DSR Items<br />

NAME OF PROJECT: RENOVATION AT OLD CMS BUILDING CONVERTED TO NURSES TRAINING SCHOOL AT SEALDAH, KOLKATA<br />

SL.No. Schedule/ DESCRIPTION OF WORK UNIT QTY RATE AMOUNT<br />

1 15.56<br />

P-231<br />

Dismantling old plaster or skirting raking out joints & cleaning the surface for plaster including<br />

disposal of rubbish to the dumping ground within 50 meters lead<br />

m 2 4855.54 8.2<br />

39815.43<br />

2 13.5<br />

P-201 15 mm cement plaster on rough side of single or half brick wall of mix:<br />

13.5.2 1:6 (1 cement : 6 Course Sand) m 2 4915.54 84.55 415608.91<br />

3 14.43<br />

P-219<br />

Removing white or colour wash by scrapping & sand papering the surface smooth including<br />

necessary repairs to scratches etc. complete.<br />

m 2 383.55 3.2<br />

1227.36<br />

4 13.37 White washing with lime to give an even shade<br />

P-204<br />

13.37.1 New work (Three or more coats) m 2 4187.79 6.75 28267.58<br />

5 13.47.1<br />

P-205<br />

Finishing wall with Premium Acrylic Smooth exterior paint with Silicone additives of required<br />

shade New work (two or more coat applied@ 1.43 ltr/10 sq mm) over & including base coat of<br />

water proofing cement paint applied<br />

@ 2.20 kg/10 sq mm<br />

m 2 1196.3 60.1<br />

71897.63<br />

6 6.4<br />

P-99<br />

Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto<br />

floor V level in all shapes & all sizes<br />

6.4.1 Cement mortar 1:4 (1 Cement : 4 Course Sand) m 3 19.02 2529.05 48102.53<br />

7 2.6<br />

P-64<br />

Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over<br />

areas (excluding 30 cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposa<br />

of excavated earth, lead upto 50 m & lift upto 1.5 m, disposed earth to be levelled& neatly<br />

dressed.<br />

2.6.1 All kinds of soil m 3 17.18 101.85 1749.78<br />

8 16.12<br />

P-241<br />

Dry brick pitching half brick thick in drains including supply of bricks & preparing the surface<br />

complete :16.12.1 With FPS bricks of class designation 75<br />

m 3 7.31 183.55<br />

1341.75<br />

9 4.1<br />

P-79<br />

Providing & laying in position cement concrete of specified grade excluding the cost of cement<br />

& shuttering. All work upto plinth level<br />

4.1.3 1:2:4 ( 1 cement : 2 Course Sand : 4 graded stone aggregate 20 mm nominal size m 3 1.1 3257.45 3583.20<br />

10 5.1<br />

P-88<br />

Providing & laying in position specified grade of reinforced cement concrete excluding the cos<br />

of centering, shuttering, finishing & reinforcement - All work upto plinth level<br />

5.1.3 1:2:4 (1 cement:2 Coarse Sand: 4 grades stone aggregate<br />

20 mm nominal size)<br />

m 3 1.4 3359.6<br />