delay occurs consideration for extension of time will be made later no. The contractor must accept<br />

as final and binding the decision of the Divisional Engineer-in-Charge of the work.<br />

19. QUALITY CONTROL:<br />

19.1 No cement plaster will be permitted on C.C./R.C.C. work. Token penalty up to 5% of the accepted<br />

rates may be imposed on account of bad surface/work man ship.<br />

19.2 To ensure that the concrete used for the work is exactly as per the approved designs, it is<br />

necessary for the contractor to has a small field laboratory with complete equipment at the site of<br />

work, which will enable carrying out of standard test for the quality of water, sand, aggregate etc.<br />

The rate should also provide for equipment for casting, curing and testing of sufficient number of<br />

6” cubes. Testing of the cubes should be done at site or any other approved Government Testing<br />

Laboratory as and when necessary.<br />

19.3 Periodical testing of water may also be get done through approved Government Testing<br />

Laboratory if asked for by Engineer-in-Charge.<br />

19.4 Contractor’s laboratory shall remain accessible to any other representative of the Railway<br />

Administration, Engineer-in-Charge will depute his supervisory staff to supervise the work in the<br />

Field Laboratory.<br />

19.5 Contractor will also supply one P.C. with all latest attachment for monitoring of this work and<br />

one vehicle with driver and fuel etc for inspection of site work to Rly. free of cost during contract<br />

period.<br />

19.6 The concrete work shall be done in accordance with <strong>Indian</strong> Railway standard code of practice for<br />

plain reinforced and pre stress concrete for general bridge construction (concrete bridge<br />

code)/IS.456.2000. or any other relevant BIS codes.<br />

19.7 All concrete items will be measured without any reduction for the volume of reinforcements and<br />

steel structures.<br />

19.8 The contractor shall keep sufficient stand by equipment like cone. Mixer, vibrators etc. so that<br />

concreting is not affected by break down of tool & plants.<br />

19.9 Contractor with prior approval of engineer in charge may use admixture.<br />

19.10 All relevant code will be made available at field laboratory by contractor at his own cost.<br />

20. Contractor will remove all spoil material/earth etc and clear the site as per direction of engineer in<br />

charge.<br />

21. The contractor shall bring necessary equipment for earthwork, concreting, piling, and fabrication<br />

of steel as the case may be to his site office and get it examined by engineer in charge for its<br />

adequacy and suitability before the site is handed over to the contractor for commencement of the<br />

work.<br />