herein after provided be extended by a reasonable time even<br />
through such cause may occur after contractor‟s performance of obligation has been delayed due to<br />
other causes.<br />
7. Terms of Payment :<br />
Normally, one R.A. Bills will be paid every month, however, looking to the progress of the work it will be<br />
reviewed mutually and 90% of the cost of work done will be paid to the Contractor on his presentation of R.A.<br />
Bill giving the material account thereof. Remaining 10% Payment will be made after the entire work is
Page9<br />
completed satisfactorily in all respect. The payment will be made through Account Payee Cheque only. The<br />
Bill should be submitted to our Deputy Engineer (Civil) BHUJ with a copy to Executive Engineer (Const.),<br />
Anjar. Final bill will be prepared by our Deputy Engineer (Civil) BHUJ within about fortnight from the date<br />
of completion of the work by the Contractor.<br />
8. Presentation of Bills :<br />
Final bill for the concern work in original with one copy shall be submitted to E.E. (Const), Anjar for passing<br />
and processing for payment.<br />
9. Agreement / Indemnity Bond :<br />
You shall have to execute the contract agreement at your own cost on the stamp paper of Rs. 100/- and<br />
have also to submit Indemnity bond on the stamp paper of Rs. 100/- as per the prescribed format appended<br />
with the specification enclosed.<br />
10. Progress :<br />
The progress of concern work shall be reviewed by the GETCO from time to time by way of meeting and you<br />
have to submit the fortnightly progress report in prescribed proforma to the Ex. Engineer (Const), Anjar<br />
regularly without fail.<br />
11. General Conditions :<br />
1) The tenders shall remain open for acceptance at least for a period of Six Months, from the date of<br />
opening of tenders.<br />
2) The <strong>Gujarat</strong> Energy Transmission Corporation Limited does not bind itself to accept the lowest or any<br />
tender. The Executive Engineer (Const.), ANJAR reserves the right to reject any or all tender without<br />
signing any reasons whatsoever.<br />
3) The contractor should employee as Supervisor with sufficient qualification and experience who could<br />
supervise the execution of work thought. He should always be present on the site.<br />
4) The work should be commenced immediately from the date of receipt of instructions from office and<br />
should be completed within thereafter.<br />
5) The tender includes all minor accessories and items of work which hay not have been specifically<br />
mentioned in the specification schedule etc. but are essential for completion of work. The contractor<br />
will not be eligible for any extra payment in respect of such minor accessories and items of work.<br />
6) Tenderer should be qualified only who have P. F. Registration, Service Tax Registration, Vat<br />
Registration & Work Registration.<br />
7) Service tax will be paid as per prevailing norms on production of service tax registration. And against<br />
production of payment proof.<br />
8) No higher rate of revised rate will be applicable for the work, if work is held up/ closed due to<br />
whatever so reasons.<br />
9) In case of any dispute/ doubt, the decision of Executive Engineer (Const), GETCO, ANJAR shall be<br />
unchallengeable, final and binding to the contractor.<br />
10) 10% retention money will be deducted from each R.A. Bills.<br />
11) The tendered should furnished details of past experience of such jobs of similar nature completed by<br />
him satisfactorily within the time limit in GETCO without this certificate offer shall be rejected out<br />
rightly.<br />
12) The quantum of the work as mention in estimate/ schedule –„B‟ is tentative and it can be very differ as<br />
per site condition. The payment shall be made only on actual work executed or order quantity,<br />
whichever is less.<br />
13) The tenderer will be abide by and fulfill all the terms and provisions of the “Tender & Contract” for<br />
works as applicable and incase of any default there to the GETCO shall for fit the S.D. or any other<br />
action as may be decided by Executive Engineer (Const), GETCO, ANJAR.<br />
14) The time limit for the work may be reduced and contractor should make all his efforts to complete the<br />
work within stipulated time limit as may be given by the Engineer in charge depending upon<br />
emergency of work, GETCO reserves the right to reduce the time limit without giving any notice.<br />
15) The contractor has to remain in close day contact with D.E. (Civil), concern S/Dn Engineer in charge<br />
of work who in turn shall issue detailed instruction for the commencement of the work.<br />
16) Contractor will abide by and fulfill all the terms and conditions and general terms and condition of the<br />
contract for works available in the office.<br />
17) All other general terms and conditions as prevailing in the GETCO shall be applicable to the contract.<br />
18) The contractor will have to complete entire job as per directive and instruction of Engineer in charge.<br />
If he fails to do so entire work will be carried out at contractor‟s risk and cost.<br />
19) The tender shall be issued to only the experience and contractor who has completed such job of<br />
similar nature and magnitude satisfactorily in time. However, issuance of blank tender, will does not<br />
qualifies the tenderer to offer the bid.
