29.12.2013 Views

March 12, 2010 Mayor Carolyn McGee City of Dardanelle 116 N. 1st ...

March 12, 2010 Mayor Carolyn McGee City of Dardanelle 116 N. 1st ...

March 12, 2010 Mayor Carolyn McGee City of Dardanelle 116 N. 1st ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>March</strong> <strong>12</strong>, <strong>2010</strong><br />

<strong>Mayor</strong> <strong>Carolyn</strong> <strong>McGee</strong><br />

<strong>City</strong> <strong>of</strong> <strong>Dardanelle</strong><br />

<strong>116</strong> N. 1 st St.<br />

<strong>Dardanelle</strong>, AR 72834<br />

RE: Wastewater Treatment Plant Inspection<br />

AFIN: 75-00024<br />

NPDES Permit No.: AR0033421<br />

Dear <strong>Mayor</strong> <strong>McGee</strong>:<br />

On February 18, <strong>2010</strong>, I performed a routine compliance inspection <strong>of</strong> the waste water treatment<br />

facility in accordance with the provisions <strong>of</strong> the Federal Clean Water Act, the Arkansas Water and<br />

Air Pollution Control Act, and the regulations promulgated thereunder. This inspection revealed<br />

the following violations:<br />

TSS and BOD5 grab samples are not being stored at < 6 C prior to compositing. This is a violation <strong>of</strong> Part<br />

III, Section C. 3 <strong>of</strong> the permit. The facility collects three grab samples, one each hour, for 3-hour composite<br />

sampling. Mr. Parks states that he was told by the inspector to store these samples in an incubator at 20 C<br />

during the previous inspection. Mr. Parks reported that Standard methods required cooling to < 4 C. I<br />

reported that 40 CFR Part 136 requires cooling to < 6 C. Mr. Parks reported that the facility would start<br />

storing samples at < 4 C.<br />

The above items require your immediate attention. Please submit a written response to these<br />

findings to the Water Division Enforcement Branch <strong>of</strong> this Department at the following address:<br />

Water Division Enforcement Section<br />

Arkansas Department <strong>of</strong> Environmental Quality<br />

5301 Northshore Drive<br />

North Little Rock, AR 72118-5317<br />

This response should contain detailed documentation describing the course <strong>of</strong> action taken to<br />

correct the items noted. This corrective action should be completed as soon as possible, and the<br />

written response is due by <strong>March</strong> 26, <strong>2010</strong>.<br />

For additional information you may contact the enforcement branch by telephone at 501-682-0639<br />

or by fax at 501-682-0910.


<strong>Mayor</strong> <strong>Carolyn</strong> <strong>McGee</strong>, <strong>City</strong> <strong>of</strong> <strong>Dardanelle</strong><br />

<strong>March</strong> 1, <strong>2010</strong><br />

Page 2<br />

If I can be <strong>of</strong> any assistance, please contact me at 479-968-7339 extension 14.<br />

Sincerely,<br />

Travis Harmon<br />

District 5 Field Inspector<br />

Water Division<br />

harmont@adeq.state.ar.us<br />

cc:<br />

Water Division Enforcement Branch<br />

Water Division Permits Branch<br />

NPDES R eport Page 2


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

Form Approved<br />

OMB No. 2040-0003<br />

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY<br />

Washington, D.C. 20460<br />

NPDES Compliance Inspection Report<br />

Section A: National Data System Coding<br />

Transaction Code NPDES Yr/Mo/Day Inspec. Type Inspector Fac. Type<br />

1 N 2 5 3 A R 0 0 3 3 4 2 1 11 <strong>12</strong> 1 0 0 2 1 8 17 18 C 19 S 20 1<br />

A F I N 7 5 --- 0 0 0 2 4<br />

Remarks<br />

Inspection Work Days Facility Evaluation Rating BI QA -------------------------------Reserved------------------------------<br />

