4. easurement of angles and Duration Total Cost<br />
distance of control points-------- 4 months<br />
Personnel Used:<br />
4 teams of:<br />
4 Jr. GE's at PSO0 each/mo. = P12,800<br />
8 Cnainmen at P500 each/mo. = 16,000<br />
8 Rodmen at P500 each/Mo. = 16,000<br />
4 Transit carrier at P450 each/<br />
month 7,200<br />
Total Salaries P52,000 -------- P 52,000<br />
Traveling Expenses ------- 24 men at P50 each/mo. 4, 80O<br />
Total P 56,800<br />
5. Research Work and Data Gatheries ---- 20 months<br />
2 Pesearchers at P500 each/mo. -------------------- P 20,000<br />
Traveling Expenses at P50 each/mo. P50 x 2 x 20 2,00<br />
P 22,000<br />
6. S Sketching and Monumenting of<br />
lot claims ----------------------<br />
18 months<br />
Personnel Used:<br />
4 Jr. GE's at P800 each/mo. P57,600<br />
8 Chainmen at P500 each/mo. 72,000<br />
8 Rodmen at P500 each/mo. 72,000<br />
4 Transit carrier" at P150<br />
each/mo. 32-400<br />
3 Mon. const. man at P450<br />
each/Mo. for 7-5 months 10,125<br />
P244,125<br />
40% corresponds to sketching and monumenting<br />
P 97,650<br />
60, corresponds to lot surveys -------- - 46,475<br />
Sketching and monumenting of lots performed by the same group<br />
that undertake lot surveys.<br />
S* The transit carriers are utilized in monumenting