SPECIAL PROVISIONS<br />
Project No. C-28(492)<br />
SUBGRADE PREPARATION<br />
This work shall be completed in accordance with the Plans and Section 202 of the Standard<br />
Specifications with the following exception: Subgrade preparation shall not be a direct pay item, but<br />
shall be subsidiary to items for which direct payment is made.<br />
The Contractor shall inspect all dikes after each rainfall event of at least 0.5 inches or greater. Any<br />
deficiencies or damage shall be repaired by the Contractor. Accumulated silt or debris shall be<br />
removed and relocated as directed by the Engineer. If the dikes are damaged or inadvertently moved<br />
during the silt removal process, the contractor shall immediately replace the damaged dikes.<br />
Method of Measurement and Payment<br />
The dikes shall be measured in Linear Feet placed and accepted for payment by the item ‘Triangular<br />
Silt Dike.’ Unit price bid shall include the cost of furnishing the dikes, installation, maintenance and<br />
removal as directed by the Engineer.<br />
18" HDPE PIPE<br />
This work shall consist of the furnishing and installing of 18" HDPE Pipe at the lines and grades<br />
shown in the Plans or as directed by the Engineer. This work shall be accomplished in accordance<br />
with Section 701 of the Standard Specifications. The HDPE Pipe used shall also meet the material<br />
requirements listed in Section 1038 of the Nebraska Department of Roads Standard Specifications<br />
for Highway Construction, 2007 Edition.<br />
Measurement and Payment<br />
Payment shall be made at the contract unit price per linear feet (LF) for the item “18" HDPE Pipe”.<br />
This price shall be full compensation for furnishing, hauling, and placing the culvert pipe and for all<br />
equipment, tools, labor and incidentals necessary to complete the work.<br />
18" FLARED END SECTION<br />
This work shall conform with Section 701 of the Standard Specifications, with the following<br />
exception: The Flared End Section used for this work shall be of metal construction and<br />
manufactured specifically for use with HDPE pipe.<br />
TEMPORARY 18" CULVERT PIPE<br />
Description<br />
This work shall consist of the construction, maintenance, and removal of 18" Culvert Pipe at the<br />
lines and grades shown in the Plans or as directed by the Engineer. The type of culvert pipe utilized<br />
can be any of the types 1 through 7 accepted for these conditions according to the Nebraska<br />
Department of Roads Pipe Material Policy. Previously used pipe may be utilized if approved by the<br />
Engineer.<br />
Measurement and Payment<br />
Payment shall be made at the contract unit price per linear feet (LF) for the item “Temporary 18"<br />
Culvert Pipe”. This price shall be full compensation for furnishing, hauling, placing, maintaining,<br />
and removal of the culvert pipe and for all equipment, tools, labor and incidentals necessary to<br />
complete the work.<br />
SP - 6