67<br />

0 0<br />

69 70 3 71 N 72 N 73 74 75 80<br />

Section B: Facility Data<br />

Name and Location <strong>of</strong> Facility Inspected (For industrial users discharging to POTW, also<br />

include POTW name and NPDES permit number)<br />

<strong>City</strong> <strong>of</strong> <strong>Dardanelle</strong><br />

10532 Water Plant Rd<br />

<strong>Dardanelle</strong>, AR 72834<br />

Name(s) <strong>of</strong> On-Site Representative(s)/Title(s)/Phone and Fax Number(s)<br />

H. Dale Parks/ Chief Operator/ 479-229-4538<br />

Entry Time/Date<br />

09:30/ 2/18/<strong>2010</strong><br />

Exit Time/Date<br />

1:30/ 2/18/<strong>2010</strong><br />

Permit Effective Date<br />

10/1/2009<br />

Permit Expiration Date<br />

9/30/2014<br />

Other Facility Data<br />

Name, Address <strong>of</strong> Responsible Official/Title/Phone and Fax Number<br />

<strong>Carolyn</strong> <strong>McGee</strong>/ <strong>Mayor</strong>/ 479-229-3992<br />

<strong>116</strong> N 1 st St<br />

<strong>Dardanelle</strong>, AR 72834<br />

Yesþ<br />

Contacted<br />

No¨<br />

Section C: Areas Evaluated During Inspection<br />

(S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated)<br />

S Permit S Flow Measurement S Operations & Maintenance M Sampling<br />

S Records/Reports S Self-Monitoring Program S Sludge Handling/Disposal N Pollution Prevention<br />

S Facility Site Review N Compliance Schedules N Pretreatment N Multimedia<br />

N Effluent/Receiving Waters S Laboratory N Storm Water N Other:<br />

Section D: Summary <strong>of</strong> Findings/Comments (Attach additional sheets if necessary)<br />

1. TSS and BOD5 grab samples are not being stored at < 6 C prior to compositing.<br />

2. TSS monthly load rates were under-reported. by 5-9 lb/day in the DMRs. The under-reported values do not affect<br />

compliance status with TSS limits. The highest calculated monthly TSS load was 43 lb/day and the facility limit is<br />

245 lb/day.<br />

3. FCB monthly average was over-reported in 09/2009 due to rounding <strong>of</strong> log values up to 2.<br />

Name(s) and Signature(s) <strong>of</strong> Inspector(s)<br />

Travis Harmon<br />

Agency/Office/Telephone/Fax<br />

Arkansas Department <strong>of</strong> Environmental Quality /<br />

Russellville / 479-968-7339 x 14 / 479-968-7321<br />

Date<br />

3/2/<strong>2010</strong><br />

Signature <strong>of</strong> Reviewer Agency/Office/Phone and Fax Numbers Date<br />

