57. The concrete work shall be done in accordance with <strong>Indian</strong> Rly. standard code of practice for<br />

plain, Reinforced and Prestrassed concrete for general bridge construction (Concrete Bridge<br />

Code).<br />

58. BLOCK REQUIRED:<br />

The contractor shall specify the requirement of temporary block required for the work. Temporary<br />

blocks shall be arranged by the Engineer-in-charge of the work for the minimum period as suits<br />

the operating Deptt. of the Railway.<br />

59. The Contractor shall keep sufficient stand-by equipment like mixer, vibrator etc. for concrete<br />

work so that concreting is not effect by break-down of tools/plants.<br />

60. Weep holes shall be kept in wing wall and abutment of bridges by placing thick gauge 40mm dia.<br />

PVC pipe in the concrete before casting at spacing in elevation as decided by engineer. No<br />

deductions in volume of concrete will be made. No payment shall be made towards cost of labour<br />

& materials for placement of pipes used for weep holes.<br />

61. ELECTRICITY :<br />

The Contractor shall make his own arrangement for electricity required for running the plant and<br />

machinery, and if illumination or for any other purposes whatsoever for execution of the work, at<br />

his own cost. The Railway shall recommend his application to the State Electricity Board<br />

Authorities and render necessary assistance as possible, but Railway shall not at all be responsible<br />

for ensuring such supply of electricity.<br />

62. All concrete should be compacted by vibration except where concrete is placed adjacent to started<br />

soil in which case the compaction of concrete should be done by proper ramming.<br />

63. On the surface of finished re-inforced cement concrete, or plain concrete, no cement plaster shall<br />

be permitted.<br />

64. If during the course of execution of work the contractor has to do any unforeseen items of work<br />

not covered in the schedule of labour and materials rates 1996 and rate analysis based on the<br />

Eastern Railway schedule of labour & material rates 1996 with the accepted percentage<br />

increase/decrease in the contract will be worked out. However, the Contractor is bound to accept<br />

the rates as finally decided by the Chief Engineer/Chief Bridge Engineer, E. Rly; Kolkata.<br />

65. Works test cubes for reinforced cement concrete/plain concrete work shall be taken and tested in<br />

accordance with General conditions of contract and standard specifications (Flowed by Work<br />

Hand Book Part I & 2 GCC Feb, 2001) with upto-date amendment thereto at Contractor’s own<br />

cost & nothing extra shall be paid on this account.<br />

Contractor shall make concrete cubes as specified in IS:456-1978 for the per _________ quantity<br />

of each days work for testing the strength of concrete. 3 Cubes shall be tested after 7 days and 3<br />

cubes shall be tested after 28 days. The testing of cubes shall be done in approved laboratory or<br />

Railway’s own laboratory. The cost of making cubes and curing and transportation from site of<br />

work to laboratory shall be done by contractor. However, the cost of cement, required for making<br />

these cubes as well as for testing cubes shall be met by Rly.<br />

66. TENDERER(S) RELATIVE EMPLOYED AS GAZETTED OFFICER:<br />

In case of a tenderer(s) being an individual having a relative(s) employed in any Gazzetted<br />

capacity in the Eastern Railway or in the case of partnership firm/or company incorporated under<br />

the <strong>Indian</strong> Company Law, should any partner(s)/Director(s) or relative(s) of the<br />

Partner(s)/Director(s) or share share holder(s) be employed in any Gazzetted capacity in the<br />

Eastern Railway, detailed information about such Gazzetted employee(s) shall also be furnished<br />

in the aforesaid Annexure – I.<br />

67. TESTOMONIALS :<br />

67.1 In order to establish the capability of the tenderer(s) to under-take and tackle the work under this<br />

tender, the tenderer(s) should submit, along with the tender, the particulars of all the works