Page10<br />
20) Tender offer without payment of EMD required certificate, documents, bar chart list of tools, tackles,<br />
equipments etc. required for execution of job will be out rightly rejected without assigning any reason<br />
thereof and decision of Executive Engineer (Const), Anjar will be final and unchallengeable.<br />
21) The Contractor will be governed by The GETCO‟s general conditions of works contract. The Booklet<br />
will be available in the concerned office in any working days. In the event of placing order, the<br />
contractor will have to sign this booklet along with other document and agreement. All the usual terms<br />
and conditions of the GETCO, through the same might have not been mentioned in this specification<br />
or contractor booklet will applicable to this contract, and the decision of the Executive Engineer/<br />
Superintending Engineer shall be binding on the contractor.<br />
22) Specification in any items mentioned in tender are subject to change without any prior notice and<br />
binding to the contractor.<br />
23) GETCO shall deduct the Income-Tax and other taxes as per prevailing rules from each and every bill.<br />
24) If required by GETCO you shall have to provide free to and fro traveling facility to our Junior Engineer<br />
or Technical staff for the work.<br />
25) The contractor shall not refuse to execute the work order at any time and it will be his sole<br />
responsibility to execute and complete this work as per the instruction of Engineer in charge.<br />
26) The contractor has to carry out all the works in accordance with revised and latest provision under<br />
I.E. Rules Act made there under and as per instruction of Engineer in charge.<br />
27) Registered class „A‟ contractors with the GETCO and having furnished Rs. 5 Lacs bank guarantee<br />
towards lump sum permanent deposit are exempted from to renew / extend the validity of registration<br />
and bank guarantee well in time before expiry dates.<br />
28) The S.S.I. Industries will be exempted from the payment of Security Deposit provided a competency<br />
certificate is issued by the Regional Division Officer of the National Small Scale Industries<br />
Corporation to the effect that the firm is capable of executing the order.<br />
29) No subcontractor, Power of Attorney shall be allowed.<br />
30) No part rate or reduced rate shall be allowed in final bill.<br />
31) The undersign reserve rights to reject any or all the tenders without assigning any reasons thereof.<br />
Issuance of blank tender does not automatically qualifies the tenderers for award.<br />
32) No tools, tackles, manpower, etc will be provided by the GETCO.<br />
33) The contractor has to follow all labour laws, safety rules and regulations. The GETCO does not take<br />
any responsibility in case of accident or injury to the workers. The safety/ security of men, materials<br />
and equipments shall be sole responsibility of the contractor.<br />
34) The compliances of all Central/ State Govt. rules, safety and insurance rules etc. and that of local<br />
body, is a must condition for the agency.<br />
35) The bidder shall specifically note that GETCO will not pay any extra amount towards any type of<br />
claim except for the description indicated in Schedule – „B‟. The party has to carry out all other/<br />
additional required activities/ works as directed by Engineer in charge which is not mentioned in<br />
Schedule but required to be completed as per site condition and for this work no extra payment shall<br />
be made by GETCO.<br />
36) The contractor shall co-operate with the GETCO in recording measurement etc as expeditiously as<br />
possible and he shall fulfill all the requirements which are necessary to finalize the accounts on the<br />
basis of its records and pay him such amount as if found due to him together with the amount of<br />
security deposit. If any remaining payable to him after deduction there from the amount due by him to<br />
the GETCO. The GETCO shall not entertain further claim from thereafter.<br />
37) The contractor shall not refuse to execute this work order at any time and it will be his sole<br />
responsibility to execute and complete this work as per the instruction of Engineer in charge.<br />
38) <strong>Electricity</strong> Rules:- All the works shall be carried out in accordance with latest rules<br />
under <strong>Electricity</strong> Act.<br />
39) The interpretation of specifications doubts etc.:- In case of any doubts about what is mentioned<br />
in specification or schedule or elsewhere, the tenderer should get all doubts cleared from the<br />
Department in writing and in advance of filling in the Tender. In case of difference of opinion about<br />
interpretation of specification etc the decision of Executive Engineer will be final and shall be binding<br />
to the contractor.<br />
Executive Engineer (Const.)<br />
GETCO,D.O., ANJAR.