NPDES R eport Page 3


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

SECTION A: PERMIT VERIFICATION<br />

PERMIT SATISFACTORILY ADDRESSES OBSERVATIONS<br />

DETAILS:<br />

þS ¨M ¨U ¨NA ¨NE<br />

1. CORRECT NAME AND MAILING ADDRESS OF PERMITTEE: þY ¨N ¨NA ¨NE<br />

2. NOTIFICATION GIVEN TO EPA/STATE OF NEW DIFFERENT OR INCREASED DISCHARGES: ¨Y ¨N þNA ¨NE<br />

3. NUMBER AND LOCATION OF DISCHARGE POINTS AS DESCRIBED IN PERMIT: þY ¨N ¨NA ¨NE<br />

4. ALL DISCHARGES ARE PERMITTED: þY ¨N ¨NA ¨NE<br />

SECTION B: RECORDKEEPING AND REPORTING EVALUATION<br />

RECORDS AND REPORTS MAINTAINED AS REQUIRED BY PERMIT<br />

DETAILS:<br />

þS ¨M ¨U ¨NA ¨NE<br />

1. ANALYTICAL RESULTS CONSISTENT WITH DATA REPORTED ON DMRS: þY ¨N ¨NA ¨NE<br />

2. SAMPLING AND ANALYSES DATA ADEQUATE AND INCLUDE: ¨S ¨M ¨U ¨NA ¨NE<br />

a. DATES AND TIME(S) OF SAMPLING: þY ¨N ¨NA ¨NE<br />

b. EXACT LOCATION(S) OF SAMPLING: þY ¨N ¨NA ¨NE<br />

c. NAME OF INDIVIDUAL PERFORMING SAMPLING: þY ¨N ¨NA ¨NE<br />

d. ANALYTICAL METHODS AND TECHNIQUES: þY ¨N ¨NA ¨NE<br />

e. RESULTS OF CALIBRATIONS: þY ¨N ¨NA ¨NE<br />

f. RESULTS OF ANALYSES: þY ¨N ¨NA ¨NE<br />

g. DATES AND TIMES OF ANALYSES: þY ¨N ¨NA ¨NE<br />

h. NAME OF PERSON(S) PERFORMING ANALYSES: þY ¨N ¨NA ¨NE<br />

3. LABORATORY EQUIPMENT CALIBRATION AND MAINTENANCE RECORDS ADEQUATE: þS ¨M ¨U ¨NA ¨NE<br />

4. PLANT RECORDS INCLUDE SCHEDULES, DATES OF EQUIPMENT MAINTENANCE AND REPAIR: þS ¨M ¨U ¨NA ¨NE<br />

5. EFFLUENT LOADINGS CALCULATED USING DAILY EFFLUENT FLOW AND DAILY ANALYTICAL DATA: þY ¨N ¨NA ¨NE<br />

SECTION C: OPERATIONS AND MAINTENANCE<br />

TREATMENT FACILITY PROPERLY OPERATED AND MAINTAINED<br />

DETAILS:<br />

þS ¨M ¨U ¨NA ¨NE<br />

1. TREATMENT UNITS PROPERLY OPERATED: þS ¨M ¨U ¨NA ¨NE<br />

2. TREATMENT UNITS PROPERLY MAINTAINED: þS ¨M ¨U ¨NA ¨NE<br />

3. STANDBY POW ER OR OTHER EQUIVALENT PROVIDED: Generator on-site. þS ¨M ¨U ¨NA ¨NE<br />

4. ADEQUATE ALARM SYSTEM FOR POW ER OR EQUIPMENT FAILURES AVAILABLE: Guardtronic calls after 30 min power failure. þS ¨M ¨U ¨NA ¨NE<br />

5. ALL NEEDED TREATMENT UNITS IN SERVICE: þS ¨M ¨U ¨NA ¨NE<br />

6. ADEQUATE NUMBER OF QUALIFIED OPERATORS PROVIDED: Mr. Dale Parks (III) and Blake Robinson (I). þS ¨M ¨U ¨NA ¨NE<br />

7. SPARE PARTS AND SUPPLIES INVENTORY MAINTAINED: þS ¨M ¨U ¨NA ¨NE<br />

8. OPERATION AND MAINTENANCE MANUAL AVAILABLE: þY ¨N ¨NA ¨NE<br />

9. STANDARD OPERATING PROCEDURES AND SCHEDULES ESTABLISHED: þY ¨N ¨NA ¨NE<br />

10. PROCEDURES FOR EMERGENCY TREATMENT CONTROL ESTABLISHED: þY ¨N ¨NA ¨NE<br />

11. HAVE BYPASSES/OVERFLOWS OCCURRED AT THE PLANT OR IN THE COLLECTION SYSTEM IN THE LAST YEAR: Bar screen<br />

became clogged and overflowed. Some material on ground during inspection. Facility could not clean yet due to ice/snow cover. þY ¨N ¨NA ¨NE<br />

Facility now has written instructions in place for staff to check and/or clear bar screen.<br />

