Saturnino A. Pacubas - USAid
Saturnino A. Pacubas - USAid
Saturnino A. Pacubas - USAid
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
-2<br />
h.'Any geodetic engineer who is a partner of artnersh r or member<br />
of the Board of Directors of a corporation whose survey contract<br />
has been abandoned, rescinded or terminated due to fault or<br />
negligence of such partnership or corpration.<br />
A.3 - Any partnership whose members are all geodetic engineers, qualified<br />
to bid as individual organized and authorized under existing laws<br />
and regulations of the Philippines to engage in land surveys .hich<br />
does not possess any of the disqualifications mentioned in A.3.1 is<br />
qualified to bid. Provided, however, that partnerships which were<br />
prenualifie in previous biddinzs shall be allowed to bid.<br />
A.3.1 - The following partnership are disqualified to bid:<br />
a. Any partnership which has been declared as<br />
standing by the Bureau of Lands, NLA, ND.<br />
agencies contracting survey projects;<br />
enzl-z .. oo<br />
nd other govern-ment<br />
b. Any partnership which has already a project awarded and/or in<br />
progress with the Bureau of Lands and two (2) negotiated<br />
contracts. Survey projects already submitted and accepted<br />
for verification and approval by the Director of Lands or<br />
Regional Land Director shall be con a. ded as projects no<br />
longer in progress;<br />
c. Any partnership which has caused its survey contract to be<br />
abandoned, rescinded or terminated due to its fault and negligence.<br />
Abandonment in this context means failure to continue<br />
executing the project in accordance with the contract;<br />
d. Any partnership which has refused or failed to complete the<br />
correction work within the limit required, however, if the<br />
partnership submits the corrected work beyond the time limit<br />
required and such correction work is approved by the Director<br />
of Lands 'efore the date of bidding, the said partnership may<br />
be allowed to bid;<br />
a. Any partnership which has a partner an individual contractor<br />
who has been declared as a contractor of not good standing by<br />
the 7ureau of Lands, ..R, .and other government agencies<br />
contrac'ing survey projects;<br />
f. Any partnership which has as Ipartner and/or a member of the<br />
Board of Director of a corporation that has been declared as<br />
a contractor of not good standing by the Bureau of Lands, MIAR,<br />
NIA and other government agencies contracting survey projects;<br />
g. Any partnership which has as partner and/or a member of the<br />
Board of Directors of a corporation, an individual contractor<br />
whose survey contract had been abandoned, rescinded or terminated<br />
due to his fault or negligence.<br />
A44<br />
Any corporation, the majori ty of the paid-up capital stock of which<br />
is owmed by the incorporators who are duly licensed geodetic engineers<br />
qualified to bid as individual and with a paid-up capital of at least<br />
TVWT'f T!OSAYD (T2,COO.OC) PESOS zr :zzed and authorized under existini<br />
laws and regulations of the khilir:pines to en.ge in land surveys which<br />
does not possess any of the disqualification mentioned in A.4.1 is<br />
qualified to bid. Provided, however, that corporations which were prequalified<br />
in previous biddings shall be allowed to bid.