Page11<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DIVISION, ANJAR (KUTCH).<br />
SECTION: I<br />
GENERAL CONDITIONS OF CONTRACT FOR CIVIL CONSTRUCTION WORK CONSTRUCTION OF<br />
REVETMENT WALL FOR PROTECTION OF 220 KV TOWER FOUNDATION AT LOC. NO. 03, 41, 47<br />
& 53 OF 220 KV NANIKHAKHAR – SHIVLAKHA LINE LILO AT 220 KV KUKMA S/S.”<br />
1.0 SAFETY CODE:<br />
1.01 There shall be maintained in a readily accessible place first aid appliances<br />
including adequate supply of sterilized dressings and cotton wool.<br />
1.02 An injured person shall be taken to a public hospital without loss of time, in case<br />
where the injury necessities hospitalization.<br />
1.03 Suitable and strong scaffolds should be provided for workmen for all works that<br />
cannot safely be done from ground.<br />
1.04 No portable single ladder shall be over 8 meters in length. The width between<br />
the side rails shall not be less than 30cm (clear) and the distance between two<br />
adjacent runs shall not be more than 30cm. When a ladder is used and extra<br />
mazdoor shall be ensured for holding the ladder.<br />
1.05 No floor, roof or other part of the structure shall be overloaded with debris or<br />
materials as to render it unsafe.<br />
1.07 (1) No paint containing lead or lead products shall be used expect in form of paste<br />
or ready-made paint.<br />
(2) Suitable facemasks should be supplied for use by the workers when the<br />
paint is applied in the fork of spray or surface having lead paint dry rubber<br />
and scrapped.<br />
1.08 The contractor shall supply over all and adequate facilities shall to enable the<br />
working painters to wash during the period of cessation of work.<br />
1.09 Carpentry Tools and tackle used in the works including their attachments,<br />
anchorage and supports shall be in perfect conditions.<br />
1.10 The ropes used in the hoisting or lowering or as suspension shall be durable<br />
quality and adequate strength and free from defects.<br />
EXECUTIVE ENGINEER (CONST.)<br />
CONSTRUCTION DIVISION<br />
ANJAR.
Page12<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DIVISION, ANJAR (KUTCH)<br />
SPECIAL CONDITIONS<br />
Following are the GETCO’s special conditions for this project and wherever these special<br />
conditions contradict with similar conditions in this tender document, the following special<br />
conditions shall prevail.<br />
1.0 ARBITRATION<br />
In view of Government of <strong>Gujarat</strong>’s directive the Arbitration Clause provided at Sr.No.30 of<br />
the Chapter in Booklet of “TENDER AND CONTRACTOR THE WORKS” in Tender<br />
specification and other related reference for Arbitration now stands deleted.<br />
In its place following clause is to be substituted:<br />
“ALL QUESTIONS, DISPUTED, DIFFERENCES, WHATSOEVER WHICH MAY AT ANY TIME ARISE<br />
BETWEEN THE PARTIES TO THIS CONTRACT IN CONNECTION WITH THE CONTRACT OR ANY<br />
MATTER ARISING OUT OF OR IN RELATION THERE TO, SHALL BE REFERRED TO THE<br />
“GUJARAT PUBLIC WORKS CONTRACTS DISPUTE ARBITRATION TRIBUNAL” AS PER THE<br />
PROVISIONS OF THE GUJARAT PUBLIC WORKS CONTRACTS DISPUTES ARBITRATIKON<br />
TRIBUNAL ACT, 1992”<br />
1.1 The reference to arbitration proceeding under this clause shall not:<br />
(a) Affect the right of the Engineer-in-charge to take possession of all or any tools, plants<br />
materials and stores, in our upon the work or site thereof belonging to the contractor or<br />
produced by him and intended to be used for the execution of the work or any part<br />
thereof.<br />
(b) Preclude the Engineer-in-charge from utilizing the materials purchased by the<br />
