31.12.2013 Views

REDUCTION OF FLOOD RISK IN ULAANBAATAR CITY - GFDRR

REDUCTION OF FLOOD RISK IN ULAANBAATAR CITY - GFDRR

REDUCTION OF FLOOD RISK IN ULAANBAATAR CITY - GFDRR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Since 2012, 9 protected infrastructure for flood risk:<br />

‣ 25 km protected infrastructures rebuilt<br />

‣ 23 km rehabilitated<br />

• The forward planning until 2018:<br />

‣ 40% of rehabilitated construction<br />

‣ 60% construction of new infrastructures and buildings.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!