-9 -<br />

Duration<br />

Total Cost<br />

­<br />

13. Niscdlaneous Expenses<br />

a) Communication Services----------------- P 2,000<br />

b) Transportation Services------- 26,000<br />

c) Other Services ---------------------- 32,600<br />

d) Supplies and '.aterials ------------ 26,000<br />

• Representation/Allowance ---------- 26,000<br />

" Reproduction of plans-------------------------- -m,OOO<br />

" Carpentry ------------------------ --------- 1000<br />

• Nisc. Expense 1,0<br />

e) Pent of building (;400/mo.) transits, theodolites,<br />

chainbands, furnitues etc. ------------- 65,000<br />

Summary of Activities, Elements of Cost, Activity durations and Total<br />

Costings<br />

Activity Persornnel Used Salaries Travel Expenses Duration Total Cost<br />

1 25 P 16,800 i 1,600 - -n.t0 4-"<br />

II 3 16,875 (!P42,000)* 12.5 mo. 58,875<br />

iII 23 25,100 4,600 2 months 29,700<br />

IV 24 52,000 8,8O 4 months 56,800<br />

V 2 20,000 2,000 20 mo. 2,000<br />

VI 27(40only) 97,650 2,300 18 Mo. 121,950<br />

VII 27(60,%only)146,475 - s8 mo. 146,475<br />

VIII 2 _18,000 1,000 18 mo. 19,800<br />

IX 4 62,400 - 26 mo. 62,400<br />

X 3 46,800 - 26 mo. 46,300<br />

XI 13 8,400 1 mo. 8, 400<br />

XII 4 87,500 75,000 25 mo. 162,500<br />

P 598,000 P 114,100 P712,100<br />

Plus:<br />

a) Communication services at PIOO/mo x 26 2,600<br />

b) Transportation services at PIOOO/mo/X26 ------- 26,000<br />

c) Ot1.r Services ---------------------------------------- 32,600<br />

d) Suvplies and Materials at P1OOO/mo. for 26 mo. 261000***<br />

e) Rent of building, transits, theodolites, chainbands and<br />

other equipment ----------------- 65,000<br />

Total Cost P864,300<br />

Plus 2% contengendes --- 17,286<br />

'881 586<br />

Plus 14 Profit Margin ------------ 123,422<br />

Total Cost P1,0051008<br />

Unit cost per lot = P100.00<br />

Unit cost per hectare = 90.O40<br />

• Cost oY Materials used in monument construction, supplies for monumenting<br />

of political boundaries imputed in the cost of other supplies and<br />

materials under Item VIII.13.d<br />

* rk on sketching and monuMenting and lot sur-veys are done by the same<br />

group for a period of 18 months. A 40%- 6 0% ratior. is applied as the<br />

closet comparative costing of the two activities. The other items<br />

of expense may not necessarily by applied to each of the activities or<br />

spread ovar a period of time. At best it can be imputed as part of the<br />

adminitrative expense which will be reflected in the tdal project cost.<br />

***Emergency food provisions are also included.