Contractor in any work or from removing such materials to other place, during the<br />
period the work is stopped or suspended in pursuance of notice given to the contractor<br />
under General Conditions.<br />
(c) Entitle the contractor to stop the progress of the work or carrying out the additional or<br />
altered work in accordance with the provisions of General conditions or the work where<br />
there is no specification.<br />
(d) Preclude party is entitled to bring a claim to arbitration latest by thirty days after the<br />
expiration of the defects liability period.<br />
1.2 Neither party is entitles to bring a claim to arbitration latest by thirty days after the<br />
expiration of the defects liability period.<br />
1.3 The provisions of the Arbitration Act.1992, <strong>Gujarat</strong> Public Works Contract Disputes<br />
Arbitration Tribunal Act, 1992, and rules made there under shall apply to the arbitration<br />
proceeding under this clause.<br />
2.0 The successful Bidder, on receipt of letter of intent will submit within a week’s time his<br />
planning/ programme of works, for scrutiny of <strong>Gujarat</strong> Energy Transmission<br />
Corporation Ltd. in a Pert/Bar Chart format, clearly indication GETCO’s inputs also.
Page13<br />
3.0 Contractor will plan his works such that on all the fronts released by GETCO<br />
simultaneous work should progress in such a way that entire job is completed in<br />
schedule time limit.<br />
4.0 The successful bidder will have to depute his authorized representative to attend<br />
progress review meetings to be held either at the site or at GETCO’s, TR Circle Office/<br />
Construction Division office at Anjar.<br />
5.0 Security Deposit (5% of contract value) shall be payable by the contractor within fifteen<br />
(15) days from the date of issue of intent. Security Deposit in approved form of Bank<br />
Guarantee valid during the contractual period shall be acceptable. However, such Bank<br />
Guarantee should not be reduced on the basis of the work actually done and the Bank<br />
Guarantee should be kept valid till the maintenance period is over or passing of banal<br />
bill after due scrutiny by technical and accounts section whichever is later. This shall<br />
be refunded as per GETCO’s norm.<br />
6.0 The contractor will be responsible for complying with all rules and regulations and<br />
labour laws applicable to him and GETCO will responsible for any lapse committed by<br />
them If there is any claim from any Government authority pertaining to the contract, the<br />
same amount will be deducted from the Contractor’s bill.<br />
7.0 The GETCO will not give the land required for office, godowns and for Labour Camp.<br />
The contractor has to arrange at his cost.<br />
8.0 THE TIME LIMIT FOR COMPLETION OF WORK IS STIPULATED AS<br />
CALENDER MONTHS, WILL BE ADHERED TO.<br />
9.0 As per tender conditions, the Electric Power shall be given at on mutually agreed point;<br />
further distribution will have to be carried out by the contractor as per their<br />
requirements at their cost. Necessary connection and consumption charges will be<br />
recovered as per GETCO’s tariff/rate from time to time, as per GETCO’s rules.<br />
10.0 The contractor’s rates should be firm and no variation clause is to be quoted by the<br />
contractor’s and GETCO will not accept the same, during contractual period including<br />
extended time limit if any.<br />
11.0 THE GETCO WILL NOT PAY ANY TYPE OF ADVANCES INCLUDING<br />
MOBILISATION ADVANCE.<br />
EXECUTIVE ENGINEER (CONST.)<br />
CONSTRUCTION DIVISION<br />
ANJAR.
