APPENDIX B<br />
List of Typical Documentation for Capital Costs <strong>and</strong> Project Scope Provided by Grantee<br />
__________________________________________________________________________________<br />
Stage<br />
Entry into PE (or PD<br />
for Small Starts)<br />
Entry into Final<br />
Design<br />
Application for<br />
FFGA (or PCGA<br />
for Small Starts)<br />
Prior to Start of<br />
Revenue Service<br />
Document Name<br />
• Alternative Analysis Report<br />
• Draft NEPA Documents (Environmental Impact Statement (EIS), Environmental<br />
Assessment (EA), or Categorical Exclusion (CE)<br />
• Technical Memor<strong>and</strong>a, Engineering Design Reports , Facilities Design Reports<br />
• Concept Design Drawings<br />
• Cost estimate in original <strong>and</strong> SCC format; Capital Cost Methodology Report<br />
• Project Schedule<br />
• PE Grant application<br />
• Draft <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Plan (Recommended)<br />
• Final NEPA Documents (Environmental Impact Statement (EIS), Environmental<br />
Assessment (EA), or Categorical Exclusion (Catex)<br />
• Record of Decision (ROD), Finding of No Significant Impact (FONSI)<br />
• Annual New Starts Update – Volume 1: New Starts Data<br />
• PE Drawings, Specifications<br />
• Basis of Design Report, Utilities Report, Permitting Report<br />
• Real Estate Acquisition Plan<br />
• Cost estimate in original <strong>and</strong> SCC format; Capital Cost Methodology Report<br />
• Project Schedule<br />
• FD Grant Application<br />
• Analysis of Changes Since Last Milestone (Required)<br />
• Draft <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Plan (Recommended)<br />
• Interim <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Report (Recommended)<br />
• FD Drawings, Specifications<br />
• Basis of Design Report, Utilities Report, Permitting Report<br />
• Real Estate Acquisition Plan<br />
• Request for Bids or proposals; construction contracts <strong>and</strong> addenda<br />
• Letters of No Prejudice<br />
• Cost estimate in original <strong>and</strong> SCC format<br />
• Project Schedule<br />
• FFGA or PCGA application<br />
• Analysis of Changes Since Last Milestone (Required)<br />
• Final <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Plan (Required)<br />
• Interim <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Report (Recommended)<br />
• FFGA or PCGA Amendments (if any)<br />
• Construction documents; as-built drawings to the extent they are available<br />
• Cost breakdown in original <strong>and</strong> SCC format<br />
• Executed change orders; construction contract amendments; claims<br />
• Project Schedule <strong>and</strong> Construction Schedule Adjustment(s)<br />
• Analysis of Changes Since Last Milestone (Required)<br />
• Interim <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Report (Recommended)<br />
OP 27 <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> <strong>Review</strong>s<br />
Rev. 2, May 2010<br />
Page B-1