中環填海第三期工程(pdf 格式,9MB)
中環填海第三期工程(pdf 格式,9MB)
中環填海第三期工程(pdf 格式,9MB)
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Central District (Extension) Outline Zoning Plan – Streamline Option<br />
<br />
<br />
( )
( )
• <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
• <br />
<br />
7 8 <br />
<br />
<br />
<br />
<br />
<br />
<br />
•
Central District (Extension) Outline Zoning Plan<br />
<br />
<br />
Central District (Extension) Outline Zoning Plan<br />
18ha CRIII
New “Star” Ferry Piers<br />
Historical Heritage Approach: View<br />
from North<br />
Clock Tower<br />
Pier 8 Pier 7
• 2001717 815
• <br />
• <br />
•
• <br />
<br />
<br />
<br />
• <br />
18
Aerial View of Victoria Harbour<br />
<br />
Central – Wan Chai Bypass<br />
MTRC<br />
Tsuen Wan Line<br />
IFC
IFC<br />
<br />
Central – Wan Chai Bypass
Central – Wan Chai Bypass<br />
IFC<br />
<br />
Central – Wan Chai Bypass<br />
IFC
Central – Wan Chai Bypass<br />
IFC<br />
<br />
Central – Wan Chai Bypass<br />
IFC<br />
IFC
Central – Wan Chai Bypass<br />
<br />
LEGEND<br />
<br />
CENTRAL-WAN CHAI BYPASS<br />
<br />
Central – Wan Chai Bypass<br />
<br />
LEGEND<br />
<br />
CENTRAL-WAN CHAI BYPASS<br />
10.8 ha
III<br />
Existing Waterfront Facilities to be affected by CRIII<br />
<br />
LEGEND<br />
<br />
EXISTING PIERS<br />
<br />
EXISTING COOLING WATER<br />
PUMPING STATION<br />
<br />
Reprovisioning of Cooling Water Pumping Station<br />
<br />
LEGEND<br />
<br />
INITIAL RECLAMATION<br />
AREA WEST & EAST<br />
<br />
REPROVISIONING OF<br />
COOLING WATER
TYPICAL CROSS-SECTION ACROSS CURRENT MINIMUM OPTION<br />
<br />
CROSS-SECTION OF PUMPING STATION<br />
Typical case of CRIII<br />
Sea bed level at –12 mPD<br />
Alluvium level at –19.5 mPD<br />
Assumed case<br />
Sea bed level at –7.0 mPD<br />
Alluvium level at –14.5 mPD
Reprovisioning of Piers<br />
<br />
LEGEND<br />
<br />
REPROVISIONING OF PIERS<br />
<br />
Reclamation Sequences
PLA Berth<br />
<br />
III<br />
Extent of CRIII Minimum Reclamation<br />
<br />
LEGEND<br />
<br />
III <br />
FORESHORE AND SEABED TO BE RECLAIMED<br />
UNDER CENTRAL RECLAMATION PHASE III<br />
360m<br />
108m<br />
980 m<br />
840 m<br />
1088 m<br />
860 m<br />
360 m<br />
108 m
At-grade Road Networks<br />
<br />
LEGEND<br />
<br />
PROPOSED AT-GRADE<br />
ROAD NETWORKS<br />
IFC<br />
GPO<br />
<br />
III<br />
Aerial View of Victoria Harbour after Reclamation
New Central Waterfront<br />
Darling Harbour, Sydney
Darling Harbour, Sydney<br />
Darling Harbour, Sydney
Washington DC Waterfront<br />
Washington DC Waterfront
Granville Wharf<br />
Vancouver<br />
Outdoor Dinning