<strong>12</strong>. IF SO, HAS THE REGULATORY AGENCY BEEN NOTIFIED: Was contained at plant. ¨Y ¨N þNA ¨NE<br />

13. HAS CORRECTIVE ACTION BEEN TAKEN TO PREVENT ADDITIONAL BYPASSES/OVERFLOWS: þY ¨N ¨NA ¨NE<br />

14. HAVE ANY HYDRAULIC OVERLOADS OCCURRED AT THE TREATMENT PLANT: þY ¨N ¨NA ¨NE<br />

15. IF SO, DID PERMIT VIOLATIONS OCCUR AS A RESULT: ¨Y þN ¨NA ¨NE<br />

NPDES R eport Page 4


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

SECTION D: SAMPLING<br />

PERMITTEE SAMPLING MEETS PERMIT REQUIREMENTS<br />

DETAILS:<br />

¨S þM ¨U ¨NA ¨NE<br />

1. SAMPLES TAKEN AT SITE(S) SPECIFIED IN PERMIT: þY ¨N ¨NA ¨NE<br />

2. LOCATIONS ADEQUATE FOR REPRESENTATIVE SAMPLES: þY ¨N ¨NA ¨NE<br />

3. FLOW PROPORTIONED SAMPLES OBTAINED W HEN REQUIRED BY PERMIT: Facility reads flow each hour during compositing<br />

sampling and includes a representative proportion <strong>of</strong> each hourly sample in the composite sample.<br />

þY ¨N ¨NA ¨NE<br />

4. SAMPLING AND ANALYSES COMPLETED ON PARAMETERS SPECIFIED IN PERMIT: þY ¨N ¨NA ¨NE<br />

5. SAMPLING AND ANALYSES PERFORMED AT FREQUENCY SPECIFIED IN PERMIT: þY ¨N ¨NA ¨NE<br />

6. SAMPLE COLLECTION PROCEDURES ADEQUATE: þY ¨N ¨NA ¨NE<br />

a. SAMPLES REFRIGERATED DURING COMPOSITING: 3 hr composite samples are placed in incubator at 20 C prior to compositing.<br />

Mr. Parks reports being told to store these samples at 20 C during the previous inspection and was doing so.<br />

¨Y þN ¨NA ¨NE<br />

b. PROPER PRESERVATION TECHNIQUES USED: Samples are analyzed or processed on-site within 15 minutes <strong>of</strong> collection.<br />

Excludes 3 hr composite samples (BOD and TSS).<br />

þY ¨N ¨NA ¨NE<br />

c. CONTAINERS AND SAMPLE HOLDING TIMES CONFORM TO 40 CFR 136: þY ¨N ¨NA ¨NE<br />

7. IF MONITORING IS PERFORMED MORE OFTEN THAN REQUIRED ARE RESULTS REPORTED ON THE DMR: ¨Y ¨N þNA ¨NE<br />

SECTION E: FLOW MEASUREMENT<br />

PERMITTEE FLOW MEASUREMENT MEETS PERMIT REQUIREMENTS<br />

DETAILS:<br />

þS ¨M ¨U ¨NA ¨NE<br />

1. PRIMARY FLOW MEASUREMENT DEVICE PROPERLY INSTALLED AND MAINTAINED: TYPE OF DEVICE: 9 in Parshall flume þY ¨N ¨NA ¨NE<br />

2. FLOW MEASURED AT EACH OUTFALL AS REQUIRED: þY ¨N ¨NA ¨NE<br />

3. SECONDARY INSTRUMENTS (TOTALIZERS, RECORDERS, ETC.) PROPERLY OPERATED AND MAINTAINED: þY ¨N ¨NA ¨NE<br />

4. CALIBRATION FREQUENCY ADEQUATE: þY ¨N ¨NA ¨NE<br />

5. RECORDS MAINTAINED OF CALIBRATION PROCEDURES: þY ¨N ¨NA ¨NE<br />

6. CALIBRATION CHECKS DONE TO ASSURE CONTINUED COMPLIANCE: 2 or 3 times each year (not including annual calibration). þY ¨N ¨NA ¨NE<br />

