Shuweihat S1 1,500 MW Power Plant ACC is the civil works contractor on the Shuweihat S1 1,500 MW combined cycle power plant, 250 kilometers west of Abu Dhabi. It is currently one of the world's largest combined power and water plant complexes delivering 1,500 MW of power to the Emirate of Abu Dhabi. The power plant It is also an Independent Water and Power Project commissioned on a BOO basis. CMS Energy and International Power are part owners of this plant. Siemens is the EPC contractor. The project consists of five Siemens V94.3A gas turbines, two 251 MW steam turbines, seven electrical generators and all the ancillary systems. The power plant will be linked to a seawater desalination facility which will be supplied steam from the turbines. Parul Institute of Management and Research - 792 Page 64

Smart buildings Etisalat Abu Dhabi tower The Etisalat Abu Dhabi tower will be the future headquarters of the Emirates Telecommunication Corporation. ACC was the main contractor on the project. The 160 meter high structure is a new generation smart building incorporating a sophisticated HVAC system, inert gas fire fighting system, a closed circuit TV system (CCTV), advanced lighting control, security & access systems, all managed by an advanced Building Management System. ACC was the main contractor for the Etisalat Headquarters in Sharjah, United Arab Emirates. The tower's complex design is inspired by the shape of an Islamic minaret. The 120 metre high tower contains three large granite and stainless steel public areas, a cafeteria & lounge, a highly finished 72 seat auditorium and 12 floors of office, mechanical, transmission, telecom switching and network management areas. Smart building capabilities include an advanced Building Management System, a closed circuit TV system (CCTV), a lighting control system and an integrated security and access control system. Parul Institute of Management and Research - 792 Page 65

Shuweihat S1 1,500 MW Power Plant<br />

ACC is the civil works contractor on the Shuweihat S1 1,500 MW combined cycle<br />

power plant, 250 kilometers west of Abu Dhabi. It is currently one of the world's<br />

largest combined power and water plant complexes delivering 1,500 MW of power to<br />

the Emirate of Abu Dhabi.<br />

The power plant It is also an Independent Water and Power Project commissioned<br />

on a BOO basis. CMS Energy and International Power are part owners of this plant.<br />

Siemens is the EPC contractor. The project consists of five Siemens V94.3A gas<br />

turbines, two 251 MW steam turbines, seven electrical generators and all the<br />

ancillary systems. The power plant will be linked to a seawater desalination facility<br />

which will be supplied steam from the turbines.<br />