- 3 - I - Project Execution 1. Contractor establishes Office in project site a. Brings in personnel, equipment and supplies b. Conducts dialogue with local officials and landowners c. Post notices, etc. 2. Inaugurates Project - Presence of National/Local Officials and land claims very important 3. Conduct Field reconnaissance for establishment of control lines; establish and survey preliminary traverse lines for use in preparation of progress map and control map. (Follow all the activites in attached work program under final completion)
~INSRCTIONS 4 T0O ''OF, CONTRAkCT 3IDDRS. A]WrD _T.S AV, FOR.A~TA~SRE ~ ~~.(V ~(196 2 BIDDING) A ,v. .r.... > .'W COIflITIOITS nRO3CTnS * QUALI'ICAT ON OF -BIDDl RS: : iA - d- ngf1r_ data suvyprojects-shall-be opnd to 1nd ~aaS~K~., partnershiDs and corporations. a corpora:rtid nor.a ,partnership offers .bid f or:any, project,any member.,or partner theref or's hall be di'qiualified to submit his individualIbid~for the same project.. When 'sband andiife ae oth qualified geodetic eriners. 9Pl' No1-,co thm. shal be allowed t o bid'fo' any one' (lX project., Non-cmpl-iancewith these provisions shall disqualify all such bids. .*...... ,., ........ ,h !i % : L A.2 A.-Any eise gecdetic engineer w.ho -Ier X Egtanrn-~ -1
- Page 1 and 2: THE LEGAL ASPECT OF LAND MAPPING, T
- Page 3 and 4: THE LEGAL ASPECT OF LAND MAPPING, T
- Page 5 and 6: - 3 3. The customs and attitude
- Page 7 and 8: - 5 of the land or restrict its
- Page 9 and 10: - 7 - These two laws are considered
- Page 11 and 12: - 9- SECTION III - NATIONAL POLICY.
- Page 13 and 14: - 11 there are about 21 document
- Page 15 and 16: - 13 increasing access of the ru
- Page 17 and 18: - 15 means that within a fixed p
- Page 19 and 20: - 17 - The district Land Officers,
- Page 21 and 22: - 19 - Section VIII: APPENDICES SCO
- Page 23 and 24: - 21 - Relationship of Contractor o
- Page 25 and 26: - 23 - Registration of Land Titles
- Page 27 and 28: - 2 - The 94 projects listed may no
- Page 29 and 30: -4- VII - Equipment Requiraments 1.
- Page 31 and 32: -6 Description/Personnel Used Dur
- Page 33 and 34: Duration Total Cost 7- Carding and
- Page 35 and 36: Project Activity Time Frame Cadastr
- Page 37: - 2 6. Prequalification of Bidde
- Page 41 and 42: Aa A-4.1 The following corporation
- Page 43 and 44: X~~ ie'rg 0( a q i r. , hOotract, o
- Page 45 and 46: Tho b3ureau reser'vc~s th- right' t
- Page 47 and 48: 14 E'v e ry wh -: L~ z. 1onrh"o crn
- Page 49 and 50: Teproject shaill cover. the >rea is
- Page 51 and 52: aoidy,the d -adlino ~h.bMoyod to ih
- Page 53 and 54: paymeant in excess, of 50% of, tnh.
- Page 55 and 56: PRE-QUALIFICAT ION STATM-1EN'T (Ind
- Page 57 and 58: PRE-QJALIFICATION STATEMENT (Indivi
- Page 59 and 60: -2- The opening o' the spale4 bids
- Page 61 and 62: 3 ID (Indivi ual) I, ._ , hereby ma
- Page 63 and 64: Republic of the Philippines Ministr
- Page 65 and 66: kABThACT 07 THEZ 3LDDM5 Proecet Num
- Page 67 and 68: Republic of the Phdlippines I.1I5ST
- Page 69 and 70: 2 M- icipali . '-7e final project c
- Page 71 and 72: -4 cipality of _ , Province of co__
- Page 73 and 74: DL For= No. iDO NR-5 RepW .lika ng.
- Page 75 and 76: *TC tC) t, iai.j 4 f -Lands 4 ~ ~ *
- Page 77 and 78: IRepublika ng Pilipinas Mipistri Ng
- Page 79 and 80: f hambeen rescnted/ /'ha~ve -notf ~
- Page 81 and 82: 'nte0 .ONV.'1982 1Repiblika 'ng. Pi
- Page 83 and 84: 9 bonret 'nurents have been previcu
- Page 85 and 86: l.nvtrr~et ...... 7 "I-..j ", : bei
- Page 87 and 88: BL Form No. 100 NR-12 Repuldika ng
- 3 -<br />
I -<br />
Project Execution<br />
1. Contractor establishes Office in project site<br />
a. Brings in personnel, equipment and supplies<br />
b. Conducts dialogue with local officials and landowners<br />
c. Post notices, etc.<br />
2. Inaugurates Project -<br />
Presence of National/Local Officials and land claims very<br />
important<br />
3. Conduct Field reconnaissance for establishment of control<br />
lines; establish and survey preliminary traverse lines for<br />
use in preparation of progress map and control map.<br />
(Follow all the activites in attached work program under<br />
final completion)