- 7 ­<br />

4. easurement of angles and Duration Total Cost<br />

distance of control points-------- 4 months<br />

Personnel Used:<br />

4 teams of:<br />

4 Jr. GE's at PSO0 each/mo. = P12,800<br />

8 Cnainmen at P500 each/mo. = 16,000<br />

8 Rodmen at P500 each/Mo. = 16,000<br />

4 Transit carrier at P450 each/<br />

month 7,200<br />

Total Salaries P52,000 -------- P 52,000<br />

Traveling Expenses ------- 24 men at P50 each/mo. 4, 80O<br />

Total P 56,800<br />

5. Research Work and Data Gatheries ---- 20 months<br />

2 Pesearchers at P500 each/mo. -------------------- P 20,000<br />

Traveling Expenses at P50 each/mo. P50 x 2 x 20 2,00<br />

P 22,000<br />

6. S Sketching and Monumenting of<br />

lot claims ----------------------<br />

18 months<br />

Personnel Used:<br />

4 Jr. GE's at P800 each/mo. P57,600<br />

8 Chainmen at P500 each/mo. 72,000<br />

8 Rodmen at P500 each/mo. 72,000<br />

4 Transit carrier" at P150<br />

each/mo. 32-400<br />

3 Mon. const. man at P450<br />

each/Mo. for 7-5 months 10,125<br />

P244,125<br />

40% corresponds to sketching and monumenting<br />

P 97,650<br />

60, corresponds to lot surveys -------- - 46,475<br />

Sketching and monumenting of lots performed by the same group<br />

that undertake lot surveys.<br />

S* The transit carriers are utilized in monumenting