APPENDIX B<br />

List of Typical Documentation for Capital Costs <strong>and</strong> Project Scope Provided by Grantee<br />

__________________________________________________________________________________<br />

Stage<br />

Entry into PE (or PD<br />

for Small Starts)<br />

Entry into Final<br />

Design<br />

Application for<br />

FFGA (or PCGA<br />

for Small Starts)<br />

Prior to Start of<br />

Revenue Service<br />

Document Name<br />

• Alternative Analysis Report<br />

• Draft NEPA Documents (Environmental Impact Statement (EIS), Environmental<br />

Assessment (EA), or Categorical Exclusion (CE)<br />

• Technical Memor<strong>and</strong>a, Engineering Design Reports , Facilities Design Reports<br />

• Concept Design Drawings<br />

• Cost estimate in original <strong>and</strong> SCC format; Capital Cost Methodology Report<br />

• Project Schedule<br />

• PE Grant application<br />

• Draft <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Plan (Recommended)<br />

• Final NEPA Documents (Environmental Impact Statement (EIS), Environmental<br />

Assessment (EA), or Categorical Exclusion (Catex)<br />

• Record of Decision (ROD), Finding of No Significant Impact (FONSI)<br />

• Annual New Starts Update – Volume 1: New Starts Data<br />

• PE Drawings, Specifications<br />

• Basis of Design Report, Utilities Report, Permitting Report<br />

• Real Estate Acquisition Plan<br />

• Cost estimate in original <strong>and</strong> SCC format; Capital Cost Methodology Report<br />

• Project Schedule<br />

• FD Grant Application<br />

• Analysis of Changes Since Last Milestone (Required)<br />

• Draft <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Plan (Recommended)<br />

• Interim <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Report (Recommended)<br />

• FD Drawings, Specifications<br />

• Basis of Design Report, Utilities Report, Permitting Report<br />

• Real Estate Acquisition Plan<br />

• Request for Bids or proposals; construction contracts <strong>and</strong> addenda<br />

• Letters of No Prejudice<br />

• Cost estimate in original <strong>and</strong> SCC format<br />

• Project Schedule<br />

• FFGA or PCGA application<br />

• Analysis of Changes Since Last Milestone (Required)<br />

• Final <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Plan (Required)<br />

• Interim <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Report (Recommended)<br />

• FFGA or PCGA Amendments (if any)<br />

• Construction documents; as-built drawings to the extent they are available<br />

• Cost breakdown in original <strong>and</strong> SCC format<br />

• Executed change orders; construction contract amendments; claims<br />

• Project Schedule <strong>and</strong> Construction Schedule Adjustment(s)<br />

• Analysis of Changes Since Last Milestone (Required)<br />

• Interim <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Report (Recommended)<br />

OP 27 <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> <strong>Review</strong>s<br />

Rev. 2, May 2010<br />