7. FLOW ENTERING DEVICE WELL DISTRIBUTED ACROSS THE CHANN EL AND FREE OF TURBULENCE: þY ¨N ¨NA ¨NE<br />

8. FLOW MEASUREMENT EQUIPMENT ADEQUATE TO HANDLE EXPECTED RANGE OF FLOW RATES: þY ¨N ¨NA ¨NE<br />

9. HEAD MEASURED AT PROPER LOCATION: þY ¨N ¨NA ¨NE<br />

SECTION F: LABORATORY<br />

PERMITTEE LABORATORY PROCEDURES MEET PERMIT REQUIREMENTS<br />

DETAILS:<br />

1. EPA APPROVED ANALYTICAL PROCEDURES USED (40 CFR 136.3 FOR LIQUIDS, 503.8(B) FOR SLUDGES) : Using Standard<br />

methods.<br />

þS ¨M ¨U ¨NA ¨NE<br />

þY ¨N ¨NA ¨NE<br />

2. IF ALTERNATIVE ANALYTICAL PROCEDURES ARE USED, PROPER APPROVAL HAS BEEN OBTAINED: ¨Y ¨N þNA ¨NE<br />

3. SATISFACTORY CALIBRATION AND MAINTENANCE OF INSTRUMENTS AND EQUIPMENT: þY ¨N ¨NA ¨NE<br />

4. QUALITY CONTROL PROCEDURES ADEQUATE: þY ¨N ¨NA ¨NE<br />

5. DUPLICATE SAMPLES ARE ANALYZED >10% OF THE TIME: 100% <strong>of</strong> time. þY ¨N ¨NA ¨NE<br />

6. SPIKED SAMPLES ARE ANALYZED >10% OF THE TIME: Blanks analyzed. ¨Y þN ¨NA ¨NE<br />

7. COMMERCIAL LABORATORY USED: N/A ¨Y þN ¨NA ¨NE<br />

a. LAB NAME:<br />

b. LAB ADDRESS:<br />

c. PARAMETERS PERFORMED:<br />

8. BIOMONITORING PROCEDURES ADEQUATE: ¨Y ¨N þNA ¨NE<br />

a. PROPER ORGANISMS USED: ¨Y ¨N þNA ¨NE<br />

b. PROPER DILUTION SERIES FOLLOWED: ¨Y ¨N þNA ¨NE<br />

c. PROPER TEST METHODS AND DURAT ION: ¨Y ¨N þNA ¨NE<br />

d. RETESTS AND/OR TRE PERFORMED AS REQUIRED: ¨Y ¨N þNA ¨NE<br />

NPDES R eport Page 5


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

SECTION G: EFFLUENT/RECEIVING WATERS OBSERVATIONS<br />

BASED ON VISUAL OBSERVATIONS ONLY<br />

¨S ¨M ¨U ¨NA þNE<br />

DETAILS: Arkansas River. Could not view effluent as outfall was submerged during the inspection. I did not view<br />

any foam, solids, or turbidity as effluent left the flume.<br />

OUTFALL #: OIL SHEEN GREASE TURBIDITY VISIBLE FOAM FLOATING SOLIDS COLOR OTHER<br />

001<br />

SECTION H: SLUDGE DISPOSAL<br />

SLUDGE DISPOSAL MEETS PERMIT REQUIREMENTS<br />

þS ¨M ¨U ¨NA ¨NE<br />

DETAILS: Dried in drying beds and disposed <strong>of</strong> at Yell Co. landfill.<br />