Page14<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DIVISION, ANJAR (KUTCH)<br />
Special Condition for use of Cement and steel in work:<br />
1. The Rates in Schedule “B” is inclusive of Cement Cost. Contractor has to<br />
Purchase Fresh 43/53 grade & PPC Cement Confirming to as per IS 8112<br />
and approved brand by GETCO.<br />
2. Contractor has to construct “Pucca Godown” at site of the work so that Cement bags<br />
can be properly preserved to avoid damage due to any kind of Water.<br />
3. Contractor has to bring sufficient Quantities of Cement Bags and at No time less<br />
then 200 (Two Hundred) bags to maintain progress of work. The work should not<br />
suffer for want of Cement.<br />
4. Cement should give the required strength of Cement Concrete.<br />
5. To bring sufficient and timely Cement at site is full responsibility of Contractor.<br />
Nothing extra will be paid on account of any reason to maintain progress of work<br />
and to complete the work in schedule time.<br />
6. Contractor has to submit material A/C for consumption of Cement used with every<br />
bill. In case of not submitting the same, bill will not be passed. Contractor has to<br />
submit the copy of Cement Purchase Bill along with Each R.A. Bill / Final bill.<br />
7. No negative variation will be allowed for consumption in Cement then prescribed as<br />
per Booklet of Technical Specification of <strong>Board</strong> / Mix Design and nothing will be<br />
paid extra for over consumption.<br />
8. Contractor is fully responsible for safety of Cement at site; nothing will be paid<br />
extra on account of safety.<br />
9. If <strong>Board</strong>’s authorized representative wants to check cement stock at site, contractor<br />
has to allow for the same at any time.<br />
10. Contractor has to maintain day-to-day cement consumption / balance account at site.<br />
11. As for as possible, Contractor has to maintain supply of cement of only one brand &<br />
grade through out the work and on account of closer / shortage of approved brand,<br />
cement of other brand in accordance of condition no (1) will be allowed by<br />
Engineer-in-charge.<br />
12. Minimum Cement consumption considered for Cement Concreting having Grade of<br />
M-15 / M-20 / M-25 is 300 Kgs / 320 Kgs / 340 Kgs. Respectively. Contractor has<br />
to use minimum Cement as above. Contractor should not use less than the prescribed<br />
quantities of Cement even in the case of Mix-design recommends lower quantity.<br />
13. Contractor will be allowed to carry out work only after Physical Verification of<br />
Cement brought at site.<br />
EXECUTIVE ENGINEER (CONST.)<br />
CONSTRUCTION DIVISION<br />
ANJAR.
Page15<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DIVISION, ANJAR (KUTCH)<br />
Cement and Steel of the following companies/ suppliers who are the manufacturing for<br />
supplying are to be provided by Contractor:-<br />
Name of Manufacturer of Cement<br />
Name of Manufacturer/supplier of<br />
structural steel/coils/bars etc.<br />
Narmada Cement company Ltd.<br />
<strong>Gujarat</strong> Ambuja Cement Co. Ltd.<br />
Saurashtra Cement.<br />
Siddhi Cement.<br />
J.K Cement.<br />
Ultratech Cement.<br />
Shri Digvijay Cement Co. Ltd.<br />
Binani Cement.<br />
Vikram Cement.<br />
Sanghi Cement.<br />
Steel Authority Of India.<br />
Tata Iron & Steel Co. Ltd.<br />
Jindal.<br />
Lloyds.<br />
Essar Steel Ltd.<br />
Ispat.<br />
Bhawalka Steel Ind. Ltd. Mumbai<br />
Sun Vijay Rolling & Engineer, N,pur<br />
Shri Bajranga Alloys, Ltd. Raipur<br />
Unique Structures and Towers Ltd.<br />
Shah Alloys Ltd. Ahmedabad<br />
Sanghi Steel<br />
Neelkanth Steel (Kamdhenu)<br />
Wellspun Steel.<br />
EXECUTIVE ENGINEER (CONST.)<br />
CONSTRUCTION DIVISION<br />
ANJAR
Page16<br />
GRAM: TRANSGRID Phone No.(02836) 245784<br />
Fax No.(02836) 241588<br />
CONSTRUCTION DIVISION OFFICE,<br />
220KV COMPOUND S/S ANJAR,<br />
ANJAR - KUTCH – 370 110.<br />
E - Mail:- eeconstanj@yahoo.co.in<br />
price B I D<br />
NAME OF WORK:<br />
Construction of Revetment wall for protection of 220 kV tower<br />
foundation at Loc. No. 03, 41, 47 & 53 of 220 kV Nanikhakhar –<br />
Shivlakha line LILO at 220 kV Kukma s/s.
