REDUCTION OF FLOOD RISK IN ULAANBAATAR CITY - GFDRR
REDUCTION OF FLOOD RISK IN ULAANBAATAR CITY - GFDRR
REDUCTION OF FLOOD RISK IN ULAANBAATAR CITY - GFDRR
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
• Since 2012, 9 protected infrastructure for flood risk:<br />
‣ 25 km protected infrastructures rebuilt<br />
‣ 23 km rehabilitated<br />
• The forward planning until 2018:<br />
‣ 40% of rehabilitated construction<br />
‣ 60% construction of new infrastructures and buildings.