1. SLUDGE MANAGEMENT ADEQUATE TO MAINTAIN EFFLUENT QUALITY: þS ¨M ¨U ¨NA ¨NE<br />

2. SLUDGE RECORDS MAINTAINED AS REQUIRED BY 40 CFR 503: ¨S ¨M ¨U þNA ¨NE<br />

3. FOR LAND APPLIED SLUDGE, TYPE OF LAND APPLIED TO: (E.G., FOREST, AGRICULTURAL, PUBLIC CONTACT SITE):<br />

SECTION I: SAMPLING INSPECTION PROCEDURES<br />

SAMPLE RESULTS WITHIN PERMIT REQUIREMENTS<br />

¨S ¨M ¨U þNA ¨NE<br />

DETAILS: No samples collected.<br />

1. SAMPLES OBTAINED THIS INSPECTION: ¨Y ¨N þNA ¨NE<br />

2. TYPE OF SAMPLE: ¨GRAB: ¨COMPOSITE: METHOD: FREQUENCY:<br />

3. SAMPLES PRESERVED: ¨Y ¨N þNA ¨NE<br />

4. FLOW PROPORTIONED SAMPLES OBTAINED: ¨Y ¨N þNA ¨NE<br />

5. SAMPLE OBTAINED FROM FACILITY'S SAMPLING DEVICE: ¨Y ¨N þNA ¨NE<br />

6. SAMPLE REPRESENTATIVE OF VOLUME AND NATURE OF DISCHARG E: ¨Y ¨N þNA ¨NE<br />

7. SAMPLE SPLIT WITH PERMITTEE: ¨Y ¨N þNA ¨NE<br />

8. CHAIN-OF-CUSTODY PROCEDURES EMPLOYED: ¨Y ¨N þNA ¨NE<br />

9. SAMPLES COLLECTED IN ACCORDANCE WITH PERMIT: ¨Y ¨N þNA ¨NE<br />

SECTION J: STORM WATER POLLUTION PREVENTION PLAN<br />

STORM WATER MANAGEMENT MEETS PERMIT REQUIREMENTS<br />

¨S ¨M ¨U þNA ¨NE<br />

DETAILS:<br />

1. SWPPP UPDATED AS NEEDED: DATE OF LAST UPDATE: ¨Y ¨N þNA ¨NE<br />

2. SITE MAP INCLUDING ALL DISCHARGES AND SURFACE WATERS: ¨Y ¨N þNA ¨NE<br />

3. POLLUTION PREVENTION TEAM IDENTIFIED: ¨Y ¨N þNA ¨NE<br />

4. POLLUTION PREVENTION TEAM PROPERLY TRAINED: ¨Y ¨N þNA ¨NE<br />

5. LIST OF POTENTIAL POLLUTANT SOURCES: ¨Y ¨N þNA ¨NE<br />

6. LIST OF POTENTIAL SOURCES AND PAST SPILLS AND LEAKS: ¨Y ¨N þNA ¨NE<br />

7. ALL NON-STORM WATER DISCHARGES ARE AUTHORIZED: ¨Y ¨N þNA ¨NE<br />

8. LIST OF STRUCTURAL BMPS: ¨Y ¨N þNA ¨NE<br />

9. LIST OF NON-STRUCTURAL BMPS: ¨Y ¨N þNA ¨NE<br />

10. BMPS PROPERLY OPERATED AND MAINTAINED: ¨Y ¨N þNA ¨NE<br />

11. INSPECTIONS CONDUCT ED AS REQUIRED: ¨Y ¨N þNA ¨NE<br />

NPDES R eport Page 6


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

FLOW CALCULATION SHEET<br />

Date: 2/18/<strong>2010</strong> Time: 11:35<br />

Head in Inches: 5 3/4 Feet: 0.4792<br />

Type & Size <strong>of</strong> Primary Flow Measurement Device:<br />

9 inch Parshall flume.<br />

Name & Model <strong>of</strong> Secondary Flow Measurement Device:<br />

Milltronics Hydroranger Totalizer.<br />

Date <strong>of</strong> last Calibration <strong>of</strong> Secondary Flow Device:<br />