Page17<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DIVISION, ANJAR (KUTCH)<br />
NOTES FOR SCHEDULE: „B‟<br />
All the columns in schedule should be filled in INK.<br />
1) Rate quoted include clearance of site prior to commencement of work and after<br />
completion of work in all respects and hold good for work under all conditions site,<br />
moisture, weather etc.<br />
2) The quantities given in Schedule “B” are approximate. It may very at the time of<br />
execution and contractor shall have to execute the work as per approved drawings<br />
given at the time of execution.<br />
3) Certain changes may be incorporated during construction and as a result, there may<br />
be increase in the above stated quantities. In such an event, it should be noted that<br />
the contractor should not claim anything extra. These will be paid on the basis of<br />
actual quantities executed.<br />
4) The percentage rate shall be quoted both in the words and figures. Should there be<br />
any discrepancy between the rate quoted in words and figures, rate quoted in words<br />
shall prevail.<br />
5) Further, should there by any discrepancy between the rate and amount, the rate will<br />
prevail.<br />
SIGNATURE: -<br />
NAME: -<br />
STATUS: -<br />
Whether authorized Attorney<br />
Of the Tendering Company<br />
Name of the Tender Company
Page18<br />
GUJARAT ENERGY TRANSMISSION CORPN. LTD.<br />
ANJAR CIVIL SUB DIVISION.<br />
Sr.<br />
No.<br />
NAME O NAME OF WORK: Civil work for Dayapar feeder bay at 66 kV<br />
switch yard of KLTPS, Panandhro.<br />
"SCHEDULE-B"<br />
DESCRIPTION QTY. UNIT RATE AMOUNT<br />
1 Excavation for foundation up to 1.5m depth<br />
including strutting, shoring wherever<br />
necessary & refilling the side of the<br />
trenches, sorting out and stacking of useful<br />
materials and disposing of the surplus stuff<br />
up to 200meter lead.(A) DENSE SOIL (<br />
SOR SR NO 1 , ITEM NO 0.0 ( B ))<br />
2 Filling in plinth/trenches with earth in<br />
150mm, thick layers including water,<br />
ramming, consolidating etc., complete as<br />
directed by EIC. - yellow earth/murrum of<br />
approved quality brought from out side.(<br />
SOR SR NO 8 , ITEM NO 0.0 )<br />
3 Providing and laying cement concrete 1::3:6<br />
(1 Cement : 3Course sand : 6 black crushed<br />
stone aggregate 40mm nominal size ) and<br />
curing complete- Foundation and plinth. (<br />
SOR SR NO 3 , ITEM NO 5.3.2 )<br />
4 Providing & laying control cement concrete<br />
M-20 as per mix design exposed work with<br />
curing etc. complete excluding the cost of<br />
ply wood / steel sheathing form work &<br />
adjustable tubular steel supports / Props.but<br />
excluding the cost of reinforcement.<br />
G.F+F.F+Stair Cabin Columns and coping.<br />
( SOR SR NO 33 , ITEM NO 0.0 ( B - 2 ) )<br />
5 Providing block masonary in foundation and<br />
up to plinth in C.M. (1:6) including racking<br />
out joint up to 12mm depth<br />
,scaffolding,curing,filling up the gapa<br />
between the joints complete as directed by<br />
EIC., upto plinth (SOR SR.No.45,Item<br />
No.12.7.75)<br />
6 Providing Thermo Mechanically treated bars<br />
(TMT bars) confirmed to IS 1786 FE 415 for<br />
RCC work including bending, binding and<br />
placing in position etc. complete for RCC<br />
work.( SOR SR NO 14 A , ITEM NO 5.4.11<br />
( a ) )<br />
30.00 Cmt 60.00 1800.00<br />
225.00 Cmt 226.00 50850.00<br />
4.00 Cmt 2069.00 8276.00<br />
25.00 Cmt 5805.00 145125.00<br />
25.00 Cmt 2315.00 57875.00<br />
1000.00 Kg 51.00 51000.00
Page19<br />
7 Providing and laying Rubble soling 225mm<br />
thk using required stone in required slope<br />
and alignment with all tools, tackles,<br />
equipment and labour. Including filling the<br />
interstices with stone chips and SAND,<br />
