Figure 15-18 Cambridge West Environmental Setbacks ...

Figure 15-18 Cambridge West Environmental Setbacks ... Figure 15-18 Cambridge West Environmental Setbacks ...

30.12.2013 Views

BLENHEIM ROAD LAIR ROAD L:\projects\3308CambridgeWest\Maps\Figures_June2013\CambridgeWest_EnvironmentalSetbacksFig15_Oct2013.mxd 2013\10\03 GRAND RIVER Legend WESTCLIFF WAY ROSSLINN ROAD Development Study Area General Study Area Blair-Bechtel-Cruickston Environmentally Significant Landscape Survey Lines Dripline Wetland Approximate Dripline (not Surveyed) Approximate Wetland (not Surveyed) Recommended Setbacks and Linkages Linkage (approximate) Approximate Dripline +15m Approximate Wetland +50m Recommended Setbacks and Linkages - DSA PSW Marsh/Pond: 50m PSW Treed Swamp: 30m Woodland:15m Hedgerow: 5m Recommended Setbacks and Linkages - GSA PSW/Pond: 50m PSW Treed Swamp 30m Woodland: 15m Note: all recommended setbacks and linkages are voluntary, pending landowner participation BISMARK DRIVE ROSEVILLE ROAD Barrie's Lake Cambridge West MESP Environmental Setbacks 2012 Ortho Image, City of Cambridge 0 50 100 metres 1:6,000 ¯ Date: August 2013 Project No: 333308 Figure No: 15

BLENHEIM ROAD<br />

LAIR ROAD<br />

L:\projects\3308<strong>Cambridge</strong><strong>West</strong>\Maps\<strong>Figure</strong>s_June2013\<strong>Cambridge</strong><strong>West</strong>_<strong>Environmental</strong><strong>Setbacks</strong>Fig<strong>15</strong>_Oct2013.mxd 2013\10\03<br />

GRAND RIVER<br />

Legend<br />

WESTCLIFF WAY<br />

ROSSLINN ROAD<br />

Development Study Area<br />

General Study Area<br />

Blair-Bechtel-Cruickston <strong>Environmental</strong>ly<br />

Significant Landscape<br />

Survey Lines<br />

Dripline<br />

Wetland<br />

Approximate Dripline (not Surveyed)<br />

Approximate Wetland (not Surveyed)<br />

Recommended <strong>Setbacks</strong> and Linkages<br />

Linkage (approximate)<br />

Approximate Dripline +<strong>15</strong>m<br />

Approximate Wetland +50m<br />

Recommended <strong>Setbacks</strong> and Linkages - DSA<br />

PSW Marsh/Pond: 50m<br />

PSW Treed Swamp: 30m<br />

Woodland:<strong>15</strong>m<br />

Hedgerow: 5m<br />

Recommended <strong>Setbacks</strong> and Linkages - GSA<br />

PSW/Pond: 50m<br />

PSW Treed Swamp 30m<br />

Woodland: <strong>15</strong>m<br />

Note: all recommended setbacks and linkages<br />

are voluntary, pending landowner participation<br />

BISMARK DRIVE<br />

ROSEVILLE ROAD<br />

Barrie's<br />

Lake<br />

<strong>Cambridge</strong> <strong>West</strong> MESP<br />

<strong>Environmental</strong> <strong>Setbacks</strong><br />

2012 Ortho Image, City of <strong>Cambridge</strong><br />

0 50 100<br />

metres<br />

1:6,000<br />

¯<br />

Date: August 2013<br />

Project No: 333308<br />

<strong>Figure</strong> No:<br />

<strong>15</strong>


Daily Traffic Volume<br />

16000<br />

Available Reserve Capacity<br />

14000<br />

12000<br />

Estimated Site Traffic at Full Buildout<br />

Projected Background Traffic Volume Increaseto 2031<br />

Existing Traffic Volumes<br />

10000<br />

8000<br />

6000<br />

4000<br />

2000<br />

0<br />

Blenheim Road Newman Drive Bismark Drive Blair Road Roseville Road<br />

Street<br />

<strong>Figure</strong> 16<br />

Available Capacity on Adjacent Road Network<br />

2031 Horizon with Full Buildout of <strong>Cambridge</strong> <strong>West</strong> Lands


Legend<br />

Proposed Collector Road<br />

Development Study Area<br />

Municipal Boundary<br />

<strong>Figure</strong> 17<br />

CAMBRIDGE WEST<br />

MASTER ENVIRONMENTAL<br />

SERVICING PLAN<br />

TRANSPORTATION NETWORK<br />

POTENTIAL EXTERNAL CONNECTIONS<br />

Scale 1:12,500<br />

0<br />

100 250 500<br />

metres<br />

Sources:<br />

Air Photo - City of <strong>Cambridge</strong>, 2012 and 2006<br />

Study Area - City of <strong>Cambridge</strong><br />

K:\0800A-CAMBRIDGE WEST COMMUNITY\RPT\SEPTEMBER30 2013 FIGURES\COLLECTOR ROAD OPTIONS.DWG


Legend<br />

Proposed Collector Road<br />

Development Study Area<br />

Municipal Boundary<br />

<strong>Figure</strong> <strong>18</strong><br />

CAMBRIDGE WEST<br />

MASTER ENVIRONMENTAL<br />

SERVICING PLAN<br />

TRANSPORTATION NETWORK<br />

OPTION 1<br />

Scale 1:7,500<br />

0<br />

50<br />

100 200 350<br />

metres<br />

Sources:<br />

Air Photo - City of <strong>Cambridge</strong>, 2012<br />

Study Area - City of <strong>Cambridge</strong><br />

K:\0800A-CAMBRIDGE WEST COMMUNITY\RPT\SEPTEMBER30 2013 FIGURES\EXISTING COLLECTOR ROAD OPTION.DWG

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!