22.12.2013 Views

EAST CENTRAL RAILWAY - Indian Railways

EAST CENTRAL RAILWAY - Indian Railways

EAST CENTRAL RAILWAY - Indian Railways

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

awarded or taken up by him for execution, during the five years proceeding the date of opening of<br />

this tender irrespective of whether the same have been completed or are still continuing or were<br />

terminated, in the proforma enclosed as Annexure-II to this Chapter, in absence of which, the Rly.<br />

administration reserves the right to treat the tenderer(s) as having no capability/credentials and/or<br />

in case of tenderer(s) who have worked in the Railway, the aforesaid date may be complied in the<br />

aforesaid proforma by the Railway themselves on the basis of records available and the<br />

tenderer(s) shall have no right to question the corrections or completeness of such date.<br />

67.2 The figures of costing indicated in the proforma at Annexure-II will not include the cost of<br />

materials supplied free of cost by the client to the Contractor.<br />

67.3. The said proforma should be filled up by the Tenderer in respect of all the works done by him,<br />

whether for the <strong>Railways</strong> or for any other client.<br />

67.4 The tenderer shall submit photo copies of certificates and testimonials from the<br />

Clients/Departments to establish are correctness of the date given by him n the aforesaid<br />

proforma, as also certificate certifying satisfactory performance and completion of works. The<br />

Railway reserves the right to verify the correctness of such data in whatever manner they consider<br />

fit and appropriate.<br />

67.5 The tenderer(s) shall also enclose Bank certificate showing the financial stability to under-take<br />

work of such magnitude as is covered by this tender, without which the Rly. administration<br />

reserves the right to treat the tenderer(s0 as having no financial capability to handle this work.<br />

67.6 The tenderer(s) shall also submit a list of Court cases filed against/or Arbitrations in progress or<br />

demanded by him from the Rly. or other client, during the five years proceeding the date of<br />

opening of this tender in Annexure-III of these tender documents. In the event of the tenderer not<br />

given this information, the Rly. shall compile such data in the said format from available records<br />

and the tenderer(s) shall have no right to question the correctness or completeness of such data.<br />

68. LIST OF EQUIPMENTS/TOOLS, TECHNICAL PERSONNELS :<br />

The tenderer(s) shall submit list of equipment/tools with him and the list of technical personnel’s<br />

in proforma given in Annexure IV and V of this chapter.<br />

The tenderer(s) without this information may be treated as if the tenderer(s) has no Organizations<br />

and/or no equipment.<br />

NOTE:<br />

TENDER NOT ACCOMPANIED WITH THE ANNEXURE-I, II, III, IV & V DULLY FILLED<br />

AND SIGNED BY THE CONTRACTOR IS LIABLE TO BE REJECTED.<br />

Full Signature of Tenderer(s).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!