including flooding with water and<br />
compacting by rammer or compactor as per<br />
the requirement and site conditions etc.<br />
complete as directed by the site-in-charge &<br />
Providing cement pointing on jionts of<br />
rubble piching in CM 1:1 curing etc.<br />
complete as directed by EIC.( AS PER<br />
NEW 66 KV APPROVED ESTIMATE )<br />
8 Providing form work of steel / ply wood<br />
planking so as to give a smooth exposed<br />
finish including centering (steel adjustable<br />
tubular supports). Shuttering strutting and<br />
propping etc. for any height of propping<br />
and centering below supporting floor to<br />
ceiling , and removal of the same for<br />
reinforced concrete and plain concrete. for<br />
footing,teowall,column beams etc for all<br />
floors.( SOR SR NO 1 , ITEM NO 9.1 ( C )<br />
9 Providing & Laying TMT (Thermo Mechanically<br />
Treated) reinforcement bars confirming to Fe-<br />
415-IS-1786 including cutting, bending, hooking<br />
and binding the reinforcement with approved<br />
quality of binding wire etc. compl. As per design<br />
(Providing chairs and supports etc., will be paid<br />
for under the item) and as directed by EIC etc.<br />
complete. SOR PG NO 26, SR NO 14-A, ITEM<br />
NO 5.4.11 ( A )<br />
10 Precast concrete block masonry (including<br />
quoin blocks Jamb blocks, closer etc.) with solid<br />
concrete blocks of approved size made of<br />
cement concrete 1:3:6 mix (1 Cement : 3<br />
Coarse sand : 6 graded stone aggregate of<br />
20mm and down gauge) in foundation and<br />
plinth in cement mortar (1:4) 1 Cement : 4<br />
Coarse Sand. SOR PG NO 45, SR NO 12,<br />
ITEM NO 7.75<br />
11 Providing 15 mm. thick cement plaster in C.M.<br />
(1:3) including finishing the surfaces with<br />
smooth cement finishing, necessary drip<br />
molding, scaffolding, curing etc., for block<br />
masonry before starting plaster cement duo<br />
(Cement slurry should be applied on the block<br />
surface.) SOR PG NO 76 ITEM NO 2.17.60( I )<br />
12 Steel work welded in built up section framed<br />
work including cutting, hoisting, fixing in position<br />
and applying priming coat of red lead paint for<br />
M.S. Angles, channels girders etc., for purling,<br />
rafters, columns etc., including welding the<br />
section as per instruction & drawing making<br />
holes & 3 coats of oil painting of approved<br />
shade & make etc., complete. (ALL<br />
MATERIALS SHALL BE BROUGHT BY THE<br />
CONTRACTOR.) SOR PG NO 57, SR NO 2,<br />
ITEM NO 11.4 ( A )<br />
265.00 Smt 120.00 31800.00<br />
70 Smt 112 7840<br />
0.70 MT 40210.00 28147.00<br />
2.50 CMT 2315.00 5787.50<br />
25.00 SMT 78.00 1950.00<br />
30.00 KG 64.00 1920.00
Page20<br />
13 Providing and placing 50 mm thick & 300 mm<br />
vide pre stressed concrete cover ( For clear<br />
span up to 1.20 mtr) in proportion 1:1 1/2:3 or<br />
M - 20 with reinforcement of 4 mm dia. HT steel<br />
wire 4 nos. bars and 6 mm dia. distribution bars<br />
at 150 mm c/c as per drawing & design<br />
including providing necessary M.S. hook for<br />
lifting arrangement & vibrating, finishing the<br />
surfaces, curing by placing in water pond for 10<br />
days, lifting arrangement etc. complete as<br />
directed by Engineer in charge including<br />
loading- unloading , transportation, placing,<br />
stacking etc. complete. As per new 66Kv s/s<br />
A/T<br />
14 Supplying of crushed stone aggregate hard<br />
stone of 25 to 40 mm size free of disintegrated.<br />
{SOR P. No: 115, 125 & 217, I. No: 12.26.70 +<br />
64.0.0 + 3.2.1(B)(AL-4)}<br />
15 Fabrication, cutting, threading including hot dip<br />
galvanizing including supply of MS rods of<br />
appropriate size for foundation bolts with two<br />
nos. of Nuts for each foundation bolts as per<br />
