4. MODELING <strong>OF</strong> PROPOSED DVR Mustafa İNCİ<br />

Figure 4.9. Timing diagram and basic waveforms for isolated full-bridge dc-dc<br />

converter<br />

2010).<br />

Basic converter operation can be divided into four main states(Nymand et al.,<br />

State 1, First on-period, T1:A first converter on-period, T1, starts when switches,<br />

S1-S2, are turned on. Switches, S3-S4, and diodes, D3-D4, are off. Reflected<br />

inductor current flows from input capacitor, C1, through switch, S1, transformer, T1,<br />

diode, D1, and inductor, L1 to the output, and returns to input through diode, D2, and<br />

switch, S2. The period ends when switches, S1 and S2, are turned off again. Duration<br />

of the on-period is (Nymand et al., 2010):<br />

T = DT<br />

1<br />

(4.11)<br />

The plot for the secondary voltage Vs is shown on Figure 4.9,<br />

56