Administration (principal employer) one of the parties to he contract shall be at liberty to deduct<br />
the amount as may be a scertained in the manner as provided for in the Act and Rule or otherwise<br />
at his discretion.<br />
40. Completion of work in time :<br />
Time is the essence of the contract. The time for completion of the work as stipulated in the tender<br />
form and in para 20 of the Instruction to Tenderers and condition of tender shall be deemed to be<br />
the essence of the contract and the work shall be complete in all respects within the said<br />
completion time i.e. within Six__ months to be reckoned form the date of issue of letter of<br />
acceptance excluding the period when the work is suspended due to rains and the site conditions<br />
do not permit the work to be done due to such rains, such period to be decided by the Engineer.<br />
41. Insurance:<br />
The tenderer shall be responsible for all damages and injury caused by their work or workmen to<br />
persons, animal or things or to the work of other trades and he shall effect any insurance<br />
necessary and hold the <strong>Railways</strong> free form all responsibilities in this respect. The insurance must<br />
be jointly in the name of the tenderer and the Eastern Railway and the policy lodged with the<br />
Engineer. The tender is liable to bear expenses arising out of/from any such injury to persons or<br />
property as aforesaid and also of any award of any award of compensate or damage resulting from<br />
any such claim.<br />
42. Binding wire required for tying and binding reinforcement reinforced cement concrete work shall<br />
not be supplied by the Railway and shall be arranged by the Contractor at his own cost.<br />
43. Drawings :<br />
The work as per this contract shall be carried out as per CE’s Drg. No.<br />
C-414-2002 .<br />
44. The tenderer shall be responsible for close scouting of the drawings mentioned in the para 1 above<br />
for any discrepancy, errors or omissions in the said drawing or of other particulars indicated<br />
therein and shall approach the Railway immediately for rectification of such discrepancies, errors<br />
and omissions.<br />
45. Inspections :<br />
The Engineer or his authorised representative shall have free access to the work of contractor at<br />
all reasonable times and shall be at liberty to inspect the process of work at any such time and to<br />
reject in whole or part, any work or material that does not confirm to the specifications and may<br />
order the same to be removed, replaced or altered at the expense of the contractor. The contractor<br />
shall make available free of cost all facilities, tools, gauges, equipments for satisfactorily carrying<br />
out such inspection.<br />
46. Water required for the work and also for drinking purposes, shall be arranged by the contractor<br />
from his own sources and at his own cost. Water used for cement concrete/reinforced cement<br />
concrete and all sorts of concrete work, shall conform to the standard specifications of E. Railway<br />
and the <strong>Indian</strong> Railway Concrete Bridge Code. Railway may at its discretion take samples of<br />
water used by the contractor for the work and have it tested at an approved laboratory at<br />
Contractor’s cost and nothing extra shall be payable on this account.<br />
47. Railway land as existing and as sparable, will be made available to the contractor free of charge<br />
for building their store Godown, camp office etc. The contractors shall make their ground or<br />
developing the land as required.<br />
48. The tenderers are required to inspect the site and carry out careful examination carefully nothing<br />
all the existing structures and the various protection arrangements required. The Bridge No.<br />
_________ which is the subject of this work, is under temporary restriction at present with<br />
various rail struts and they cannot be taken away altogether for permitting the work as per this