drawings/instructions of EIC. As per new 66 kV<br />
s/s A/T.<br />
10.00 SMT 403.00 4030.00<br />
15.00 Cmt. 789.00 11835.00<br />
150.00 Kg 79.00 11850.00<br />
Total Amount Rs. 1,89,327.50<br />
{ Rupees One Lac Eighty Nine Thousand Three Hundred Twenty Seven and Fifty Paisa Only}<br />
Service Tax as applicable. The service tax will be reimbursed to party on production<br />
of proof of payment to the appropriate authority.<br />
Ex. Engineer(Const.)<br />
GETCO, ANJAR<br />
I/We am/are willing to carry out the above work at ____ % above/below the<br />
estimated cost and amount works out at Rs.____________________<br />
Signature of the Contractor with seal
Page21<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DN. ANJAR: KACHCHH<br />
SCHEDULE: „C‟<br />
Schedule of Bidder Experience (To be filled in and signed by the Bidder)<br />
The Bidder shall furnish here a list of Similar Jobs Executed by him to whom a reference may<br />
be made by the <strong>Board</strong> in case <strong>Board</strong> consider such a reference necessary.<br />
Sr.<br />
No.<br />
Name & Description of<br />
Work<br />
Value of<br />
Work<br />
Period of<br />
Construction<br />
& Date<br />
Client<br />
Remarks<br />
1 2 3 4 5 6<br />
SIGNATURE: -<br />
NAME: -<br />
STATUS: -<br />
Place:<br />
Whether authorized Attorney<br />
Of the Bidding Company<br />
Date:<br />
Name of the Bidding Company
Page22<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DN. ANJAR: KACHCHH<br />
SCHEDULE: „D‟<br />
Schedule of Deviation from Technical Specification<br />
(To be filled in and signed by the Bidder)<br />
All Deviation from the Specification shall be filled in by the Bidder Clause by Clause<br />
In this Schedule.<br />
Sr. Section Specification Clause No Deviations<br />
No.<br />
1 2 3 4 5<br />
The Bidder hereby Certified that the above mentioned are the Only Deviations from the<br />
Technical Specification of the Inquiry.<br />
SIGNATURE: -<br />
NAME: -<br />
STATUS: -<br />
Place:<br />
Date:<br />
Whether authorized Attorney<br />
Of the Bidding Company<br />
Name of the Bidding Company
Page23<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DN. ANJAR: KACHCHH<br />
SCHEDULE: „E‟<br />
Schedule of Deviation from General Specification<br />
(To be filled in and signed by the Bidder)<br />
All Deviation from the General Conditions shall be filled in by the Bidder Clause by Clause in<br />
this Schedule.<br />
Sr. Section Specification Clause No Deviations<br />
No.<br />
1 2 3 4 5<br />
The Bidder hereby Certified that the above mentioned are the Only Deviations from the<br />
General Conditions of the Inquiry and Tender and Contract for Works.<br />
SIGNATURE: -<br />
NAME: -<br />
STATUS: -<br />
Place:<br />
Date:<br />
Whether authorized Attorney<br />
Of the Bidding Company<br />
Name of the Bidding Company
Page24<br />
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.<br />
CONSTRUCTION DN. ANJAR: KACHCHH<br />
SCHEDULE: „F‟<br />
Schedule of Equipments (To be filled in and signed by the Bidder)<br />
The Bidder Shall Indicate herein below the Equipments, He has in Possession and Equipments<br />
He proposed to bring to the Site, in case the Work is awarded to Him.<br />
Sr. Type & Description of Numbers the Bidder Number He Proposed to<br />
No. the Equipment has in Possession Bring on to Side<br />
1 2 3 4<br />
The Bidder hereby confirms that the Quantity and Type of tools He will employ for<br />
Construction will not be less than these listed above, and agree to bring more equipment, if so<br />
required, in the Opinion of the Engineer-In-Charge.<br />
SIGNATURE: -<br />
NAME: -<br />
STATUS: -<br />
Place:<br />
Date:<br />
Whether authorized Attorney<br />
Of the Bidding Company<br />
Name of the Bidding Company.