1/8/<strong>2010</strong>.<br />

Recorded Flow at Date & Time Listed Above: 462 GPM (Facility Flow Meter)<br />

Calculated Flow at Date & Time Listed Above:<br />

448.3 GPM<br />

(Flow is calculated using flow charts in: ISCO Open Channel Flow Measurement Handbook-5 th Edition)<br />

% Error =<br />

% Error =<br />

Recorded Value - Calculated Value<br />

Calculated Value<br />

462 - 448.3<br />

448.3<br />

X 100<br />

X 100<br />

% Error =<br />

13.7<br />

448.3<br />

X 100<br />

% Error = 0.0305598929 X 100<br />

% Error = 3.05598929 % 3.1 %<br />

Comments: Within 10%.<br />

NPDES R eport Page 7


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

DMR Calculation Check<br />

Reporting Period: From 09 09 01 To 09 09 30<br />

Year Month Day Year Month Day<br />

Parameter Checked:<br />

TSS<br />

Loading<br />

Concentration<br />

Mass<br />

Monthly<br />

Mo. Avg. - lbs/day Mo. Avg. - mg/l 7-day Avg. - mg/l<br />

Reported Value: 31 7.3 10<br />

Calculated Value: 36 7.3 10<br />

Permit Value: 245 30 45<br />

If calculated value does not equal reported value, explain:<br />

Results: (9/30/09, .552 MGD, 8 mg/l), (9/23/09, 0.632 MGD, 4 mg/l), (9/9/09, 0.608 MGD, 10 mg/l).<br />

NPDES R eport Page 8


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

DMR Calculation Check<br />

Reporting Period: From 09 10 01 To 09 10 31<br />

Year Month Day Year Month Day<br />

Parameter Checked:<br />

TSS<br />

Loading<br />

Concentration<br />

Mass<br />

Monthly<br />

Mo. Avg. - lbs/day Mo. Avg. - mg/l 7-day Avg. - mg/l<br />

Reported Value: 37.5 9.3 10<br />

Calculated Value: 43 9.3 <strong>12</strong>*<br />

Permit Value: 245 30 45<br />

If calculated value does not equal reported value, explain:<br />

Results: (10/7/09, 0.552 MGD, 10 mg/l), (10/22/09, 0.560 MGD, <strong>12</strong> mg/l), (10/28/09, 0.592 MGD, 6 mg/l).<br />

*No more than one sample collected in a week. Results were 10 mg/l on 10/7, <strong>12</strong> mg/l on 10/22, and 6 mg/l on<br />

10/28.<br />

NPDES R eport Page 9


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

DMR Calculation Check<br />

Reporting Period: From 09 11 01 To 09 11 30<br />

Year Month Day Year Month Day<br />

Parameter Checked:<br />

TSS<br />

Loading<br />

Concentration<br />

Mass<br />

Monthly<br />

Mo. Avg. - lbs/day Mo. Avg. - mg/l 7-day Avg. - mg/l<br />

Reported Value: 27 8 9<br />

Calculated Value: 36 8 10<br />

Permit Value: 245 30 45<br />

If calculated value does not equal reported value, explain:<br />

Results: (11/<strong>12</strong>/09, 0.536 MGD, 6 mg/l), (11/20/09, 0.560 MGD, 10 mg/l), (11/25/09, 0.544 MGD, 8 mg/l).<br />

NPDES R eport Page 10


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

DMR Calculation Check<br />

Reporting Period: From 09 09 01 To 09 09 30<br />

Year Month Day Year Month Day<br />

Parameter Checked:<br />

FCB<br />

Loading<br />

Concentration<br />

Mass<br />

Monthly<br />

Mo. Avg. - lbs/day Mo. Avg. - mg/l 7-day Avg. - mg/l<br />

Reported Value: 100 100<br />

Calculated Value: 83* 98*<br />

Permit Value: 200 400<br />

If calculated value does not equal reported value, explain: Rounding <strong>of</strong> logs.<br />

Results (9/9/09 72, <strong>12</strong>1, 82, 130), (9/23/09 54, 91), (9/30/09 67, 103).<br />

