29.12.2013 Views

INDC(SEC)-46/U+R+F+SIN DC INTERNATIONAL NUCLEAR DATA ...

INDC(SEC)-46/U+R+F+SIN DC INTERNATIONAL NUCLEAR DATA ...

INDC(SEC)-46/U+R+F+SIN DC INTERNATIONAL NUCLEAR DATA ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

91 PROTACTINIUM 233 NEUTRCN CAPTURE CROSS <strong>SEC</strong>TION < CONTINUED)<br />

£51221 1o 00 MV 100c EV ICoOX 2 USA AoMoPERRY ORL<br />

o: THORIUM CYCLE DESIGN So<br />

.755213 25o 3 MV 20o 0 MEV SoOX 2 INC Gc EoGARG<br />

T RM<br />

0: REQUIRED FOR THORIUM FUEL-CYCLE STUDIESo<br />

M: NEW REQUESTC<br />

STATUS<br />

STATUS<br />

BET C CNN ER - WAPO-TM-837 ( 1970). THERMAL VALUE,<br />

91 PROTACTINIUM 223 NEUTRCN FISSION CROSS <strong>SEC</strong>TION<br />

755515 25o3 MV 20o 0 MEV SoOX 2 INC Go Ec GARG TRM<br />

0: REQUIRED FOR THORIUM FUEL-CYCLE STUDIESo<br />

M: NEW REQUEST,<br />

91 PROTACTINIUM 233 NEUTRON RESONANCE PARAMETERS<br />

652232 1OOo EV lOoOX 3 NEC MiEc Ao HERMANS VON<br />

Q: NEUTRON AND CAPTURE WIDTH NEEDEDo<br />

91 PROTACTINIUM 233 NEUTRON ABSORPTION RESONANCE INTEGRAL<br />

£52333 Oo 50 EV ICoOX 1 GER MAERKL SRE<br />

STATUS<br />

STATUS<br />

BET CONNER - kAPD-TM-837 (1970)o<br />

91 PROTACTINIUM £24 NEUTRON TOTAL CRCSS <strong>SEC</strong>TION<br />

252015 25o 3 MV 20o 0 MEV SoOX 2 INC Go Eo GARG TRM<br />

0: REQUIRED FOR THORIUM FUEL-CYCLE STUDIESo<br />

M: NEW REQUEST,<br />

91 PROTACTINIUM 224 NEUTRCN ELASTIC CROSS <strong>SEC</strong>TION<br />

253012 2 Eo 3 MV 20o 0 MEV SoOX 2 INO Ge Be GARG TRM<br />

o: REQUIRED FOR THORIUM FUEL-CYCLE STUDIES,<br />

M: NEW REQUEST,<br />

91 PR0TACTINIUM_234 NEUTRON _ INELASTIC CROSS <strong>SEC</strong>TION<br />

252015 20o 0 MEV SoOX 2 INO Go Bo GARG TRM<br />

0: REQUIRED FOR THORIUM FUEL-CYCLE STUDIESo<br />

M: NEW REQUESTo<br />

91 PROTACTINIUM 234 NEUTRON CAPTURE CROSS <strong>SEC</strong>TION<br />

253015 2 Eo 3 MV 2 Oo 0 MEV SoOX 2 INC Go Bo GARG TRM<br />

O: REQUIRED FOR THORIUM FUEL-CYCLE STUDIESo<br />

M: NEW REQUESTc<br />

91 PROTACTINIUM 234 NEUTRCN FISSICN CROSS <strong>SEC</strong>TION<br />

252020 2 5o 3 MV 20o 0 MEV SoOX 2 IND Go Be GARG TRM<br />

0: REQUIRED FOR THORIUM FUEL-CYCLE STUDIES,<br />

M: NEW REQUEST,<br />

92 URANIUM 232 NEUTRON CAPTURE CROSS <strong>SEC</strong>TION<br />

231133 500o EV 10,0 MEV 2 USA Ro He CAHLBERG GA<br />

A: ACCURACY REQUIRED - 2 TO 10 PERCENTo<br />

O: FOR FAST REACTOR BLANKETSo<br />

M: NEW REQUESTo<br />

92_URANIUM 233 _ HALF LIFE<br />

231115 OoSX 1 USA NcSTEEN BET<br />

0: TO RESOLVE DISCREPANCIES,<br />

M: NEW REQUEST,<br />

92URANIUM 233 _ NEUTRON TOTAL CROSS <strong>SEC</strong>TION<br />

252021 2 So 3 MV 20o 0 MEV SoOX 2 INC Go Bo GARG TRM<br />

0: REQUIRED FOR THORIUM FUEL-CYCLE STUDIESo<br />

M: NEW REQUESTo<br />

FISSION LIST PAGE IIo 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!