SPECIAL PROVISIONS<br />

Project No. C-28(492)<br />

SUBGRADE PREPARATION<br />

This work shall be completed in accordance with the Plans and Section 202 of the Standard<br />

Specifications with the following exception: Subgrade preparation shall not be a direct pay item, but<br />

shall be subsidiary to items for which direct payment is made.<br />

The Contractor shall inspect all dikes after each rainfall event of at least 0.5 inches or greater. Any<br />

deficiencies or damage shall be repaired by the Contractor. Accumulated silt or debris shall be<br />

removed and relocated as directed by the Engineer. If the dikes are damaged or inadvertently moved<br />

during the silt removal process, the contractor shall immediately replace the damaged dikes.<br />

Method of Measurement and Payment<br />

The dikes shall be measured in Linear Feet placed and accepted for payment by the item ‘Triangular<br />

Silt Dike.’ Unit price bid shall include the cost of furnishing the dikes, installation, maintenance and<br />

removal as directed by the Engineer.<br />

18" HDPE PIPE<br />

This work shall consist of the furnishing and installing of 18" HDPE Pipe at the lines and grades<br />

shown in the Plans or as directed by the Engineer. This work shall be accomplished in accordance<br />

with Section 701 of the Standard Specifications. The HDPE Pipe used shall also meet the material<br />

requirements listed in Section 1038 of the Nebraska Department of Roads Standard Specifications<br />

for Highway Construction, 2007 Edition.<br />

Measurement and Payment<br />

Payment shall be made at the contract unit price per linear feet (LF) for the item “18" HDPE Pipe”.<br />

This price shall be full compensation for furnishing, hauling, and placing the culvert pipe and for all<br />

equipment, tools, labor and incidentals necessary to complete the work.<br />

18" FLARED END SECTION<br />

This work shall conform with Section 701 of the Standard Specifications, with the following<br />

exception: The Flared End Section used for this work shall be of metal construction and<br />

manufactured specifically for use with HDPE pipe.<br />

TEMPORARY 18" CULVERT PIPE<br />

Description<br />

This work shall consist of the construction, maintenance, and removal of 18" Culvert Pipe at the<br />

lines and grades shown in the Plans or as directed by the Engineer. The type of culvert pipe utilized<br />

can be any of the types 1 through 7 accepted for these conditions according to the Nebraska<br />

Department of Roads Pipe Material Policy. Previously used pipe may be utilized if approved by the<br />

Engineer.<br />

Measurement and Payment<br />

Payment shall be made at the contract unit price per linear feet (LF) for the item “Temporary 18"<br />

Culvert Pipe”. This price shall be full compensation for furnishing, hauling, placing, maintaining,<br />

and removal of the culvert pipe and for all equipment, tools, labor and incidentals necessary to<br />

complete the work.<br />