* Facility is rounding log values to 2. For example, for 54 colonies, the log <strong>of</strong> 54 is 1.732. The<br />

facility rounds 1.732 to 2 and averages before taking the anti-log.<br />

2 + 2 = 4, average 2, and anti-log <strong>of</strong> 2 is 100 vs.<br />

1.732 + 1.959 = 3.691, average 1.845, and anti-log <strong>of</strong> 1.845 is 69.9.<br />

NPDES R eport Page 11


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

NPDES Compliance Inspection Report<br />

Further Explanation<br />

The facility collects three grab samples, one each hour, for a 3 hour composite sample. TSS and BOD5 grab samples<br />

are not being stored at < 6 C prior to compositing. Mr. Parks states that he was told by the inspector to store these<br />

samples in an incubator at 20 C during the previous inspection.<br />

I reviewed DMR and analysis data for 09/2009, 10/2009, and 11/2009. I identified some differences in the TSS monthly<br />

load rate reported in the DMRs and my calculated monthly TSS load rates. TSS monthly load rates were under-reported<br />

by 5-9 lb/day in the DMRs. The under-reported values do not affect compliance status with TSS limits. The highest calculated monthly<br />

TSS load was 43 lb/day and the facility limit is 245 lb/day. ADEQ inspector Amy Beck visited the facility with me on<br />

2/26/<strong>2010</strong>. We went through the process <strong>of</strong> calculating values for the DMR. Mr. Parks requested copies which show<br />

how monthly load rates should be calculated.<br />

FCB colonies monthly average appear to be over-reported on the 09/2009 DMR due to rounding. The facility is<br />

correctly calculating the monthly average; however, the log values were rounded to 2 prior to determining the average<br />

<strong>of</strong> the log values. For example (for 9/23) sampling the logs <strong>of</strong> 54 and 91 were both rounded to 2 with an average <strong>of</strong> 2<br />

instead <strong>of</strong> log <strong>of</strong> 54 = 1.7 + log <strong>of</strong> 91 = 1.9 = 3.6 then averaged to 1.8. The anti-log <strong>of</strong> 2 = 100 colonies while the antilog<br />

<strong>of</strong> 1.8 = 63 colonies. For the month <strong>of</strong> September 2009, I determined a monthly average <strong>of</strong> 83 colonies while a<br />

monthly average <strong>of</strong> 100 colonies was reported in the DMR.<br />

NPDES R eport Page <strong>12</strong>


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

Location:<br />

Water Division NPDES Photographic Evidence Sheet<br />

Photos <strong>of</strong> records obtained from the facility.<br />

Photographer: Travis Harmon Witness: None<br />

Photo # 1 Of 3 Date: 2/26/<strong>2010</strong> Time: 15:43<br />

Description:<br />

Flow and monthly load (TSS) calculations. 220 on the sheet is equivalent <strong>of</strong> 22,000<br />

gallons/hour as the totalizer reads gallons x 100.<br />

Photographer: Travis Harmon Witness: None<br />

Photo # 2 Of 3 Date: 2/26/<strong>2010</strong> Time: 15:42<br />

Description:<br />

Facility FCB geometric mean calculations. Shows log values rounded to 2 prior to<br />

averaging and calculating anti-log.<br />

NPDES R eport Page 13


ADEQ Water NPDES Inspection AFIN: 75-00024 Permit #: AR0033421<br />

Location:<br />

Water Division NPDES Photographic Evidence Sheet<br />

<strong>City</strong> <strong>of</strong> <strong>Dardanelle</strong> POTW.<br />

Photographer: Travis Harmon Witness: None<br />

Photo # 3 Of 3 Date: 2/18/<strong>2010</strong> Time: 11:21<br />

Description:<br />

Nocardia bacteria generating foam in clarifier. Has been an on-going issue at the facility<br />

but does not appear to be impacting the facilitys ability to meet effluent limits.<br />

NPDES R eport Page 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!