In respect of works executed in Bihar sale Tax @ 2% of Gross amount of each bill will be<br />
recovered from all bills of the Contractor in terms of Section 25-A of Govt. of Bihar Finance Act.<br />
1981.<br />
30. Quality Assurance :<br />
(i) The Contractor shall supply all materials and execute all works according to the specifications<br />
and drawings pertaining to the work, both in respect of structural strength and finish in addition to<br />
complying with provisions of GCC.<br />
(ii) In case a Contractor executes a work which is below the specified structural strength, the work<br />
shall be dismantled and re-executed at contractor’s cost.<br />
(iii) Contractor shall make 6(six) cubes per specified in IS:186-1978 for the __________ quantity<br />
of each day’s work for testing the strength of concrete 3 Cubes shall be tested after 7 days and 3<br />
cubes shall be tested after 28 days. The testing of cubes shall be done in approved laboratory or<br />
Railway own laboratory. The cost of making cubes and curing and transportation from site of<br />
work to laboratory shall be borne by contractor. However, the cost of cement required for making<br />
those cubes as well as for testing shall be met by Railway.<br />
31. WORKMEN OF THE CONTRACTOR.<br />
(i) It would be appreciated by the Contractor that there are a number of areas of work where no<br />
amount of supervision by Railway may be possible, but only adequate competence of the<br />
workmen can ensure proper quality of work.<br />
(ii) The contractor shall, therefore, engage workmen having adequate competence and experience<br />
for doing the work at site.<br />
(iii) In case the Engineer at site finds that any of the workmen of contractor is not competent and<br />
is inexperienced and is respeatedly executing work of defective quality, he may order the<br />
Contractor to remove such worker from site of work and to replace him by another suitable<br />
worker from site of work and to replace him by another suitable worker. The contractor shall be<br />
bound the remove such a workmen/from site and to replace him suitable without any claim and/or<br />
delay.<br />
32. ENGAGEMENT OF ENGINEERING GRADUATES/DIPLOMA HOLDERS.<br />
The contractor shall be required to employ such unemployed Civil Engineering<br />
Graduates/Diploma Holders according to the ration specified below :-<br />
Contract value No. of Engineers/Diploma<br />
Duration<br />
Holders to be employed<br />
Rs.10 lakhs and above. 2 Engineering Degree holders. Duration of the const. till the<br />
completion of the work.<br />
2 Engineering Diploma holders.<br />
Fresh Civil Engineering Graduate/Diploma holders without any experience of any kind shall be<br />
taken under training , by the Contractors on stipend basis at the rate of not less than Rs._______<br />
or Rs. _____________ per months till the completion of the work.<br />
The Contractor shall give a declaration along with his tender to the effect that the Graduate<br />
Engineers/Diploma holders shall be employ by him under the particular work for which tender is<br />
submitted in accordance with the rates and ratio as specified above and that none of them is/will<br />
be related to him (contractor) failing which the tender may be disqualified. In case of wrong<br />
information having been given by the contractor which comes to light subsequently, the contract<br />
may rescinded and action taken in accordance with the Clause 61 of General condition of<br />
contract, 1969 binding on the contractor.