Telecommunications Infrastructure Development<br />

PROJECTS OF COMPANY<br />

Power Sector<br />

Taweelah A2 750 MW power plant<br />

ACC was the civil works contractor for the Taweelah A2 750 MW power plant in the<br />

UAE, 80km east of Abu Dhabi. Completed in 2001, Taweelah A2 has the distinction<br />

of being the first BOT project in the UAE's power sector. Taweelah A2 is owned by<br />

Abu Dhabi Water and Electricity Authority (ADWEA) and CMS Energy. Siemens was<br />

the EPC contractor and the power plant includes three Siemens V94.3A gas<br />

turbines, three heat recovery steam generators and two steam turbines.<br />

The project was executed on a fast track basis in order to honor a commitment made<br />

by Abu Dhabi Water and Electricity Authority to increase power output by May 2000.<br />

Taweelah A2 is now the benchmark for all Independent Water and Power Projects<br />

(IWPP) in the Gulf.<br />