26.12.2013 Views

Saturnino A. Pacubas - USAid

Saturnino A. Pacubas - USAid

Saturnino A. Pacubas - USAid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

-2­<br />

h.'Any geodetic engineer who is a partner of artnersh r or member<br />

of the Board of Directors of a corporation whose survey contract<br />

has been abandoned, rescinded or terminated due to fault or<br />

negligence of such partnership or corpration.<br />

A.3 - Any partnership whose members are all geodetic engineers, qualified<br />

to bid as individual organized and authorized under existing laws<br />

and regulations of the Philippines to engage in land surveys .hich<br />

does not possess any of the disqualifications mentioned in A.3.1 is<br />

qualified to bid. Provided, however, that partnerships which were<br />

prenualifie in previous biddinzs shall be allowed to bid.<br />

A.3.1 - The following partnership are disqualified to bid:<br />

a. Any partnership which has been declared as<br />

standing by the Bureau of Lands, NLA, ND.<br />

agencies contracting survey projects;<br />

enzl-z .. oo<br />

nd other govern-ment<br />

b. Any partnership which has already a project awarded and/or in<br />

progress with the Bureau of Lands and two (2) negotiated<br />

contracts. Survey projects already submitted and accepted<br />

for verification and approval by the Director of Lands or<br />

Regional Land Director shall be con a. ded as projects no<br />

longer in progress;<br />

c. Any partnership which has caused its survey contract to be<br />

abandoned, rescinded or terminated due to its fault and negligence.<br />

Abandonment in this context means failure to continue<br />

executing the project in accordance with the contract;<br />

d. Any partnership which has refused or failed to complete the<br />

correction work within the limit required, however, if the<br />

partnership submits the corrected work beyond the time limit<br />

required and such correction work is approved by the Director<br />

of Lands 'efore the date of bidding, the said partnership may<br />

be allowed to bid;<br />

a. Any partnership which has a partner an individual contractor<br />

who has been declared as a contractor of not good standing by<br />

the 7ureau of Lands, ..R, .and other government agencies<br />

contrac'ing survey projects;<br />

f. Any partnership which has as Ipartner and/or a member of the<br />

Board of Director of a corporation that has been declared as<br />

a contractor of not good standing by the Bureau of Lands, MIAR,<br />

NIA and other government agencies contracting survey projects;<br />

g. Any partnership which has as partner and/or a member of the<br />

Board of Directors of a corporation, an individual contractor<br />

whose survey contract had been abandoned, rescinded or terminated<br />

due to his fault or negligence.<br />

A44<br />

Any corporation, the majori ty of the paid-up capital stock of which<br />

is owmed by the incorporators who are duly licensed geodetic engineers<br />

qualified to bid as individual and with a paid-up capital of at least<br />

TVWT'f T!OSAYD (T2,COO.OC) PESOS zr :zzed and authorized under existini<br />

laws and regulations of the khilir:pines to en.ge in land surveys which<br />

does not possess any of the disqualification mentioned in A.4.1 is<br />

qualified to bid. Provided, however, that corporations which were prequalified<br />

in previous biddings shall be allowed to bid.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!