<strong>DolWin3</strong><br />

162 kilometre grid connection<br />

for offshore wind energy<br />

The <strong>DolWin3</strong> project establishes a 900 MW grid connection<br />

for wind farms in the south-western part of the German North Sea.<br />

Facts and figures<br />

• Connection:<br />

162 km grid connection<br />

capacity 900 MW<br />

onshore: 79 km land cable<br />

offshore: 83 km sea cable<br />

Offshore AC/DC converter<br />

platform (DolWin gamma)<br />

• Grid coupling point:<br />

Dörpen West converter station<br />

• Project status:<br />

completion: 2017<br />

The <strong>DolWin3</strong> project is the third<br />

connection in the DolWin cluster.<br />

The distance from the wind farms<br />

to the coast is about 83 kilometres.<br />

Then the grid connection runs for<br />

another 79 kilometres across land<br />

to the converter station in Dörpen<br />

West, which will serve as the grid<br />

coupling point. Completion of<br />

construction in 2017.<br />

Our Offshore department<br />

On behalf of TenneT TSO, our affiliated<br />

company TenneT Offshore GmbH<br />

constructs and operates grid connections<br />

for offshore wind farms.<br />

TenneT Offshore performs the planning<br />

and construction of power connection<br />

at sea and up to the grid connection<br />

point. The projects mainly involve the<br />

following tasks for connecting offshore<br />

wind farms:<br />

• Development of technical concepts<br />

• Route planning and surveying<br />

• Carrying out the legal and nature<br />

conservation procedures<br />

• Tendering, awarding and executing<br />

grid connection projects


<strong>DolWin3</strong><br />

TenneT brings energy from sea to land<br />

Flensburg<br />

DolWin gamma<br />

12 km<br />

Brunsbüttel<br />

Büttel<br />

Borkum-<br />

Riffgrund I<br />

Norderney<br />

83 km<br />

Hagermarsch<br />

Inhausen<br />

Hamswehrum<br />

Conneforde<br />

Emden / Borßum<br />

79 km<br />

Diele<br />

converter station<br />

Dörpen West<br />

TenneT TSO GmbH<br />

Bernecker Straße 70<br />

95448 Bayreuth<br />

Telephone +49 921 50740-4094<br />

Fax +49 921 50740-4095<br />

E-mail offshore@tennet.eu<br />

Twitter@tennettso<br />

www.tennet.eu<br />

TenneT is Europe’s first cross-border grid operator. With approximately<br />

20,000 kilometres of extra-high voltage lines and 36 million<br />

end users in the Netherlands and Germany we rank among the<br />

top five grid operators in Europe. Our focus is to develop a northwest<br />

European energy market and to integrate renewable energy.<br />

Taking power further<br />

© TenneT<br />

No part of this publication may be<br />

reproduced or transmitted in any form<br />

or by any means without the explicit<br />

permission of TenneT.<br />

No rights may be derived from the contents<br />

of this document.<br />

CE2031MA.UK1302

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!